Question 1: How to apply for a hotel fire permit? You have to make your situation clear, what is the area and how many rooms are on the first floor.

According to my experience, if a residential building is converted into a hotel, it is not in line with the fire code. On the one hand, an outdoor ladder should be added to the stairs.

I don't think you can solve this problem by yourself. Punishing fires requires the cooperation of many parties. If you don't prepare anything now, it will take four or five months at the earliest for a set of processes to come down, which is estimated to be forty or fifty thousand.

Question 2: How to apply for a fire permit when opening a hotel? Fire safety inspection includes two aspects: one is before the opening of commercial public gathering places, and the other is large-scale * * * activities. Your hotel belongs to the first type. Fire inspection is nothing more than several aspects, one is water, the other is electricity, the other is evacuation and spacing, the other is decoration materials used, and the other is equipment and facilities, so much. First of all, according to the fire protection code for building design, if your hotel has only one evacuation staircase, it can only be opened below the third floor (including the third floor). This is a principle. If you can't achieve this, you can't find a relationship. If there are two attack stairs, the distance between the two evacuation stairs should not exceed 80m. Our place is a little loose, there is only one staircase, and there is no requirement to close the staircase. I don't know what happened over there. Stairs are the key. If you have enough evacuation stairs, you usually get half.

Question 3: What documents does the hotel need to apply for a fire permit? When the project starts-drawing review-sampling inspection of fire-fighting products-electrical inspection after construction-automatic fire-fighting debugging inspection-fire-fighting acceptance inspection-inspection before opening, the owner needs to provide a copy of business license and legal person ID card, as well as a certificate of entrustment, that is, a power of attorney.

Question 4: What procedures and fees do hotels need to apply for fire protection certificates? According to the size of the hotel, there are three procedures before opening: architectural design approval, completion acceptance approval and fire safety inspection.

If the total construction area is more than 1 000 square meters, the fire protection design review of construction projects, fire protection acceptance of construction projects and fire safety inspection of public gathering places before use and operation shall be handled;

If the total construction area is less than 1 000 square meters, it shall handle the fire protection design filing of the construction project, the fire protection filing of the completion acceptance of the construction project and the fire safety inspection before the operation of the public gathering place;

The difference is that the filing procedure is simpler, and the same thing is that all qualified design and construction companies need to provide professional services.

There is no charge for fire control procedures.

Question 5: How to handle the fire control procedures in small hotels can only answer your questions about fire control procedures. It is free to go through the fire control formalities. You need to bring your business license and property right certificate (if you rent a house, you need to bring a copy of the lease contract) to the local fire brigade. Because you want to open 20-30 hotels, the area must be more than 400 square meters, and it will be very troublesome to handle fire control procedures. You should pay great attention to site selection and decoration. Such as: safe passage (whether it is at least 1.4M wide, whether there are at least two evacuation doors, and if it is multi-storey, there are many rules), building materials, fire doors, fire fighting equipment, automatic fire extinguishing system, etc. It depends on the size of the hotel you want to open. I suggest you go through the fire control formalities with an acquaintance, because the water inside is very deep (such as fire fighting equipment). Fire fighting equipment needs to be tested, and the testing fee is paid by itself. Normal test, two emergency lights, two evacuation signs, five fire extinguishers, the optical test cost is about 7000 yuan). If you don't know anyone, go to the store selling fire-fighting equipment near your district and county fire brigade, because those who sell fire-fighting equipment usually do fire-fighting projects on their behalf, and the relationship between opening a store near the fire brigade is very good. Running around talking about the hotel you want to open, they will quote you. This is the most economical way. If you do it yourself, it will be very troublesome and expensive. Finally, if you have no acquaintances in the local fire department, it is ok to find acquaintances in the public security bureau. The fire brigade is under the control of the local public security bureau (although the fire brigade does not sell the accounts of the public security bureau). After reading other people's answers, I want to add that you don't need to go to the police station in your jurisdiction for the record. Do you want to open 20-30 hotels? Public gathering places over 400 square meters belong to the second-class fire department and are managed by the local fire brigade. The police station can't find you.

Question 6: How to apply for a fire inspection certificate when opening a hotel? First of all, you need to send the fire protection drawings and decoration drawings to the fire department for review and filing (if it is a previous building reconstruction, you need the previous acceptance certificate, drawing review and filing certificate, etc.). ), as follows.

Fifteenth the construction unit shall provide the following materials to apply for fire protection design audit:

(a) the construction project fire design audit declaration form;

(2) Legal identity documents such as the business license of the construction unit;

(three) the qualification certificate of the design unit;

(4) Fire protection design documents;

(5) Other materials as prescribed by laws and administrative regulations.

