Traditional Culture Encyclopedia - Hotel accommodation - Summary of HVAC professional and technical work

Summary of HVAC professional and technical work

Lead: Work summary is a comprehensive and systematic general inspection, general evaluation, general analysis and general research on the work in a period of time, analyzing the shortcomings of the results and drawing experience. The following is my summary of HVAC professional and technical work, hoping to help everyone.

Chapter 1: Overview of HVAC professional and technical work

I graduated from Anhui Institute of Architecture in July 20xx, majoring in building environment and equipment engineering (four years undergraduate). I joined Shaoxing Branch of Zhejiang Lian Jian Engineering Design Co., Ltd. in July 20xx, and have been engaged in HVAC design. In August, 20xx, I was awarded the title of Assistant Engineer of HVAC Engineering.

From 20 10, I participated in Xiangjiang Ming Di Community, Shaoxing Affordable Housing (Goose Block), Zhejiang Fuyuan Hotel, City Star Apartment, Shaoxing Dream City, Macalline Huaxia City, union buildings, China CITIC Bank Building, Huijin Square (renovation project), Didang Phase II Central Business Plaza, Wuxi China Europe Science and Technology Building and Guanlan Haoting (South Building). There are over 60 jobs.

During my five years in HVAC design, I will encounter different situations in the face of different projects. In the process of constantly discovering and solving problems, my professional and technical level has also been greatly improved. From the state of continuous exploration and learning at work when I just graduated, I am now able to stand alone. For example, the Huijin Square project in Yuecheng District of Shaoxing City: the project is located in Yuecheng District of Shaoxing City. The second floor underground is a garage, which is also used for civil air defense in wartime. The first basement is for supermarkets, businesses and ancillary buildings, and the first to fourth floors are for businesses. The engineering design includes-1F~4F comfort central air-conditioning system, fire smoke exhaust design of the whole building, and civil air defense design of the second floor underground, which is a comprehensive construction project. During the design of this project, I kept communicating with Party A and the architectural profession to determine the most suitable air conditioning scheme. In this project, I strive to give full play to my technical foundation, and at the same time coordinate various professions and cooperate with the decoration profession. In this project, a lot of professional knowledge has been well used. How to calculate the load; Design of ventilation duct; Selection of fan coil unit, new fan, main engine and cooling equipment. From previous book knowledge to practical knowledge.

Through a large number of engineering design practices, I have mastered the design contents of central air conditioning system, fire fighting, smoke control and civil air defense in various multi-storey (high-rise) houses and public buildings, understood the HVAC construction technology to a certain extent, and comprehensively mastered the design and selection of various equipment in HVAC, fire fighting and civil air defense systems. Have a full understanding of energy conservation and rational use of energy and environmental protection, and keep consistent in design.

Communication is a bridge for learning and improvement. Due to the expansion of design business, new situations and problems are constantly appearing in the content of design work, as well as technical and equipment information of various new materials, new technologies and new equipment. In order to engage in the application of related new design techniques in the future and implement the national policy of energy saving and rational utilization, we need to constantly learn and adapt, and strengthen communication with relevant government departments, manufacturers and construction enterprises, which can benefit us a lot.

"Scientific design, enthusiastic service. Customer first, reputation first ". In my design work, I pay attention to implementing the company's quality policy. Since engaging in the design work, we have achieved the "0" accident without violating a national mandatory provision, which has been unanimously affirmed by the company and the owner.

Learn with an open mind and respect science. If you encounter problems in your work, you should consult the old comrades in your major, respect the professional authority, insist on convincing others by reasoning, not blindly follow, not be paranoid, learn from each other's strengths and make up for each other's weaknesses. Communicate more with professional colleagues, communicate more, and don't keep it. Always take the interests of the owners as the leading factor and fully reflect the will of the owners. On the basis of understanding the owner's working ideas, put forward suggestions for improvement, and save the money that should be spent and the money that should not be spent. Dare to put forward their own reservations about some unreasonable claims of the owners for their reference. Persuade opinions that violate national norms. It can be said that "scientific design" is endless, there is no best, only better.

While paying attention to doing our job well, we should also pay attention to the cultivation and improvement of personal cultivation and professional ethics. I always insist on studying the laws, regulations, rules, systems, norms and standards related to the design and construction of construction projects, so as to be loyal to my duties, abide by the law, be honest and self-disciplined, work hard and constantly strive to improve the quality of work. Be able to respect and love my job, abide by the law, be down-to-earth, diligent and meticulous in my work; Help others in life, unite and be friendly, and care for others. Obey the arrangement of the leader, actively complete the tasks assigned by the leader, be able to integrate into the team, unite as one, give full play to the collective wisdom and strength, and devote myself to the work. Can actively guide and lead the comrades who have just joined the work, so that they can always feel the care and love of others, change their roles as soon as possible, and urge them to continuously improve their professional level and be better qualified for the work as soon as possible. Ask experienced seniors humbly at work and so on. Through online study, I participated in various continuing education activities and expert lectures, constantly updating my limited knowledge and constantly improving my professional and technical level.

