Traditional Culture Encyclopedia - Hotel accommodation - Expansion of XX Hotel Group
Expansion of XX Hotel Group
Grace Shaanxi Energy Saving and Environmental Protection Co., Ltd. Plan
Good hotel energy-saving service plan
First of all, the current electricity situation of the hotel
Sec. With the rapid development of the three industries, as a typical power service industry, the number of industries is increasing rapidly and competition is becoming more and more popular. Most hotels and other businesses are facing declining profits. The electrical equipment within the hotel is in order to provide guests with a comfortable environment. Each room not only has photoelectric lights, TVs, refrigerators, air conditioners, water heaters, water heaters and other electrical equipment, if they are all open, all the power exceeds 2000 watts. , which means that if a traveler is in the room and all appliances are turned on, the amount of power required by an hour exceeds 2 degrees.
A common indicator in international hotels and other industries, the day's power assigned to each room is 23 to 26 degrees. This is a hotel with 1,000 customers, which consumes about 23,000 to 26,000 industrial electricity costs every day. The cost of electricity is a major cost control cost. Electricity costs have become necessary for hotels, but they are also the most effective means of reducing hotel operating costs. Improve the competitiveness of the industry.
Analysis of power symptoms of hotels
(1) Severe energy loss in transmission and distribution systems
1. Due to seasonal or peak tourist season, The usage efficiency of the power grid is not high
When the hotel occupancy rate changes greatly, the load rate of the transformer is generally not high, and sometimes it operates with almost no load, resulting in large losses of the transformer itself and high voltage change rate, which is unnecessary waste .
The power supply line has large losses
Due to the long transmission distance, apparent power, and multi-branch power lines of the hotel’s electrical equipment, a large amount of losses are concentrated and the influence of thermal resistance line losses is , leading to a decrease in terminal voltage, a decrease in energy efficiency, and certain safety hazards;
3. Poor power quality, the number and type of large electrical equipment in hotels, power electronic devices, electrical appliances, and non-linear loads The use of electric power leads to severe load nonlinearity, voltage waveform distortion, and poor power quality, which greatly reduces energy efficiency and also affects the service life and safety of electrical equipment.
(B) The utilization rate of energy consumed by electrical equipment is not high
Room mixed load line power guest room electrical load lighting, television, water heaters and other water machines.
, most lighting equipment or old-fashioned incandescent lamps, energy consumption;
b, all electrical equipment with single-phase power supply, is a serious three-phase unbalanced line, This results in excessive zero sequence current and increased energy loss.
C. The working voltage is generally higher than the rated value, which not only allows more efficient lighting, water diversion, water heaters and other equipment, but will also cause equipment to heat up and fail prematurely, wasting energy and reducing electrical life. equipment.
2. Air conditioning equipment (cabinet or central air conditioning) First of all, the design of the hotel air conditioning system is selected. Most of them are expected to maintain a margin of about 20%, but due to the impact of the room occupancy rate,
Rarely run completely at full load; second, the air-conditioning circulating water system actually runs at a fixed maximum design flow rate, does not change with the load, and cannot reach the comfortable temperature of the host, auxiliary equipment and third Reasonable dynamic automatic adjustment ends, and the generated power utilization rate is low, which is a serious waste of energy.
(3) Guests’ energy-saving awareness, simple energy-saving management
Hotel profit business, facing customer base, temporary accommodation for foreign countries, money everywhere, and There is no need to enjoy the consumer psychology, coupled with the timely monitoring of the fate of hotel rooms and power consumption, it is because there are always bright lights during the day, and phenomena such as forgetting to turn off the lights, TVs and other electrical equipment when going out lead to very serious energy consumption waste. At the same time, most hotels manage lean management of overall energy use from the perspective of guest needs, but from the perspective of electricity consumption that supports the normal operation of equipment, rather than from the perspective of usage efficiency, energy consumption standards and equipment service life. Energy utilization rate is low.
The hotel saves the system
(1), project design
1), a hotel integrated management system using electrical equipment, which is compatible with the existing control system The system combines the implementation of integrated management application automatic control, network, multimedia technology, through unified management of lighting, air conditioning, fans, pumps and other equipment in the hotel, and significantly reduces the overall energy consumption of the power building;
2) The independently developed LCXH power grid quality control products effectively protect the system, improve power quality, and optimize the power environment;
3) The LCXH series of energy-saving terminal electrical equipment in the hotel industry Electrical remodeling.
(2), main product introduction product name
Lighting intelligent power saver lighting lamp 1), the power saver has a unique dual control terminal function;
2), high-precision, high-speed analysis capabilities;
3), steady-state voltage output;
4), multi-function monitoring. In
Fan and water pump intelligent power saver, fan and water pump equipment), the intelligent function module function works to accurately match the output power of the fan, water pump, and control motor with the actual load demand.
2), flexible ramp function generator, smooth motor soft start, motor stepless speed control during operation, always in economical, national motor operation according to production process requirements, effectively Reduce the wear of bearing mechanical parts, reduce the failure rate and extend the service life.
3), improved protection against short circuit, overcurrent, overload, and overvoltage faults, the system can protect in real time, and has its own power supply to run a dual-loop conversion/storage operation circuit to ensure that the system will not malfunction if it fails. affect production.