If it is necessary to apply for construction project planning permission according to law, it shall provide a certificate of construction project planning permission; Temporary buildings that need to be approved by the competent department of urban and rural planning according to law, which belong to crowded places, shall provide supporting documents approved by the competent department of urban and rural planning.

Twenty-first construction units shall provide the following materials when applying for fire control acceptance:

(a) the construction project fire inspection declaration form;

(two) the project completion acceptance report and the completion drawings of fire control facilities;

(three) the quality certificate of fire protection products;

(four) the certification documents and factory certificates that the building components, building materials and decoration materials that meet the requirements of fire prevention performance meet the national standards or industry standards;

(five) fire facilities inspection documents;

(six) the legal identity certificate and qualification certificate of the construction, project supervision and testing unit;

(seven) the construction unit's business license and other legal identity documents;

(eight) other materials as prescribed by laws and administrative regulations.

Twenty-second fire control institutions of public security organs shall organize fire control acceptance within twenty days from the date of accepting the application for fire control acceptance, and issue opinions on fire control acceptance.

Twenty-third fire control institutions of public security organs shall, in accordance with the evaluation standards for fire control acceptance of construction projects, organize fire control acceptance of the contents approved by fire control design.

The fire control institutions of public security organs shall issue fire control acceptance opinions for the construction projects that are qualified through comprehensive evaluation; If the comprehensive evaluation conclusion is unqualified, it shall issue unqualified opinions on fire control acceptance and explain the reasons.

Fifteenth public gathering places put into use and business, the construction unit or user shall apply to the local people's public security organs at or above the county level for fire safety inspection.

The fire control institution of the public security organ shall, within ten working days from the date of accepting the application, conduct fire safety inspection on the place according to the technical standards and management regulations on fire control. Without fire safety inspection or inspection does not meet the requirements of fire safety, it shall not be put into use or business.

Question 7: I registered the hotel, but the fire permit didn't come down. Can't I get a business license? First of all, it is not the same thing to distinguish between "audit opinions" and "safety inspection opinions before opening"

If there is no business license, it is estimated that there is no fire safety inspection before opening.

You can consult the local fire department. According to your account, you need to apply for the "Certificate of Fire Safety Inspection before Business".

Because, if the hotel had gone through the security check before opening in 2008, it would be easy to apply for a business license at that time, and there is no reason not to apply.

Question 8: How to apply for a hotel fire permit? You have to make your situation clear, what is the area and how many rooms are on the first floor.

According to my experience, if a residential building is converted into a hotel, it is not in line with the fire code. On the one hand, an outdoor ladder should be added to the stairs.

I don't think you can solve this problem by yourself. Declaring fire protection requires multi-party cooperation. If you don't prepare anything now, it will take four or five months at the earliest to get down to a set of processes, which is estimated to be forty or fifty thousand.

Question 9: What procedures does the hotel need to apply for a fire permit? According to the size of the hotel, there are three procedures before opening: architectural design approval, completion acceptance approval and fire safety inspection.

If the total construction area is more than 1 000 square meters, the fire protection design review of construction projects, fire protection acceptance of construction projects and fire safety inspection of public gathering places before use and operation shall be handled;

If the total construction area is less than 1 000 square meters, it shall handle the fire protection design filing of the construction project, the fire protection filing of the completion acceptance of the construction project and the fire safety inspection before the operation of the public gathering place;

The difference is that the filing procedure is simpler, and the same thing is that all qualified design and construction companies need to provide professional services.

There is no charge for fire control procedures.

Question 10: Hotel Fire Certificate The fire certificate you mentioned is actually a "fire safety inspection opinion" approved by the fire department for the opening of your hotel. With this opinion, you can go to the industry and commerce and related departments to apply for other licenses. The procedure is as follows:

1. Find the fire audit opinion of the building where the hotel is located (if the building was built before 1998, it is not necessary, because the fire protection law was not promulgated at that time, please ask the local street office to issue a certificate).

2. Find the fire inspection opinions of the building where the hotel is located (as shown in brackets above).

3. Send the interior decoration drawings of your friend's hotel to the fire department for review;

4. After passing the examination, continue to report to the fire department for internal decoration acceptance:

5. All relevant employees of the hotel should apply to the fire department for fire safety training certificate;

6. After the acceptance, the employees also obtained the fire safety training certificate and began to declare the fire safety inspection to the fire department before opening. If they pass the customs, they will get fire safety inspection opinions.

That's the procedure. Is it troublesome? Hehe, I can't help it. I hope it helps you.