How to write the minutes of hydropower project safety meeting

Minutes of on-site regular meeting

Meeting place: conference room on the fifth floor of the sales department of real estate company.

Meeting date: 201165438+February 22nd Start time: 15:00 End time: 16:00 Moderator: Jiang Pingyuan Weather: sunny.

Participants: See the signature form of participants.

Number of meetings: 29th.

Meeting contents:

At present, the main work is that the civil construction team will rectify the places with quality defects; Install the elevator; Install the fire hose; Install water and electricity pipelines and wear strong and weak electricity; Scraping porcelain on the inner wall; Install air conditioning; Carry out the secondary decoration of the shopping mall. There are nearly 30 teams and groups working in the whole project.

The focus of today's meeting is safety, progress and quality.

First, security.

1. At present, the safety focus of the whole project is the podium. After the outer frame of the podium was removed, all the holes were exposed. We can only strengthen the internal team management without rebuilding the external frame. All teams and groups, especially those living on the second and third floors, are required to pay attention to safety issues when entering and leaving the construction site and approaching the border. Safety helmet and safety belt must be worn when working at high altitude or on an outer frame.

2. Strengthen the awareness of fire prevention in the construction site. Each team must pay attention to fire prevention when cooking, and keep firewood away from the kitchen door; Welders must pay attention to fire safety when welding; Workers should pay attention to extinguish cigarette butts when smoking; Eliminate fire safety hazards and prevent accidents.

3. After the outer frame is removed, the outer wall glass of the skirt building is being installed, which has potential safety hazards. Under the condition of not rebuilding the outer frame, each team is required to strengthen the management of the workers in this team, with special emphasis on family members and other personnel unrelated to the construction not to enter the upstairs. Now that the outer frame has been dismantled, the street is outside the building, which can prevent all the tools or materials used by the construction team from falling from the sky.

4. Now the air-conditioning and secondary decoration teams come into play, and there are many construction teams, so the electricity consumption for temporary construction is frequent. The electricity used for temporary construction in the construction site is randomly pulled and connected, and the overhead height of the line is not enough, which is serious and there are potential safety hazards. Each team is required to have a special electrician to manage and wire in strict accordance with the "three-phase five-wire system" to avoid safety accidents.

Second, the construction progress

Now it is a multi-job crossover operation, so it is necessary to arrange workers reasonably and coordinate the relationship between teams in order to make the construction go smoothly. The problems existing in the construction progress and the factors affecting the construction progress are:

If the building materials are not purchased in time, please ask the construction unit and the construction unit to purchase in time; ZuoYeDui did not invest enough manpower to increase the number of workers, strengthen management, speed up the construction progress, and ensure the smooth completion of the overall progress.

Third, quality:

1. In terms of quality, the focus is on the rectification of lintel cracking and wall cracking on floors 15, 16 and 17 of office buildings.

2. Office buildings, residential buildings, shopping malls * * * bathroom floor tile, wall tile paste is unqualified, empty drum, horizontal flat vertical does not reach the designated position to carry out rectification. Uneven pits should be adjusted to a height. Other teams accept warnings.

3. The secondary decoration belongs to the suspended ceiling, and the spacing of light steel keel is between 800 ~1100 mm. During inspection, it is found that the spacing of light steel keel in some parts is out of specification, which requires the construction team to make adjustments. Avoid this situation in the future.

Four, the last site meeting, my supervision engineer asked the fire door subcontractor to apply for the subcontract qualification and raw materials. So far, they haven't sent it for inspection. Stop work and rectify without inspection.

Five, the main engineering entity detection is the most important factor affecting the progress of the project. Now some engineering entities have been tested, but the beams and columns born in the hotel have not been tested, and none of the plates have been tested. It is impossible to accept the foundation and the main project, even if the decoration drawings come out, it can't be decorated. Therefore, the relevant teams are required to complete the work and inspection as soon as possible.

VI. Settlement observation of Fortune Center Building should be completed as soon as possible and the settlement observation data of the building should be improved.

7. Let me talk about the problem of drilling beams and slabs several times in shopping malls to leave holes for escalators. In this case, please make a decision after careful consideration by the construction unit. Don't make a plan without considering anything. Repeated construction will not only cause economic losses, but also bring unsafe hidden dangers to the building structure. In addition, if you decide to do this, you must first obtain the consent of the construction party and the supervision party, and more importantly, you must obtain the consent of the designer before construction.

By the way, there is an escalator with an opening next to the stairs now. Is it significant? In addition, the first floor is on the vehicle passage in the basement. Does it affect vehicle traffic?

8. The Fortune Center Project belongs to the subcontracting team of Xishuangbanna Ding Xin Building Decoration Engineering Co., Ltd., such as steel structure component, exterior wall and interior wall coating component, fire protection component, waterproof component, national characteristics component, doors and windows component and secondary decoration construction team. , and as soon as possible, raw material inspection, inspection lot, itemized data inspection and other information inspection. Separate subcontracting, such as fire doors, elevators, air conditioners, etc., will also be reported to the industry simultaneously.

Nine, the underground shopping malls must solve the underground drainage system before tiling, and then tiling.

10. There is still one month before the Spring Festival holiday. Please arrange holidays for all construction teams and discuss the unified time of holidays and holiday assembly. Please ask the real estate company to increase financing and prepare the artificial salary for the workers during the Spring Festival.

Xi。 On February 22nd, 20 1 165438, the transportation materials of the service construction team's well sub-frame were handed over to other construction teams, and the temporary construction electrical equipment was handed over to the secondary decoration team. Need to be rectified, such as uneven squatting pits in public toilets and empty brick walls, as of 20 12 10.

Twelve, belong to the scope of the labor service construction group of garbage has been basically cleaned up, secondary decoration or fire safety door construction of garbage by its team to clean up. Yunnan jianxie supervision consulting co., ltd

Issued by mangshi Fortune Center Project Supervision Department: 201165438+February 20th.