4), specific functions of fans and water pumps: multi-pump switching, bypass function, manual/automatic switching, water quality detection, automatic energy-saving mode operation.
5), the built-in computer communication expansion interface of the intelligent power saver fan and water pump, RS-485 serial communication protocol.
General intelligent power saver for elevators and other electrical equipment), reducing the operating current of the equipment
2) Redundant power consumption, saving
3) Suppressing harmonics Surge
4), remote monitoring... />Light saver street lights, landscape lights and other attachments), stable voltage output
2), none Level adjustable voltage
3) Friendly operation interface, easy to operate
4) Automatic bypass function
5) Wireless communication, monitoring function
p>
6), easy to install, easy to maintain serious harmonic pollution, active filter
line or equipment), it can filter out from 2 to 60 times the current from the system The dynamically injected harmonics of the unbalanced current can automatically eliminate the system vibration, with automatic current limiting function and will not be overloaded; > 2), real-time monitoring and display, dynamic compensation of changing harmonics, with a high degree of controllability and quick response.
3), the balanced three-phase voltage is stable, the power factor is improved, and the system vibration can be automatically eliminated.
4), can only filter, or filter and compensate reactive power, the power factor can reach more than 0.95;
5), parallel installation, simple and convenient installation, easy to expand, Up to 10 parallel.
The energy-saving transformation process of the hotel system is as follows:
Under "faith-based social services", the choice of Long Tianma will not change. We will use our superb technology, high-quality products, professional Experience and perfect after-sales service, support services for the majority of users.
1. Investigate the customer's power grid equipment to understand the use of power customers and the operating status of the equipment in advance. Based on the actual investigation work, it is necessary to understand the configuration, load loss, and production of the customer's equipment.
2. Complete on-site data analysis, implement the recommended energy-saving plan, submit it to the customer, and formulate a design program based on a detailed investment benefit analysis for the customer.
3. Sign a contract to communicate with customers about the program content of power saving implementation, and sign the power saving contract.
4. Production and construction preparations are submitted to the installation program for energy-saving products, equipment entry, material preparation, tool preparation, and personnel arrangements according to the customer's contract and power-saving implementation plan.
5. On-site installation, debugging, trial operation and acceptance of the project.
6. Tracking service, regular return visits, technical consultation, equipment operation, inspection, and equipment maintenance.
Benefit analysis in the case of system transformation of 5 hotels
(1) Project name
XX Hotel. High-efficiency energy-saving renovation project
(2), project situation
Power consumption of energy-saving XX hotel:
The average tariff of two 1250KVA transformer power supplies, one for use and one for backup The annual electricity bill is 1.2 yuan/kWh and is 36 billion US dollars. Lighting equipment is mainly used for energy-saving lamps, fluorescent lamps, incandescent lamps, landscape lights, etc., with an average load capacity of 500KVA, and an average of 12 hours of work per day. Central air-conditioning system, cooling pump 75KW V, III, II standby for 6 months a year, operating 12 hours a day, refrigeration pump 90KW III, dual-purpose equipment, open year-round, main drive 16 hours a day to operate . After investigating the structural characteristics of the lighting and power supply power systems of XX Hotel, as well as on-site data collection and analysis, we proposed a systematic integrated equipment energy-saving transformation of the hotel's power system to achieve energy efficiency.
1. Energy-saving engineer XX hotel installed lighting equipment, intelligent power saver for lighting, installation of smart power saver for 5 wind turbine pumps, central air conditioning accessories, street light power saver installation, landscape light installation, transformer level 2 active power Filter
2. All the above equipment network and establishment of monitoring center.
3. Remote device control via GSM/GPRS/INTERNET. I
Configure protection development system solutions to achieve local conditions, "tailor-made" to maximize energy savings:
Renovation project before transformation electricity (millions) Electricity consumption rate (%) of the Comprehensive Arts Festival in the (million) segment compared to the previous year (million yuan) 164 380 22% 82.2 2-3 years of recovery period (year)
( C), save electricity bills (for economic benefits
Time: 82.2 million in 1 year) Notes
All investment in energy-saving equipment can be recovered in less than 3 years
2 years 82.2
3 years 82.2
4-15 years 990.4 After the investment is recovered, your organization will bring direct economic benefits
- Previous article:How to get to the foreign license plate from Sanqiao to Guiyang Military Region?
- Next article:Anji Meilin Hotel Breakfast Time
- Related articles
- Do any friends know that Shanghai Peace Hotel can be visited for free? I don't want to stay. I want to go to the top floor to see the panoramic view of the Bund.
- Is it reliable to build a famous mansion in Weihai?
- Self-introduction in English for hotel interviews
- How is the milky bone soup made in the restaurant?
- Heshan Oriental Gu Yue Lake Hotel
- The Special Services of Jin Yezi Resort Hotel
- How about Tan Yuedu Xitianli Resort Hotel? OK or not? Is it worth buying?
- Is the epidemic situation of Shi Jia Mansion in Xinyuan, Jinan closed?
- How many people can the concert in Xiamen Sports Center accommodate?
- Baoji wedding photography ranking, which Baoji wedding photography company is the best, Baoji wedding photography