Traditional Culture Encyclopedia - Hotel accommodation - Paste brick contract template
Paste brick contract template
Article 1 of Party A's model bricklaying contract:
Party B:
In accordance with the Contract Law of People's Republic of China (PRC) and relevant laws and regulations, and following the principles of equality, voluntariness, honesty and credibility, both parties have reached the following agreement on matters related to the Agreement on Bricklaying of External Walls through consultation:
I. Project name:
2. Scope of contract: external wall roughening and bricklaying.
Third, the contract form: no material contract.
Four. Construction period: construction period
Verb (abbreviation of verb) settlement method: the final settlement is based on the actual area, 300*300mm paper bricks, and the lump sum price per square meter is RMB: 40 yuan (? : 40 yuan /m2, including pay-off, punching, netting, leveling, napping, veneering, edge sewing, curling, dripping, cleaning, edge mending, vacancy mending, floor cleaning until it is qualified). Materials such as oxalic acid after cleaning shall be prepared by Party A, and other tools shall be provided by Party B. ..
Six, quality requirements: wall tiles should be flat, oblique, seam-to-seam, seam width is uniform, seam grid is straight, color is consistent, each corner is at right angles, and the brick tower at the corner of Yin and Yang is connected in the right direction. According to the current national and local construction engineering acceptance specifications, it is qualified.
Seven. Payment method: according to the requirements of the construction period and schedule, according to the completed engineering quantity, 70% is brushed 15 yuan/㎡, 80% is pasted on the external wall in advance according to the actually completed engineering quantity, and the final payment is paid within 30 days after the project acceptance and settlement.
Eight. Rights and obligations of both parties:
1. After Party B's operators or staff enter the site, they must accept the three-level education and safety technical disclosure from the project department. Operators must abide by moral behavior and must not steal, rob, fight and other uncivilized behaviors. Party B is prohibited from assisting wanted criminals to carry out the construction site; In the process of construction, Party B shall strictly abide by the rules and regulations of production safety, and must understand the safety precautions, and shall not arbitrarily destroy the on-site safety protection measures. If any safety problems occur, Party B shall bear the responsibility alone, which has nothing to do with Party A. ..
2. Party B shall not delay the construction progress without reason and must meet the requirements of Party A's construction progress. Party A has the right to lodge a claim for failing to meet Party A's schedule requirements.
3. Party A shall provide water, electricity, vertical transport vehicles and temporary product stacking places free of charge (Party B shall protect unpaved products and paved products; Product protection such as anti-collision damage and anti-theft must be done); Party B shall not arbitrarily waste the materials provided by Party A when laying exterior wall bricks.
4. Party B must unconditionally cooperate with Party A to do the external wall pull-out test. If the test is qualified, the test fee shall be paid by Party A; If the test fails, in addition to the test fee paid by Party B, Party B shall also pay the claim fee for materials and construction period. ..
5. In the process of construction, arrange in strict accordance with the requirements of the project department and the construction specifications of each process. If the legitimate requirements of the management personnel cannot be accepted, Party A has the right to terminate the agreement and leave by itself, and all the adverse consequences arising therefrom shall be borne by Party B..
6. Party B shall provide a fixed substitute on site. Failing to do so within the time limit, a fine of RMB 3,000 will be imposed.
9. Force Majeure: If one party fails to perform this contract as agreed due to force majeure, it may be exempted from liability in part or in whole according to the influence of force majeure, but it shall notify the other party in time and provide proof from the date when the force majeure ends.
X dispute settlement: disputes arising under this contract shall be settled by both parties through consultation.
XI。 Other terms:
1. This contract shall come into effect as of the date of signature and seal by both parties. This contract is made in * * * copies, with each party holding one copy. Treat each other one day.
2. The annexes to this contract and various written documents formed during the performance of this contract, after being signed and confirmed by both parties, become an integral part of this contract and have the same legal effect as this contract. Unless otherwise specified, the sequence of interpretation shall be based on the time when the document was generated. For matters not covered in this contract, both parties can sign a supplementary agreement through consultation, which has the same legal effect as this contract.
Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _
Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Model Text 2 of Ceramic Tile Employer (Full Name): (hereinafter referred to as Party A)
Contractor (full name): (hereinafter referred to as Party B)
Based on the principles of voluntariness, fairness, honesty and credit, both parties have reached an agreement on the bricklaying construction of this construction project, and in combination with the specific conditions of this project, the following agreement is hereby signed:
I. Overview of the Project
1, project name: Yancheng Xintan Industrial Neighborhood Center Resettlement Group 1- 10# Building.
2. Project Location: Yancheng Xintan Industrial Neighborhood Center
Second, the scope and methods of project contracting
1. Project content: clay brick for external wall of north and south facade of 1-8# building, 60*60 antique brick for lobby on the first floor (including skirting line), 30*30 antique brick for corridor lobby, gatehouse column, stair tread and ramp Dutch brick.
2. Contracting method: contractor. Within the scope of project contracting, Party B shall undertake the labor service of the construction project, use small machines and tools, and bear all responsibilities and risks such as the construction period, quality and safety of this project. (excluding tax).
3. Engineering construction requirements: Construction must be carried out according to the engineering drawings and bill of quantities provided by Party A ... The specific methods of this project are as follows:
A, lobby on the first floor: 60*60 antique bricks (including skirting)
B, two stair tread bricks with no edges, 60*60 antique bricks (finished products processed by Party A);
C. Corridor lobby: 30*30 antique bricks;
D, gatehouse column:? Material, color, size? To be determined;
E. Gangway: Dutch brick;
F. External wall of north-south facade: clay brick (constructed according to the drawing);
G, accept.
