Installation method of hotel central air conditioning

The installation of central air conditioning in hotels is a complex project, which needs careful planning and construction. Here are a few steps for your reference:

1. Design and scheme evaluation

First of all, we should make a reasonable design scheme according to the size and use requirements of the hotel. This includes calculating the load of each room, selecting the appropriate type and quantity of air conditioning equipment, and considering the layout of piping and electrical systems.

2. Prefabrication and installation of piping system

Before construction, prefabricated piping system is needed. Usually, these pipes will be manufactured in the factory and transported directly to the site. The installer needs to open the wall or ceiling according to the design drawings and arrange the piping system. At this time, attention should be paid to ensure that the pipeline is firmly installed and will not leak or fall off due to vibration or environmental changes.

3. Install the air conditioning unit

After installing the piping system, it is necessary to start installing the air conditioning unit. Before installation, it is necessary to consider the installation position and method of the unit. The unit cannot be installed in a narrow place or near other buildings, pipelines and wires. Usually, the unit will be installed in the computer room on the ground and connected to the air treatment area inside the building through pipes.

4. Laying air duct

The layout of the air duct needs to be determined according to the specific situation of each room. When installing air ducts, you must ensure that they will not be damaged or bent. At the same time, each tuyere should be properly connected and sealed according to the requirements of the manufacturer. Only in this way can we ensure the normal operation of the whole system.

5. Connect wires and control system

Finally, it is necessary to connect the wires and control system of the air conditioning unit and the air duct system. This process requires great care to ensure that all wires and controllers are connected in the correct order. At the same time, it needs to be tested to ensure that the air conditioning unit can operate normally and each room can receive appropriate cold air.

In a word, the installation of central air conditioning needs all-round construction scheme and rigorous project implementation to ensure the normal operation of the whole system.