Traditional Culture Encyclopedia - Hotel accommodation - How many steps does the hotel take from decoration to use?
How many steps does the hotel take from decoration to use?
The hotel decoration process is divided into three stages: preliminary preparation stage-decoration execution stage-data sorting and handover.
The preparatory stage of the hotel decoration process:
1, the blue prints.the design
The decoration of star-rated hotels is different from ordinary decoration, and must comply with the decoration regulations of star-rated hotels of the National Tourism Administration. The success of star-rated hotels lies in two aspects; One is hardware and the other is software. Hardware is decoration and equipment installation, which is directly related to the future operating costs of the hotel. Owners, managers of relevant departments of hotel management companies, relevant personnel and designers, etc. Design drawings should be made to determine whether the functional layout of the hotel is reasonable and meets the requirements of star-rated hotels. Whether it is in line with the normal business and energy saving of future star-rated hotels, whether it is in line with water supply and drainage, whether the pipeline layout is reasonable, whether it is convenient for future metering in various regions, whether the living pool meets the requirements of star-rated hotels and whether it is convenient for maintenance. Whether the power of electric transformer is enough, whether the power of distribution box is enough, whether it is convenient for future measurement in various regions, and whether the layout of lamps meets the requirements of future energy saving. Whether the functional layout of weak current telephone and network cable is reasonable, and whether the voice control equipment meets the needs of meetings and banquets in star-rated hotels. Whether the layout of air conditioning functions is reasonable, whether the fresh air volume is reasonable, whether the noise exceeds the standard, and whether the air conditioning power is sufficient. The fire control function must be determined by local fire control audit, fire protection zoning, smoke control, spraying and smoke detection. , it is necessary to conform to the specifications, but also to conform to the decoration effect. The functional layout of kitchen equipment is to determine the kitchen area according to the number of people dining; Whether the air supply volume and exhaust volume meet the standards and whether the smoke exhaust noise exceeds the standard.
2. Bidding by system or type of work
The system includes: external wall, water, electricity, weak current, fire protection, HVAC, elevator, decoration, kitchen equipment, conference equipment, etc.
3, the relevant construction permit formalities.
The facade renderings will be sent to the Urban Construction Planning Bureau for approval, and the interior decoration drawings will be sent to the fire department for approval, and the decoration construction will be implemented according to the fire audit opinions. The smoke exhaust and drainage drawings of boilers and kitchens shall be sent to the Environmental Protection Bureau for approval, and the local construction bureau shall handle the decoration and construction permit, and go through the formalities of zero-hour electricity and water consumption related to the construction site.
Hotel decoration process decoration execution stage
A, material approach acceptance:
1, strictly control the quality of material acceptance. The main materials shall have the qualification certificate, ex-factory quality certificate, certificate of approval and instructions of the supplier or processing unit. Must meet the requirements of fire protection and environmental protection.
2. Check whether all materials are consistent with the signed contract.
3. Check whether the thickness and flatness of the blockboard meet the requirements, and fill in the acceptance record.
4, acceptance veneer thickness, color difference is in line with the requirements and fill in the acceptance record.
5. Check whether the thickness of gypsum board meets the requirements and fill in the acceptance record.
6. Check whether the cement meets the design requirements and fill in the acceptance record.
7. Check whether the color difference of wallpaper meets the requirements and fill in the acceptance record.
8. Check whether the color difference of marble meets the requirements and fill in the acceptance record.
9. Check whether all ceiling materials meet the design or contract requirements, and fill in the acceptance record.
10. Check whether all pipelines meet the design or contract requirements, and fill in the acceptance records.
1 1. Check whether all wires meet the design or contract requirements, and fill in the acceptance record.
12. Check whether all hardware and sanitary wares meet the design or contract requirements, and fill in the acceptance records.
13. Check whether all equipment meets the design or contract requirements, and fill in the acceptance record.
14. Check whether all furniture meets the design or contract requirements, and fill in the acceptance record.
15. Check whether all electrical appliances meet the design or contract requirements, and fill in the acceptance records. All materials should be filed. Attach the material acceptance form.
