Traditional Culture Encyclopedia - Hotel accommodation - Civilized construction measures for hotel construction projects?

Civilized construction measures for hotel construction projects?

Civilized construction measures of hotel construction projects are very important. The formulation of construction measures is to better ensure the progress and quality of the project, and the treatment of every detail is very important. Zhong Da Consulting will explain the civilized construction measures of hotel construction projects for you.

In order to reduce the impact of construction on the surrounding environment and traffic, our company will strictly abide by the requirements of the municipal government on civilized production, make civilized construction an important part of construction management, institutionalize it, and strive for a civilized model construction site. Therefore, a civilized construction working group with the project manager as the team leader is specially established, and a full-time administrator is set up to be responsible for the daily work of the group. The staff of relevant departments of the company and professional construction team leaders are members of the working group to ensure that all measures of civilized production are implemented in all aspects of construction management.

A, the basic requirements of civilized construction management

Strictly implement the regulations of Guangzhou municipal government on civilized construction, and formulate them in combination with the actual situation on site.

Establish a flexible and diverse publicity and education system, improve the consciousness and consciousness of civilized construction of managers and construction teams, regularly check and compare the civilized construction situation on site, find out the shortcomings and focus on improvement.

Do a good job in the general layout design of the construction site, report it to the supervision engineer for approval, and arrange it in strict accordance with the general layout plan, and do not change it at will. All vehicles must be washed before leaving the construction site, and the roads in the factory area shall not be polluted.

Second, the civilized construction management measures

1, set up full-time civilized construction site management personnel, whose specific responsibilities are: site environmental sanitation; Noise protection treatment; Cars need to be washed with high-pressure water guns when entering and leaving; Fire prevention in autumn and winter; Cleaning, washing, watering and dust removal of the surrounding environment; Clean up the silt in the sewage ditch in time; Sanitary management and supervision of toilets and dormitories. , create a good civilized construction environment.

2, the overall site capacity and appearance requirements

2. 1 Closed construction management must be implemented in the construction site.

In response to the Guangzhou Municipal Government's urban image project policy of "one change every year, one change every three years, and 20 10 big change", in order to realize our company's goal of creating a civilized construction model site, a solid brick wall is set up outside the whole site for enclosure.

2.2 Gate, sign, car wash tank and sludge discharge

The main entrances and exits of the construction site shall be provided with regular gates with a height corresponding to the fence and a width of 6m. The gate shall be made of galvanized water pipe or angle steel, and its front shall be sealed with iron plate and painted. The company logo should be on the door, and the construction logo should be hung next to the gate.

Concrete cast-in-place grooves with a width of 300mm and a depth of 400mm are set at the entrance and exit of vehicles on the construction site to form a rectangular car washing station with a width of 3m and a length of 5m and a three-stage sedimentation tank equipped with high-pressure flushing water guns. Vehicles must be cleaned before leaving the construction site.

Residual mud discharge should strictly implement the relevant provisions of the city.

2.3 regional division

The construction area should be separated from the living area. Temporary buildings, building materials and construction machinery should be erected or stacked neatly according to the area.

3, civilized construction management regulations

3. 1 outdoor construction site

The construction site must be equipped with mud and sewage outflow prevention devices to keep the drainage unblocked; On-site concrete mixing, mortar location and other operating places should be kept clean; The ground should be built with hard floor as required.

3.2 Laying of indoor construction site and temporary water and electricity pipelines

Indoor lighting should be sufficient; There is no water, no mud, and there is no phenomenon of throwing garbage down at high altitude; Temporary construction debris and garbage should be piled up in the designated area and cleaned regularly; Mixing mortar must have containers or pads, and the site should be cleaned after construction; Waste mortar concrete should be cleaned up in time.

Before construction, temporary water and electricity pipelines should be laid according to the construction organization design, and the line layout should be beautiful and firm.

3.3 Site Drawing Specification

The office and conference room of the construction site should have the construction layout, construction plan and schedule, meteorological records, post responsibility division, etc. These materials on the wall should be uniform in specifications, neat in words, clear in content, in line with the actual situation, and adjusted in time with different stages of construction.

3.4 Management of migrant workers

Establish files of migrant workers and register "cards"; Workers and civilians must receive necessary education on safety, fire prevention, public security, hygiene, legal knowledge and professional ethics before entering the site; The construction monitor must be fully responsible for the operating personnel under his jurisdiction, and the company will sign a letter of responsibility for fire prevention, public security and hygiene with the team leader to strengthen the management of migrant workers' dormitory.

3.5 Management requirements for the living quarters on site:

According to the arrangement of construction layout, build on-site living facilities; On-site living quarters should be equipped with qualified toilets and bathrooms for the use of construction personnel in accordance with the requirements of relevant documents of the municipal government.

3.6 building materials management regulations and mechanical equipment management regulations

On-site warehouse should be closed, well ventilated, watertight, with stow-wood, which can prevent fire and theft; Materials piled in the open air should be piled up reasonably according to the construction layout, and all kinds of materials should be classified into varieties and specifications, and all kinds of materials should be identified according to the company's quality system documents; Packaging bags should be recycled in time, and the remaining materials should be piled up, cleaned and disposed of in time.

The foundation part of the mechanical equipment fixedly installed on the construction site shall not accumulate water. According to different equipment types, set up operation console and hangar, and hang the company's unified safety operation warning signs in conspicuous places; Small machines and tools installed on the construction site should be provided with simple and effective temporary rainproof facilities; All kinds of construction machines and tools should be maintained in accordance with the regulations after work and kept clean and tidy; Before all kinds of mechanical equipment installed on the construction site enter the site, the mechanical surface should be painted and renovated to keep the mechanical equipment clean and complete; On-site power supply and distribution trunk line installation and erection should be smooth and tidy, phase line zero line laying should be neat and orderly, and the erection height must conform to the specifications; The distribution box and switch installed on the construction site adopt the unified standard box of the company, and the door of the box is locked.

3.7 Site dormitory erection standards and dormitory hygiene

The dormitory has good shelter from the wind and lighting, and the male and female dormitories are clearly divided. It is forbidden for men and women to live together; The passage has sufficient lighting; The erection of the bed should be unified. In principle, a single bed should be implemented, and the width of the main indoor passage should not be less than1.2m.

Beds should be clean and tidy, and safety helmets, tools and daily necessities should be placed neatly and orderly; Dormitories should be kept clean, free from cobwebs, sewage, dirt, odor and waste water outflow, and each room has persons responsible for hygiene, public security, fire prevention and family planning. There is no dirt and sewage around the dormitory area.

3.8 Environmental beautification

Plant plants, flowers and trees at the entrance of the construction site, office area and appropriate living places to beautify the construction environment.

For more information about project/service/procurement bidding, and to improve the winning rate, please click on the bottom of official website Customer Service for free consultation:/#/? source=bdzd