Traditional Culture Encyclopedia - Hotel accommodation - Installation process of wire rope for hand-cranked clothes hanger
Installation process of wire rope for hand-cranked clothes hanger
Wire rope threading method of hand-cranked clothes hanger: firstly, the accessories of hand-cranked clothes hanger need to be taken out, including hand-cranked, handle, pulley frame, corner device, lifting ring, fixing cover, expansion screw, wire rope and lifting lug. And prepare tools such as electric drill, tape measure and chalk. These are all needed when installing hand-cranked clothes hangers. Next, find the installation position of the crank handle, preferably drilling at the height of 1- 1.2 meters above the ground, and then install the crank handle. Then start to determine the position of the corner device and install the corner device on the top of the house. It is worth noting that the position of the corner device needs to be perpendicular to the position of the hand crank. After the installation is completed, start to install the four pulleys. Generally, the distance between the two sides of the pulley frame and the wall should be kept above 27cm, the horizontal distance in front of the two mixing wheels should be kept within the range of 18-20cm, and the vertical distance should be not less than 45cm. Of course, the specific situation has to be analyzed in detail. After all, every balcony is different in size. After the position of the mixing wheel is determined, it can be punched, and then two expansion screws are installed on the single wheel frame, two expansion screws are installed on the double wheel frame, and two expansion screws are installed on the corner device. It is worth noting that six expansion screws need to be installed here. Next, start installing the hand crank. First, fix the hand crank with the expansion screw and tighten it. Then install the handle, the same is true, tighten it with screws, and finally shake out the wire rope in the handle until the handle can't turn. It is worth noting that in order to prevent the occurrence of wire disorder, it is necessary to pull the wire rope when shaking it. Then take out two wire ropes with the same length, use one wire rope to pass through the corner device, then pass through one of the double pulley frames, and pull the wire rope to the position close to the crank. Finally, pull all the steel wire rope at the other end through the corner turner, then hang the button of a section of steel wire rope shaken out by the hand crank on the end of the steel wire rope of the corner turner, and finally install the fixing cover. Next, pull out two wire ropes on the double pulley and thread them on the single pulley, and then install the fixing cover. Then, cut off the excess wire rope, and the cutting position is above the crank. Then, four lifting rings are sleeved on the two ends of the two air drying rods, and the two ends of the air drying rods are sleeved with plugs. This is the installation procedure of the air drying rod. After the drying rod is installed, two small accessories can be installed.
- Previous article:How many hotel commercial trash cans are there?
- Next article:When does the hotel usually clean the room?
- Related articles
- How does Cambodia Youth Hostel feel in Siem Reap?
- How far is it from Dongguan Changan Bus Station to Dongguan Songshan Lake Junyi Hotel?
- Around Shenzhen Six Star Motor Hotel
- How to get to Tianjin Olympic Hot Spring?
- Beijing airport T3 duty-free shop, Canon 500D price.
- What is the telephone number of black dragon Marketing Center in Chenzhou Linglong Xintiandi Phase III?
- A hotel employee in Chongqing was photographed scooping gutter oil from a trash can. What are the reasons for employees to do this?
- Park History of Banff National Park
- How to take a bus to Fuan Cemetery in Zhangshu 'ao, Hengyang?
- One of the three or four sentences in Shuzhen Zhu's Autumn Night can best reflect the poet's feelings.