Second, the site management:
1. Work out the construction project schedule (external wall, water, electricity, fire protection, heating and ventilation, decoration) together with the winning bidder or team.
2. Sign the following responsibility letters with relevant construction team leaders, and file the data: A, on-site electricity safety responsibility letter B, on-site fire safety responsibility letter C, on-site civilized construction responsibility letter D, on-site construction personnel personal safety responsibility letter.
3. Hold a coordination meeting for the construction team leader every day, coordinate the problems between the construction teams in time, solve the problems in time, and require the garbage on the construction site to be cleared.
4, by the company's security management personnel, on duty 24 hours a day, regularly patrol the site, found that the construction team has illegal situation to stop in time, to register the site construction personnel and issue a pass; Register the people who go in and out of the construction site without a pass, and the safety management personnel must check all the items carried by the people who go out. Take-away tools must be signed and approved by the construction personnel of Party A and Party B before being released.
5. Check the site progress against the site construction schedule every day;
6, patrol the construction team every day, check whether the construction is in line with national standards, and open a rectification contact list for irregular places to order the construction team to rectify;
7. If the site construction is not in conformity with the drawings, timely adjust or contact the design unit according to the site conditions, so as not to affect the construction period. 8. According to the national construction specifications, carry out daily inspection on the suspended ceiling project on site, and check whether it meets the suspender spacing 1 1m, main dragon spacing1m, secondary dragon spacing of 4545cm, gypsum board joint spacing of 0.3-05cm, gypsum board fixing screws and half spacing1.
Top-grade wood veneer shape inspection, the selected wood must be dry, crack-free and corrosion-free; The fastening firmness of interfaces and connections, whether the base has been treated with fire prevention, whether the seams, color differences and patterns of decorative panels are aligned, and whether the flatness, verticality of internal and external angles are recorded.
Check the shape of the wall veneer, and the selected wood must be dry, crack-free and corrosion-free; The fastening firmness of interfaces and connections, whether the grass-roots level has been treated with fire prevention and moisture prevention, whether the seams, color differences and patterns of decorative panels are aligned, flatness, verticality of internal and external angles, etc. should be recorded and archived.
Paint inspection, whether it meets the construction technology, the surface should be filled with ash first, and the thickness is moderate. After drying, it should be polished repeatedly until it is smooth and smooth without defects and cracks, and whether there are color differences, bubbles and beads; Surface smoothness, and make the corresponding records on the toilet floor inspection, check the moistureproof treatment of the wall. The polished surface of ceramic tile or marble should be smooth, the polishing degree should meet the requirements, the texture arrangement should be uniform, the incision should be straight, the corners should not collapse, the plane should be free of cracks, and the thickness should be basically the same; Whether the paving is empty and whether the joints are flat.
The bottom layer of the wallpaper is oiled twice, without leakage, and the seam of the wallpaper is flat and the pattern lines are vertical and horizontal. Check the smoothness of the ground and the firmness of the base. The polished surface of ceramic tile or marble should be smooth, the polished degree meets the requirements, the texture arrangement is uniform, the incision is straight, the edges and corners do not collapse, the plane is free of cracks, and the thickness is basically the same; Whether the paving is empty and whether the joints are flat.
Windows and doors should be installed horizontally and vertically. The wood of the door frame must be strong, and the door frame should be moisture-proof against the wall. The upper and lower dimensions must be the same, and no wood line can be connected in the middle. The stitching should be smooth and smooth. Check whether the opening is flexible and whether the height, size and position meet the design requirements.
Lamps and lanterns check whether the wire construction technology meets the requirements, whether the grounding, zero connection and lightning protection are reliable, whether the lighting meets the hotel operation requirements, whether it is on the same branch line and make corresponding records for archiving.
Check whether the installation position of hardware and electrical appliances is correct, whether the fixation is firm, whether it is convenient to use and whether the quantity is complete, and make corresponding records and files.
Whether the water supply and drainage pipe bracket is fixed firmly, whether the drainage pipe has a slope and can't accumulate water, whether the rain, sewage, waste and ventilation pipes are separated, whether the water supply and drainage pipes are unobstructed, whether the pressure test reaches the working pressure 1.5 times, and whether the pressure meets the standard after holding the pressure for 24 hours. Maintenance is convenient, and the corresponding records are archived.