Service is also productivity. In the project, I strengthened communication and cooperation with the owner, supervision unit, construction unit and quality supervision department. In the implementation, it fully embodies the technical requirements of design documents and the relevant provisions of national norms. My diligent and responsible work style has been fully affirmed by the owner and won the understanding and respect of the construction unit.

"Ask the canal to be so clear that there is a source of living water." In the future work, I will continue to study, pay attention to innovation, strengthen communication, adhere to the concept of "creating value with wisdom, contributing to society and repaying myself", and strive to achieve the goal of "providing scientific, advanced and reasonable technical services to customers".

Chapter II: Overview of HVAC professional and technical work

Time flies, time flies. Unconsciously, it has been half a year since I joined the big family of xxxx. Over the past six months, I have grown from an inexperienced fresh graduate to a HVAC engineer. Looking back on the past six months, I was confused when I first joined the company, had difficulties when I first arrived in Taiyuan, had troubles when I encountered problems, and of course had excitement and joy after solving the problems ... Now, I summarize my work in the past six months as follows:

I am honored to have the opportunity to join xxxx, and I am also lucky to be exposed to the xxxx project. So I sincerely thank the company leaders for their trust and training. I know this opportunity is hard to come by. Since joining xxxx, I have studied hard, accepted the opinions of leaders and colleagues with an open mind, and been strict with myself. Work hard and communicate with leading colleagues in time. I have accumulated some work experience and made great progress.

Review the situation of xxxx project in the past six months, from the initial difficulty of the project, hitting a wall everywhere, to various technical problems encountered in the project progress. With the joint efforts of all leaders and departments of the project department, we strive to overcome all difficulties. At the end of the year, we completed the hoisting work of air duct supervisor, water pipe supervisor, water pipe riser, ventilation and smoke exhaust in the standard basement, which achieved certain results, but at the same time exposed many problems.

First of all, the project department should unify its thinking, have the same goal and work hard for it. At first, all the work was difficult to progress. A large part of the reason is that the project department has just been established, and the departments are unfamiliar and tacit understanding is not enough. Of course, this problem has been well solved with the progress of the project under the coordination and command of the company leaders. I believe that xxxx project department is already a mature project department. As long as all departments work hard, cooperate hard and communicate in time under the leadership of the leaders, the work next year will certainly progress more smoothly.

Secondly, the responsibilities between departments must be clear, and the responsibilities should be implemented to people. As an employee, I must perform my duties actively, seriously and efficiently, complete the tasks assigned by the leaders with good quality and quantity, communicate with the leaders in time when there are problems, and improve the ability to solve problems. Do what you can do today and try your best to assist leaders and colleagues in various departments to do a comprehensive job.

Finally, work should be planned. If you plan ahead, you will be established. If you don't plan ahead, you will be ruined. Because without a plan, you will have no direction. Without a direction, you will be in a mess and accomplish nothing. In the work, we should combine the situation of each department to make clear which ones are closely related to other departments and which ones are relatively independent; Nothing urgent or slow down will affect the progress of the whole project. Make an overall plan for the work, and a good plan is the beginning of success.

These are some insights from my work for half a year. Although I have been exposed to many new things in the past six months, I have learned a lot of new knowledge and experience, and I have improved my ideological understanding and working ability to some extent, but I know that as a newcomer in the workplace, I still have many shortcomings and deficiencies. In my future work, I will be more strict with myself, study with an open mind, work hard and strive for greater progress.

Finally, once again, I sincerely thank the company leaders for their concern and love, and wish all leading colleagues good health, successful career and all the best. At the same time, I wish xxxx a better tomorrow!

Chapter III: Summary of HVAC professional and technical work

Since I graduated from xx in June, 20 14, I have not only deepened my understanding of HVAC professional knowledge, but also got a further understanding of the knowledge that I didn't touch or didn't touch deeply in previous books. With the careful training and guidance of the unit leaders and the careful help of my colleagues, I have made great progress and gained a lot in my thoughts, study and work. In the past three years, under the training of various positions in HVAC field and engineering projects, plus my own continuous learning, I have grown into a technician with strong professional skills, which will be the most valuable asset in my life.

I have been working on projects, and I am responsible for the business and technical work of the company and the project. 2065438+In June 2004, the company was sent to work in the xx Project Department as a HVAC technician. In Mianyang xx project, I have different degrees of contact with electrical specialty, water supply and drainage specialty and HVAC specialty, and can fully combine theoretical knowledge with practical operation, greatly improving my knowledge of hydropower construction. Central air conditioning is a huge system engineering from maintenance, debugging, operation to design. Since my work, I have been exposed to many technical problems related to it. Whenever I encounter problems, I am used to studying through my own thinking, consulting relevant materials, or humbly asking experienced engineers at the scene until the problems are solved and taking notes. I think only hard work can bring gains, and attitude determines everything. I am still in the primary stage of technology, and persisting in learning is the most important part of my work. Now I have gradually adapted to the current work rhythm and have certain work skills, but there are still many shortcomings, and I will continue to improve my professional level in the future. My next goal is to be an intermediate engineer.

Working at the grassroots level has made me understand the connotation of "many a mickle makes a mickle", which is a process of accumulation, precipitation and self-improvement.