Traditional Culture Encyclopedia - Hotel accommodation - What factors should be paid attention to in hotel furniture customization?

What factors should be paid attention to in hotel furniture customization?

? First, positioning

Positioning involves many aspects. Here, we will focus on the grade and service life of hotel furniture closely related to the return on investment. The grade is suitable for attracting target guests and meeting the expected income; Appropriate service life can avoid underinvestment or overinvestment (for example, a hotel lease of 5 years and a furniture service life of 3 or 8 years are unreasonable).

Second, materials and technology.

According to the positioning grade and service life, the materials and manufacturing technology of customized hotel furniture are determined. By the way, the grade depends largely on the design scheme and production process. Even ordinary materials can produce good results for furniture with good effects, and there are also bad furniture, even if expensive materials are used, they may not produce good results. Some materials and structures will go wrong in a year or two, and some materials and structures can still be used in a decade or two. In this regard, as an inexperienced hotel investor, it is not easy to grasp the degree. We should study more and try our best to cooperate with honest and reputable hotel furniture manufacturers to avoid bringing trouble to the later hotel operation. In terms of appearance workmanship, most investors still know a lot about it, but how to control it is somewhat difficult. What key points should be paid attention to in customizing hotel furniture and how to control them?

1) material: the variety is clear and the supervision in the production process is effective;

2) Structure: define the structure in the production process and supervise it effectively;

3) Functional size and appearance: the purchase volume is large, and it is best to sample when time permits. After the sample is satisfied, it will be received in strict accordance with the sample, and generally there will be no problem. If the purchase quantity is too small or the time is not allowed, it is generally not a problem to ask the manufacturer to take out the production construction drawing, clearly mark the appearance size, detail size, functional size and production process, and find a slightly professional person to review it.

4) Surface technology: mainly in two aspects, one is painting-it is generally no problem to determine the paint sample when placing an order; The first is soft packaging-the effect of the first product is well controlled, and the products behind it are not easy to go wrong.

5) Process supervision: blank (before painting and flexible packaging)-painting (referring to products with flexible packaging, before flexible packaging)-before packaging.

Third, the construction cycle

The construction period is also one of the costs. Generally, the furniture production time of non-European medium-sized hotels is about 40 days, and the construction period of European medium-sized hotels is about 50 days. The latest installation completion time of hotel fixed furniture should be two weeks before trial operation, and the latest installation completion time of movable furniture should be one week before trial operation. Allow at least one week for possible finishing and cleaning.

Fourth, the price

Price is one of the most important aspects for all hotel investors, and the standards must be clearly defined before talking about price. As long as the standards are clear and honest manufacturers are selected for comparison, the work will be simple.

The above four points are points that should be paid attention to when customizing hotel furniture.