Traditional Culture Encyclopedia - Hotel accommodation - How to install the home direct drinking machine?
How to install the home direct drinking machine?
First, the installation method of pipeline direct drinking machine The installation of direct drinking machine is also a science. If it is not installed properly in the early stage, it is likely that there will be problems during use. The formal installation of direct drinking machine is divided into five steps, namely, pressure test before installation, installation of clean water outlet, connection of sewage outlet with other pipelines, fixing of water purifier and pipeline test.
? Installing a direct drinking fountain is different from installing ordinary household appliances, and it is very particular. From the overall principle, the installation of direct drinking machine is a process of connecting the water inlet and the water outlet.
1. Before installation, determine the pressure range of tap water. If the pressure is too high, a pressure reducing valve should be installed in front of the water inlet pipe to achieve the pressure suitable for the direct drinking machine. If the pressure is too low, a booster pump should be used to expand it. Careful consideration should be given to the location of direct drinking fountains. If it is connected with a hot water container, the direct drinking machine can be placed in a lower position.
2. Determine the position of the water outlet.
3. It is to connect the sewage outlet, water outlet and water inlet to make them a whole that can be recycled. Finally, through the water inlet and outlet test, the direct drinking machine was installed.
Second, the installation method of pure water drinking machine For this kind of water purifier, I have written many installation methods of water purifiers before. You can go to official website, a water expert, to find out. But I still take pains to mention a few more points here.
1. Install stainless steel tee, inlet ball valve and 2-point PE pipe at the water source connection. ?
2. Wrap 12- 15 turns of raw material tape on the external thread of the stainless steel tee to prevent leakage. ?
3. After inserting the rubber ring into one end of the stainless steel tee, tighten the faucet. ?
4. Screw the stainless steel tee on the faucet, and then screw the stainless steel tee on the water source interface. ?
5. Pass the bisected PE pipe through the stainless steel nut. ?
6. Wrap 12- 15 turns of raw material tape on the external thread of the split copper ball valve, tighten it on the stainless steel tee, and finally tighten the split stainless steel nut on the split pe pipe on the split copper ball valve.
7. Pull out the blue clip on the quick connect connector.
8. Press down the pipe sleeve and insert the pe hose into the quick-connect connector, at least 17mm.
9. After the hose is inserted, insert the blue clip into the lower part of the pipe sleeve, that is, the original position.
? Judging from the above situation, the process of installing the direct drinking machine is more complicated and detailed. But for consumers, there is no need to worry. Many well-made direct drinking machine merchants install direct drinking machines after sale and cooperate with professional third-party platforms.
- Related articles
- Jianshui poem (poem describing Jianshui Confucian Temple)
- Wutaishan self-help tour guide
- Business hours and play recommendation of Foshan Louvre Furniture City
- Where can I use the Sande Universal Card in Shanghai?
- Hotel internal control method
- What about Shenzhen Xinfuyuan Industrial Development Co., Ltd.?
- Business scope of the hotel
- How to get to Yijiayuan Hotel in Runfeng Market, Fengbin Road, Changxing Town, Chongming County, Shanghai
- How to get from Shanghai Hongqiao Airport to Crowne Plaza Shanghai Century
- Langzhong Zhang Yide Hotel Tel