Traditional Culture Encyclopedia - Hotel accommodation - What is HR's job? What exactly does it do?

What is HR's job? What exactly does it do?

What does HR do? HR stands for human resources, which means human resources. HR usually refers to the work of human resource management.

The work content of human resource management is to predict the organization's human resource demand and make a human resource demand plan, recruit and select personnel and effectively organize, evaluate performance and pay salaries and effectively encourage them, and effectively develop them in combination with the needs of organizations and individuals in order to achieve the whole process of optimal organizational performance.

Under the guidance of economics and humanism, human resource management refers to a series of activities to effectively use relevant human resources inside and outside the organization through management forms such as recruitment, selection, training and salary, meet the current and future development needs of the organization, and ensure the realization of organizational goals and the maximization of member development.

Academic circles generally divide the content of human resource management into eight or six modules:

1, human resource planning;

2. Recruitment and configuration;

3. Training and development;

4. Performance management;

5. Salary and welfare management;

6. Labor relations management.

What does archaeology do? What is the specific job? What are the responsibilities of infrastructure builders?

A, according to the work instructions issued by the Ministry of infrastructure, set up on-site construction management team, set up on-site representatives, equipped with professional construction personnel. If the construction personnel stationed at the site carry out their work, manage and mobilize them on behalf of the leaders, and obey the infrastructure department, the site management shall be implemented in accordance with the Construction Law, Regulations on the Management of Construction Projects and national norms.

Second, site safety management, quality management, management practice in group planning, third, construction management personnel, and the implementation of the veto system of safety issues.

The third is the construction site representative who is responsible for the examination and approval of various project design institutions and the final signing of engineering materials.

Four professionals are responsible for examining and approving the construction, and reviewing and confirming the professional construction scheme of each project. Responsible for construction, construction progress, professional construction quality and professional construction safety.

Five construction workers will patrol the construction site at any time, cooperate with the material engineer to be responsible for the quality control of materials and cooperate with the professional supervision of site management personnel. If the economy changes, the resident representative of the project shall be reported, which shall be the same as the representative in charge of the project site in combination with the estimation.

Six, every project implements lifelong quality.

Seven, from the beginning, every professional staff should be responsible for signing the technical data about the accuracy and authenticity of engineering, science and information in the construction process. After the completion of the project, organize and supervise the feedback of technical information and the signature certification of personnel related to economic data (such as hidden records and measurements). I should have been familiar with it before

8. Construction personnel began to make professional drawings. After the testing is completed, professional drawings, projects and buildings began to collect all kinds of data, statistics and make preliminary arrangement.

9. The construction personnel shall establish a management account, and the engineering data have been signed, changed, negotiated for special projects, and economic visas are well documented, and the original data are stored in economic data. At the same time, in order to speed up the project cleaning work on the project bidding quotation list, after each change, the supervision and construction unit should be urged to report the completion of single foreign exchange settlement as soon as possible.

Ten, after the start, the construction personnel must stick to the scene, in case of night construction should follow the employment opportunities. As long as the construction is carried out at night, the project shall be reported to the site by the representative in advance to confirm the inspection or acceptance by other means.

Other tasks assigned by the director of capital construction department.

What does the hotel room inspection work specifically do-manage and supervise the daily work of the whole guest room floor according to the work flow and system of the hotel and the department-arrange staff shifts and vacations, keep employee vacation records, arrange and mobilize personnel according to the reception tasks-supervise and assess the performance of floor foreman and employees, with clear rewards and punishments-handle the interpersonal relationship between employees fairly and reasonably. Encourage staff morale-assist the housekeeping manager to plan and arrange the training of staff's business operation skills and procedures and hotel rules and regulations-check the hygiene of public areas on the floors and keep them in good condition-check all VIP rooms and long-term houses, record and meet the special requirements and taboos of VIP and long-term guests-check at least 20% of the total rooms every day and make records to ensure the cleanliness of the rooms, the standard of goods placement and the normal operation of equipment. -Assist the manager in handling guest complaints, visit guests regularly, and record lost or damaged items. ...

Hope to adopt. Thank you.

The general worker in the factory is a general worker who does specific work, that is, he can do it without much work experience. Depending on what factory you enter, many of them are assembly lines and do the most basic work. Do whatever the leader tells you to do. Such as packaging and production.

