Traditional Culture Encyclopedia - Hotel accommodation - Experience and common sense of new house acceptance What is the final acceptance of new house?
Experience and common sense of new house acceptance What is the final acceptance of new house?
A, waterproof engineering acceptance
1, waterproof acceptance of concealed works
Generally, when decorating concealed works, especially toilets, a 24-hour closed water test should be conducted to see if there is any leakage, and the ground sundries should be removed, the loose parts should be eradicated, and the uneven places should be leveled with cement mortar.
2, metope waterproof acceptance
In addition, sometimes everyone will splash on the wall, and we have to carry out waterproof acceptance of the wall. Generally, the waterproof treatment of walls is 30 cm high, and some need 1.8 m high, especially in corners. We just need to do these places well.
Second, the metope and keel acceptance
We need to check the wall and keel, but it is difficult to find out whether the wall and keel violate the construction specifications. For example, if some ceilings or parts collapse, the ceilings will become dangerous.
Third, the ceiling acceptance.
When we accept the ceiling, we must check whether the ceiling is well combined with the floor and decorative board. In addition, the keel of the ceiling cannot be distorted. Generally, the keel with better installation is firm and reliable, and the thickness of the ceiling is also particular.
Four. Acceptance of other projects
1, when installing hydropower projects, our wires can't use the same color, because if there is something wrong with the wires in the later stage, it will be difficult to distinguish them clearly after testing.
2. Generally, the color of hot and cold water pipes, cold water pipes are white and hot water pipes are red, so they cannot be mixed, because in that case, it is easy to cause water pipes to rupture and leak due to thermal expansion and contraction.
3. The glue we use for decoration must be pollution-free glue on the market, such as 108 glue.
4. When installing wires, you must use insulated tubes, because if wires or wires are exposed, it will be very unsafe, and there will be some security risks.
5, some lines do not repeat wiring or use more materials, which will only lose manpower, material resources and financial resources, because in that case, if there is a problem in the later circuit, it will be difficult to detect on the one hand and difficult to maintain on the other.
The above is about the experience and common sense of new house acceptance, I hope it will help everyone!
- Previous article:Is there a difference between steaming soup and making soup?
- Next article:What's interesting about the waters?
- Related articles
- Where is the cheap accommodation near Zhengzhou Railway Station?
- What does the hotel mean at 5 o'clock?
- Which veterinarian in Xinzhou City has a good personality?
- Excellent travel words for Hengdian Film and Television City
- How long does it take to get from Chang'an to Shatin by car, and how much does it cost?
- How much does the manager of Shangshan Kitchen of Kashi Shenzhen Airlines earn a month?
- Introduction of Sanya Nantian Hot Spring Haohanpo International Resort Hotel
- Which city and which district does Chengdong District of Xining City, Qinghai Province belong to?
- Shooting position of hyperspace player
- What do Xi 'an B&B recommend?