Check whether the air supply and smoke exhaust system works normally and meets the design requirements, whether the duct construction technology meets the requirements, whether the noise meets the requirements, and whether the air leakage rate meets the requirements, and make corresponding records and files.
Check whether the air conditioning system works normally and meets the design requirements, whether the duct construction technology meets the requirements, whether the noise meets the requirements, and whether the air leakage rate meets the requirements, and make corresponding records for archiving.
Check whether the fire fighting system, spraying work, alarm and fire hydrant work normally.
1. The materials under construction need to be confirmed by both parties, and must be signed by the heads of both parties and stamped with the official seals of both parties.
2. Timely statistics corresponding supporting equipment (sanitary ware, hardware and electrical appliances, carpets, intensifiers, lamps, etc.) the number of items purchased. ) Late stage of hotel renovation.
3. Track the installation and debugging of facilities and equipment in time, check whether the facilities and equipment conform to the equipment stipulated in the contract, and make corresponding debugging reports and file them.
4. Make corresponding rectification according to the reasonable requirements put forward by the hotel business department.
Three. accept
1, assist the fire department in acceptance, list the unqualified items during acceptance, and the relevant decoration unit or team will immediately rectify until the relevant department issues a written acceptance report.
2, to assist the public security monitoring and acceptance, in the process of acceptance does not meet the requirements, by the relevant decoration unit or team immediately rectification, until the relevant departments issued a written acceptance report.
3. Assist the quality inspection station to accept the elevators and boilers of special equipment, list the unqualified items in the acceptance, and the relevant decoration units or teams will immediately rectify them until the relevant departments issue a written acceptance report.
4. Assist the health and epidemic prevention station in kitchen acceptance. Items that do not meet the requirements at the time of acceptance shall be rectified immediately by the relevant decoration units or teams until the relevant departments issue a written acceptance report.
5. Assist the Environmental Protection Bureau in the acceptance of environmental protection facilities, list the items that do not meet the requirements at the time of acceptance, and the relevant decoration units or teams will immediately rectify until the relevant departments issue a written acceptance report.
6. Relevant project leaders (water, electricity, weak current, fire protection, equipment, decoration, etc. ), supervision related personnel, relevant responsible personnel of the winning construction unit, and hotel management related personnel conduct overall acceptance of the decoration completed project (including facilities and equipment). And fill in the decoration acceptance report; List items that do not meet the requirements at the time of acceptance. The relevant decoration unit or team will immediately carry out rectification. Until it meets the requirements of relevant star-rated hotels and issues an overall acceptance report.
Data collation and handover stage of hotel decoration process:
1. Collect all kinds of data that need to be filed, and collect the corresponding facilities and equipment certificate, instruction manual and warranty card, and hand them over to the hotel operator after the renovation is completed.
2. Hand over all the fixed assets list, legal documents and contract texts to the hotel operation and management finance department for the hotel to file.
3. Hand over the key to the hotel owner together with the hotel human resources department.
4. Hand over relevant facilities and equipment with relevant departments of the hotel.
5. List the contact telephone number of the construction team leader, and give the warranty telephone number of the relevant facilities and equipment manufacturers to the hotel project for future warranty contact.
6. Hand over relevant completion data to relevant departments of the hotel.
7. Review the decoration final accounts. After the above work is completed, the preparatory personnel leave the site and the decoration is all over.
- Related articles
- Cui Junhe's family introduced.
- Status of Freshmen's and Women's Dormitories in Oriental College of Shandong University of Finance and Economics
- From Xu Dong Village to Daoxiang Xihe Palace in Han Jie and Wanda Chuhe River in Wuhan.
- What is the somatosensory wind speed of yoose¡Á keith haring combined with high-speed hair dryer?
- How to make beef sausage
- Introduction of Hiromi Kawakami's Role
- How about Chengdu Quiet Hotel?
- Is it convenient to go to Xishi Villa in Yalong Bay? How should I get there?
- What homestays can you recommend to travel to Changsha?
- What¡¯s fun in Changsha! If starting from the bus station! How to get there