Traditional Culture Encyclopedia - Hotel accommodation - What do hotels usually do with weak electricity?
What do hotels usually do with weak electricity?
2. Manage the operating procedures and maintenance scope of all weak current equipment and facilities in the hotel, and implement them as required.
3. Cooperate with the foreman to formulate the annual and monthly preventive maintenance plan for weak current equipment and facilities, put forward his own suggestions and ensure that the plan is completed on time according to the specified requirements and specifications. ?
4. Grasp the running situation of weak current equipment and facilities, and formulate patrol inspection system to ensure the normal play of hotel background music and TV programs and the smooth flow of telephones. ?
5. Accept and complete the operation scheduling and daily maintenance instructions of the duty room. ?
6. Put forward reasonable suggestions for equipment upgrading according to business needs, and cooperate with the supervisor and foreman to be responsible for the selection, procurement, installation, debugging, acceptance and use of weak current equipment and facilities. ?
7. Cooperate with the security department to do a routine test drill of fire fighting equipment once a month, find problems and solve them in time, and make records carefully.
Extended data:
Matters needing attention in weak current wiring construction
1: When signal cables (wires) cross power cables, they should be at right angles; When laying in parallel, the spacing should meet the design requirements.
2: Cables with different signals and different voltage levels in the same trunking shall be arranged in categories; For AC power lines and interlocking lines, a separator should be used to separate them from unshielded signal lines.
3. When laying cables along supports or trunking, they should be firmly fixed in the following places:
Answer: When the cable inclination exceeds 45 or is vertically arranged, it is on each bracket.
B: When the cable inclination does not exceed 45 and it is arranged horizontally, it shall be installed on every 1~2 supports.
C: On the first and second supports at both sides of the compensation redundancy and at both ends of the protection tube.
D: 300 ~ 400 mm in front of instrument panel (box).
E: junction box and junction box before introduction 150 ~ 300mm.
4. When installing trunking vertically in layers, cables should be arranged from top to bottom in the following specified order: instrument signal lines; Safety chain circuit; Ac and DC power supply lines;
5. The clear distance between the exposed signal line and the electrical equipment with strong magnetic field and strong electric field should be greater than1.5m; When shielded cable is used, the metal protective tube should pass through and be laid in the wire groove, which should be more than 0.8m
- Related articles
- I beg you for sex in the Spanish movie Angels, with two handsome guys and a beautiful girl, in mp4 format, please! ! If not, please leave a comment, okay?
- How to get to Motel 168, No.3-7 Xujiahui Road?
- When will the property be handed over on Borongtian Street in southwest Guizhou?
- How much is the visa to Seoul?
- Behind the M&A history of HNA Group is the desire to expand, the capital itself and the embarrassing inferiority.
- Supporting services of Chongqing Junchao Hotel
- What is the development prospect of hotel department clerks?
- What are the good hotels in Taizhou?
- How about Dongfang Lianfahong Villa? OK or not? Is it worth buying?
- What hotels and guest houses are there in Jiangqiao Town?