Traditional Culture Encyclopedia - Hotel accommodation - How to install led integrated ceiling lamp in kitchen? Detailed installation steps are introduced.

How to install led integrated ceiling lamp in kitchen? Detailed installation steps are introduced.

l? e? D kitchen integrated ceiling lamp is a new type of integrated ceiling lamp. Is it through l? e? D lamps with improved technology, you definitely need to install a ceiling lamp when decorating the room. led ceiling lamp is a particularly good choice. Not only the living room, but also the kitchen needs ceiling lights. e? D There are many brands of integrated ceiling lamps in the kitchen. You may not know which brand to choose when choosing. The following small series will introduce L in detail for everyone? e? D various brands of integrated ceiling lamps in the kitchen.

how to install the integrated ceiling lamp of led kitchen?

1. Draw a sketch

Conduct field survey to determine the distribution of room pipes, the height of the room, the location of room facilities and the location of ventilation window, and then draw a plane sketch of the room according to the size and shape of the room.

second, the design scheme

select the color of the pinch plate and the model and quantity of the main engine, and design the best matching scheme. Calculate the amount of main keel, hook, triangular keel and corner line, and determine their positions.

3. Prepare

the pretreatment of the ceiling before installation, determine the installation height of the ceiling, the middle interlayer is greater than 3mm, draw lines in four corners with horizontal pipes, and pop up horizontal lines with Mo Dou. Determine the position of ventilation window, and punch a circular hole with a diameter of 1mm on the wall with an electric hammer. Wires are embedded, including 2 lighting lines and 5 heater lines. In order to ensure normal use, 1 ~ 2 more wires can be embedded. Water pipes, gas pipes and other pipelines are treated to check whether there is water leakage.

iv. corner line installation

1. The corner lines required for the four sides of the room are cut according to the actual size of the wall. Stick the corner line required for the wall below the horizontal line, align the upper edge of the corner line with the horizontal straight line, and mark the holes of the corner line with the spacing of 1 ~ 15cm. Hit with an electric hammer? 4mm hole, when punching, it must be accurately centered on the crossed line, and the hole depth is about 3 mm. Drive the expansion pipe into the hole, and the expansion pipe shall not exceed the installation wall.

2. According to the corner angle, cut the two ends of each corner line into half of the corner, and the standard corner is 9, that is, cut the two ends of the corner line into 45, and fasten the corner line with 4×2 tapping screws, paying attention to the diagonal smoothness of the corner line, and the gap is ≤ .5mm..

3. If the corner line must be installed above the tile, the batten should be installed on the wall in front of the corner line. The thickness of the batten is equal to that of the tile, and the surface of the batten is flush with the surface of the tile. The installation method is the same as that of the corner line. In addition, the corner lines installed on the surface of the ceramic tile can also be pasted on the ceramic tile with super glue such as 52 glue, so that all fixed battens can be omitted.

V. Installation of main keel

1. Fix the installation of batten, measure the distance of 3mm upward on the plane of corner line, draw the line and use Mo Dou to play the horizontal line as the bottom line of batten. Then play the horizontal line about 4mm above the horizontal line and use 8mm? -1mm drill hole, in order to install fixed batten, hole spacing is 2-3mm, hole depth is about 5 mm..

2. Drive the batten into the hole, and the batten can't be exposed from the wall. Draw a straight line directly below the small batten to mark the hole position, nail it into the fixed batten with ordinary steel nails, and fix the fixed batten firmly.

3. Generally, the installation spacing of the main keel is 6cm. However, when the installation of the main engine is hindered according to the drawing design, the spacing of the main keel must be adjusted for reasonable distribution, and the thickness of the main keel is generally 5-1cm. Fix the main keel on the fixed batten with 4×15 self-tapping screws and ensure it is firm.

