1, the first article of the contract is the general situation of the project, and the first article is the location of the project. Please fill in the details; Secondly, there are three ways to contract the project, namely, Party B contracts the work and all materials; Party B contracts labor services and some materials, and Party A provides some materials; It is entirely up to Party A to decide how Party B contracts and how Party A contracts all materials. Secondly, the duration of the project, and finally, the total contract cost is clearly written.

2. Article 2 of the contract stipulates that if the project is supervised, Party A shall sign a project supervision contract with the supervision company separately, and notify Party B of the name, unit, contact information and responsibilities of the supervision engineer.

3. Article 3 of the contract is the construction drawings.

4. Article 4 of the contract stipulates Party A's work, that is, your site must meet the construction conditions.

5. What Party B should do as stipulated in Article 5 is to avoid rough decoration.

6. Article 6 deals with engineering changes.

7. Article 7 of the contract is the supply of materials. 1. The materials provided by Party A according to the contract shall be notified to Party B before they arrive at the construction site, and both parties shall accept and handle the handover procedures; Second, before the materials provided by Party B according to the contract arrive at the construction site, they shall notify Party A for joint acceptance.

8. Article 8 of the contract stipulates the solution to the delay in the construction period.

9. Article 9 of this contract refers to the * * * decoration engineering quality acceptance regulations, that is, the agreement of both parties on the construction quality of this project.

10, Article 10 of the contract states that both parties agree to check and accept the project quality in several stages during the construction process. The qualified form is: the first stage is the acceptance of the main materials when they enter the site; The second stage is the acceptance after concealed works; The third stage is the completion of the project, signed by qualified users, and after settlement, they can enter the warranty and go to the site for acceptance. Party B shall notify Party A to participate in the acceptance two days in advance, and fill in the project acceptance form after the stage acceptance.

1 1. Article 1 1 of the contract mentions several payment methods for the project.

12, Article 12 of the contract is the liability for breach of contract, which stipulates that any party to the contract shall be liable for fines or economic losses caused to the other party due to non-performance of the contract or violation of national laws, regulations and relevant policies, and compensate the other party for economic losses. Be sure to fill it out carefully. If something goes wrong, its agreement will compensate you for the loss.

13. Article 13 of the contract is the way to solve contract disputes.

14, Article 14 of the contract is a few specific terms, involving the garbage cleaning fee, the storage and replacement of keys during the construction period and after the completion and acceptance of the project, the working hours of Party B every day during the construction period, and so on.

15. Article 15 of this contract is a supplementary clause, which stipulates that this contract shall come into effect only after being signed (sealed) by both parties; After the signing of this contract, the project shall not be subcontracted; If Party A and Party B sign this contract directly, the contract shall be made in duplicate, with each party holding one copy.

16, other agreed terms. Both sides should fill in the details of protecting their own interests as much as possible, so as to bind both sides, avoid many disputes and solve them easily after they happen. In addition, if the agreed terms are recognized by both parties, the market will also affix a special seal for contract certification, which means that the market recognizes the agreed terms signed by both parties.