What does the reserve supervisor do? His job is to sell insurance and form a sales team. AIA has higher entry requirements and stricter screening for reserve managers, and will certainly provide more intensive and systematic training and better welfare benefits.

If you are interested in insurance work and meet the entry requirements of "reserve supervisor", starting from the reserve supervisor will mean greater challenges and better prospects!

What does a foreign teacher assistant do? It depends on whether you are a foreign teacher assistant at school or in a company.

Most foreign teachers' assistants are responsible for helping foreign teachers solve life problems, such as water and electricity, and helping foreign teachers get familiar with the school's curriculum and management system. Sometimes they will be made teaching assistants, that is, to maintain class order, and students will translate if they don't understand.

What is Medicine 365 Cloud? What exactly does it do? Medicine 365 Cloud is a platform launched by Yunuo Co., Ltd., which is mainly a platform for enterprises to exchange data and information in the field of pharmaceutical circulation. What does the blast furnace piping tool do? Check all kinds of cooling water pipes, and of course replace them. Usually go out to work after the attack. Physical activity is much less than that in front of the stove, but there is much work in the gas area, so we should pay attention to safety.

Plumber's responsibilities: Responsible for the normal water supply of blast furnace cooling device, inspection and maintenance of blast furnace body system, and replacement of tuyere sleeve. Responsible for the maintenance and troubleshooting of soft water closed-loop system. Be responsible for the inspection and emergency treatment of cracking of blast furnace body and bottom, gas (steam) and fire. Ensure that the blast furnace tuyere peeks at Kong Mingliang during normal production. Responsible for the rearrangement of inlet filter screen, regular cleaning of reflux tank, sanitation of tuyere platform, and maintenance of furnace sanitation. Responsible for coal injection in front of the furnace, complete coal injection and stop operation, check and maintain all injection facilities from distributor to spray gun to prevent pulverized coal from escaping and blocking. Check the tuyere every half an hour, pay attention to the position of the spray gun and the size of pulverized coal, report the problems to the foreman in time and deal with them immediately. Timely find the leakage of the cooling device of blast furnace and the sleeve of blast furnace slag outlet to stop water supply, deal with it in time, and be responsible for pressure inspection and regular pickling. Responsible for the collection and storage of spare parts and materials for water system and coal injection system. Stick to your post, carefully record the implementation and handover of water-coal system, and collect, sort out and analyze technical data. Participate in the pre-shift meeting, after-shift meeting, safety meeting and accident analysis meeting of the team, and apply the five-day management thought in the process of team activities.

What exactly does a TV station do as a director? There are only two kinds of people in TV stations, those who work and those who don't.

Those who don't work are called leaders, and those who work are called directors.

Think for yourself. Everything you see on TV is made by the director except the cleaning program.

What is the specific purpose of pre-trial security? What do you do? First, there is no pre-trial preservation in law, and there is pre-litigation preservation.

Second, what is pre-litigation preservation?

Pre-litigation preservation refers to property preservation before litigation. If an interested party fails to apply for property preservation immediately because of an emergency, which will cause irreparable damage to his legitimate rights and interests, he may apply to the people's court for property preservation measures before bringing a lawsuit.

Three. Legal basis: People's Republic of China (PRC) Civil Procedure Law.

1 article 101 if an interested party fails to apply for preservation immediately due to an emergency, which will cause irreparable damage to its legitimate rights and interests, it may apply to the place where the preserved property is located, the domicile of the respondent or the people's court with jurisdiction for preservation measures before bringing a lawsuit or applying for arbitration. The applicant shall provide a guarantee. If no guarantee is provided, the application will be rejected.

After accepting the application, the people's court must make a ruling within 48 hours; Those ordered to take protective measures shall be executed immediately.

If the applicant fails to bring a lawsuit or apply for arbitration according to law within 30 days after the people's court takes the preservation measures, the people's court shall lift the preservation.

2. Article 103 Property preservation shall be by sealing up, distraining, freezing or other methods prescribed by law. After the people's court has preserved the property, it shall immediately notify the person whose property has been preserved. Property that has been sealed up or frozen shall not be sealed up or frozen again.

3. Article 105 If the application is wrong, the applicant shall compensate the respondent for the losses suffered due to preservation.