VI. Hook installation

If the length of the main keel is more than 15cm, a hook should be added in the middle, and a suitable punching installation point should be hung from the ceiling with a soft thin wire and marked. Use an electric hammer to drill a hole with a diameter of 8mm and a depth of 5mm, then determine the length of the hook, insert one end of the hook with an expansion tube into the hole, tighten the nut, and after confirmation, set the hook on the lower end and adjust it to the optimal height, and fix the hook firmly with the main keel with machine screws.

VII. Installation of triangular keel

The installation positions of lifting pieces shall be reasonably distributed on the main keel and marked. The center line of the first triangular keel against the wall is 35mm away from the wall, and the spacing of the remaining triangular keels is 3 mm. Hanging pieces are set on the triangular keels, and the triangular keels are fixedly connected with the main keels through hanging pieces. The gap between the aluminum gusset plate against the wall and the wall is about 5 mm. In case of deviation of the corner angle or inconsistency of the length of the symmetrical plane, it should be reasonably distributed. If the error is large, the triangular keel should be installed by pulling out the right angle line on the assembly surface. The triangle hanger is fixed on the main keel, which must be perforated and fastened with self-tapping screws.

VIII. Installation of the main engine

1. According to the drawing design, install the electrical main engine on the triangular keel. First, try to install the main engine with the aluminum gusset plate to determine the correct position of the main engine, and paste the drilling template at the position needed to fix the main engine, or directly drill holes according to the actual installation position of the main engine when installing the main engine, and use an electric drill to drill? 2.5mm hole, and then use the tapping screw attached to the main engine to firmly fix the main engine on the triangular keel.

2. The lamp heating host and air heating host should be connected with the N line and connected with the L line switch. When installing the lamp heating host, the heating bulb should be screwed in first, the movable screw of the lamp heating bracket should be loosened, and the position of the heating bulb should be adjusted. The exposure standard of the heating bulb is: the aluminum layer of the heating bulb is flush with the panel, the size is 3mm, and the PTC heating block of the air heating host is 5mm away from the panel.

3. The installation position of the ventilator should be within 13mm from the ventilation hole, and the length of the ventilation pipe should be 15 mm. Note that the ventilation hole should be above the ceiling and slightly lower than the outlet of the ventilator to prevent the dew in the ventilation pipe from flowing back. The diameter of the vent hole is 1 mm. After all the hosts are installed and fixed, the power-on test is carried out to ensure that the hosts can be used normally.

IX. Assembly of the aluminum gusset plate

1. Gloves must be worn when installing the aluminum gusset plate. First, tear off the plastic film on the four sides of the aluminum gusset plate, and install it from the keel of the main engine. After assembling it to the wall piece by piece, the flat-fell seam gap is consistent and the four corners of the gusset plate are aligned. Pull all the clamping positions on the trimming lines to 6 degrees, and then start the assembly of the aluminum gusset plate of the first keel.

2. Don't assemble the last two aluminum gusset plates yet. Assemble the other aluminum gusset plates and panels first, keep the whole flat, with consistent gaps, and make them into a straight line. Finally, assemble and measure the remaining dimensions. If the aluminum gusset plate needs to be cut, cut the aluminum gusset plate. After the last aluminum gusset plate is installed and fixed, assemble the last aluminum gusset plate. The gap meets the requirements of the whole, and the flat-fell seam is in a straight line with the whole.

I believe that after reading the introduction in Xiaobian above, you should know all kinds of brands of led kitchen integrated ceiling lamps. Now people's living standards have generally improved, so the demand for housing is very high, and the use of integrated materials makes people feel this. There are many types of integrated materials, and integrated lamps are one of them. You can also learn about other integrated materials in the future to increase your understanding in this regard.

Tuba Rabbit online provides free "decoration quotations, 1-4 local decoration companies, 3 sets of decoration design schemes", as well as decoration pit avoidance strategies! Click this link: /yezhu/zxbj-cszy.php? to8to_from=seo_zhidao_m_jiare& Wb, you can get it for free ~