Traditional Culture Encyclopedia - Hotel accommodation - How many stops are there on Tianjin Metro Line z4?

How many stops are there on Tianjin Metro Line z4?

Lead: Tianjin Metro Line z4 is one of the lines currently under construction in Tianjin, connecting the north and south areas of Binhai New Area with the core area. The first phase of Tianjin Metro Line z4 is still under construction, and the second phase of the project is expected to lead to Hangu Street and Binhai North high-speed railway station, and the start time has not been determined. Then, how many stops are there on the z4 line of Tianjin Metro? When will the first phase of Tianjin Metro Line z4 be opened to traffic? The following is a detailed introduction of Bian Xiao.

How many stops are there on Tianjin Metro Line z4?

There are 23 stations on the z4 line (12 underground station, 1/kloc-0 overhead station,1ground station).

_ _ Website Settings:

Yingcheng Street Station, Binhai General Hospital Station, Central Fishing Port Station, Yusha Road Station (formerly Industrial Park Station), Aircraft Carrier Park Station and Heng 'an Road Station (formerly Information Park Station)

Binhai Nankai Middle School Station, Heshun Road Station, Sino-Singapore Eco-city Station (original ecological city station), Beitang Station, HKUST Station and columbus avenue Station.

Fifth Avenue Station, Third Avenue Station, TEDA Station, Binhai Cultural Center Station, Binhai Station and Ren Rong Road Station (formerly Dongbao Road Station)

Jinlin Island Station (formerly Nandajie Station), Dagu Shipyard Station, Youshi Xincun Station, Xincheng No.2 Station and Xincheng No.5 Station.

_ _ Path Area:

The first phase project of Tianjin Metro Line z4 (also known as Bintie Line 2 and Line B2) passes through Central New City, Yujiapu, Tian Jian Business District, Development Zone, Beitang, Sino-Singapore Eco-city and Hangu, and ends at Hangu Yingcheng Street Station.

When will the first phase of z4 Line be opened to traffic?

Line Z4 will be opened to traffic in 2024.

The first phase project of Binhai Railway Line 2 (Z4) was financed by TEDA Urban Rail Investment Development Co., Ltd. in PPP mode.

The line runs from Han Cai Road in Hangu to Central New Town, with a total length of 42.4km (about 14.6km underground and about 27.8km overhead). There are 23 stations (underground 12, overhead 165438 and ground 1 seat), and PPP mode is adopted. It is estimated that the daily passenger flow will reach 276,000 after opening to traffic.

In April 2020, the organization completed the PPP bidding. At present, the bidding for the construction of the whole line has been completed, and the project department of the north section of Haihe River has all been completed and settled in, among which the elevated section of the eco-city area (Han 'an Road Station-Yongding Xinhe Bridge) has been erected; The pile foundation construction of Beitang Station has been completed; Diaphragm wall construction of TEDA Station: pipeline cutting and reconstruction construction of Cultural Center Station: the main construction of Ren Rong Road Station-Jinlindao Station in Yujiapu area is two stations and two sections. It is expected that the northern section will be opened to traffic in 2023. In 2024, the whole line was opened to traffic.

Commencement Time of Binhai New Area Phase I Project of Tianjin Metro Line Z4

The first phase of the Z4 line of Binhai New Area starts from the central business district of Tianjin Free Trade Zone, connecting the north-south direction of the new area to Hangu, and will connect and transfer with Beijing-Tianjin Intercity and Jinbin Light Rail Line 9 on the way, which is an important rail transit artery of Binhai New Area.

Gao Tianjin Urban Rail Investment and Development Co., Ltd. Chairman, General Manager and the person in charge of the project construction and development unit said: According to the construction schedule, the project will start on 20 16.

Progress of Tianjin Metro Line z4 (continuously updated)

Updated on September 8

On September 7th, the general layout (adjustment) of the architectural design scheme of seven stations in the first phase of rail transit Z4 line in Binhai New Area was announced, namely Xincheng No.6 Station, Xincheng No.5 Station, Xincheng No.3 Station, Beitang Station, Han 'an Road Station (formerly Information Park Station), Aircraft Carrier Park Station and Central Fishing Port Station. Up to now, Station Z4 18 has been planned and publicized.