Three. Comprehensive unit price (RMB) and payment method
The lobby 1 and 60*60 antique bricks (including the baseboard) on the first floor of the external wall of the north-south facade, the unit price of stair tread brick is 34 yuan (the unit price of stair tread brick does not include the rest platform, and the unit price of entrance platform is 25 yuan per square meter), and the gate post is 36 yuan per square meter. Ramp per square 25 yuan. Corridor hall per square 25 yuan.
2. Principle of engineering quantity settlement: the project adopts comprehensive unit price (no price adjustment), and the engineering quantity is settled according to reality.
3. Payment method: During the construction period, the basic living expenses of the workers shall be properly paid and settled upon completion.
Fourth, the term of the contract.
Complete the construction period according to Party A's requirements (indoor work shall not be stopped in rainy days), so as not to affect Party A's completion acceptance.
Five, quality standards and quality management terms
All ceramic tiles in this project shall not be empty, and must be accepted by 2m feet. Otherwise, all losses such as empty drum materials and labor shall be borne by Party B. ..
Six, safe and civilized construction management
1, Party B must obey the safety and civilized management of Party A after entering the site for construction. You must wear safety helmet when entering the construction site, or you will be fined 500 yuan/person-time. Safety belts must be fastened correctly for aerial work, or you will be fined according to regulations.
2. Party B shall do a good job of disclosure to the construction personnel before entering the site, and must be safe and civilized in the construction process. In case of safety and civilized accidents, all economic losses shall be borne by Party B, which has nothing to do with Party A. ..
3. Without the consent of Party A, Party B shall not allow anyone to stay, work or engage in other life activities in the built house. Once found, Party B shall pay 1 1,000 Yuan/person to Party A..
Seven, design change, project visa management
A, all design changes can only be carried out with the consent of Party A. If Party B's unauthorized construction changes lead to increased expenses or changes in the use function of the building, Party A will not bear the corresponding expenses, and all consequences arising therefrom will be borne by Party B. ..
B. When Party B puts forward the design change requirements during the construction, it must first report to Party A, and Party A shall coordinate with the owner, supervision department and other departments to solve them, and the design change can only be implemented with written information.
C. Party B must implement any change requirements of Party A. In case of economic and construction period changes, it shall be verified by Party A. If Party B fails to implement them, it shall be deemed as a breach of contract.
Eight. Liability for breach of contract and others
1. Any party's failure to fully perform its obligations is a breach of contract. The economic losses caused by breach of contract shall be borne by the breaching party, and the principle of responsibility sharing for the delay of construction period caused by breach of contract is: Party A's breach of contract: the construction period shall be postponed appropriately, and Party B's breach of contract: the construction period shall not be postponed.
2. During the performance of the agreement, if either party unilaterally terminates the agreement without justifiable reasons, it is a unilateral breach of contract, and the breaching party shall bear the responsibility for all economic losses caused to the other party. If Party B fails to perform the agreement, Party A entrusts others to complete the construction or repair work, and all expenses and losses shall be borne by Party B. If Party B withdraws from the project, it will not be settled. In case of shutdown or material loss due to Party A's reasons, the construction period will be postponed.
3. Party B cannot perform? Quality, progress, safety and civilization? Party A has the right to terminate the contract unilaterally if it meets the relevant specifications and requirements. Party B withdraws unconditionally (without settlement).
Nine. Number of copies of the contract: in duplicate, each party holds one copy.
Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _
Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Model Bricklaying Contract 3 Party A:
Party B:
Through friendly negotiation between Party A and Party B, Party A subcontracted its own external wall bricklaying project on the first floor of Kailongcheng Community in Longling to Party B for construction. Get the following * * * knowledge:
1. Construction site: Kailongcheng Community, Longling.
2. Subcontracting method and unit price, single package, the contractor's first-floor external wall shall be bricked according to scattered area, with 40 yuan per square meter, and the wall shall be jointing and washed. Floor tiles for walkways on the first floor are 25 yuan per square meter. Stair steps are 30 yuan for each step, and each corner platform is three steps. Triangular brick and skirting line are per meter 15 yuan. The dimensions and contact angles of the above engineering materials shall be provided by Party A. ..
3. Payment method: Party A shall pay the appropriate living expenses in advance 10 days after Party B enters the site for construction. After 0/0 days of construction/KLOC-0, Party B shall pay the corresponding living expenses in advance, and pay 80% of the actual project amount to Party B at the end of the month, and the remaining 20% of the balance shall be paid to Party B in one lump sum within 7 days after the project completion and acceptance.
4. Party A must accept Party B's construction within one week after completion. If Party A does not accept it, it will accept it by default.
5. If one party violates the above contract, it shall bear a penalty of 5,000 yuan.
6. The above contract shall come into effect after being signed by both parties.
7. Supplementary Contract: During the construction period, if Party A has no materials after four days, Party A will pay cost of living allowance to Party B at the rate of 100 yuan per person per day.
This contract is made in duplicate, one for each party.
Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _
Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
- Previous article:Los Angeles travel guide
- Next article:How to use S sofa between lovers
- Related articles
- Where is a bar in Songjiang?
- Classic travel guide to Yunnan in summer vacation!
- How much is it to take a taxi from Guiyang Railway Station to Renaissance Jinyang Hotel?
- What hotels are there in Dehua?
- Wang Guangwen artists information.
- How to get to the Champs Elysé es in Shenzhen from Futian Railway Station?
- What is the penalty for the US Mission to complain about the hotel?
- How to run a small supermarket
- How to use the electric bed?
- Japanese Hotel Birthday