Installation technology of movable partition track in hotel?
In the installation of movable partition rails in many hotels, some unprofessional people caused various uneven installation methods, which eventually led to horizontal errors, which led to various bad situations in the push-pull process of movable partitions, especially when the change wheel of the movable screen in the hotel Chinese restaurant was stuck, which would wear or even damage the change wheel for a long time. Everything has a scientific method. Based on years of installation and production practice, the hotel mobile partition has accumulated a set of its own track installation methods, which greatly reduces the above problems and increases the service life of the partition. The following is about the track installation technology of hotel mobile partition:
1, orbital integral phase chain method:
When installing the guide rail, please follow the high edge point. The installed track will be easier, more convenient and more flexible to use, and the sliding life of the change wheel will be improved. If the track is not equipped with high edge points, the effect will be the opposite.
Zhong Da consulting industry dynamic column answers all the questions you don't understand. Welcome to click to view.
2, the door phase chain method:
When installing the movable partition track of the hotel, it is most important to install that part first. Everyone knows that it is easiest and most convenient to start with simplicity, but the screen rail is not started from the easiest and simplest place, but is hoisted from the most difficult and difficult installation position. When installing, install the plate door first, and then install the whole track. Please pay attention to the following points when installing the panel door.
1), the size between the two wheel tracks should be the same, and if a big head and a small tail are installed, the screen door will be pushed out of position;
2) The high side of the track should be on the same side, otherwise, the change wheel will get stuck, making it difficult to push and pull the screen;
3) When installing the track, first arrange the connection position of the panel door (T-shaped port, L-shaped port and cross-shaped port), and then drop the track, connect and punch the good high edge points;
3. Connection mode of T-shaped port, L-shaped port and cross-shaped port of track:
When installing the movable partition rail in the hotel, we should pay attention to the connection of each port, so as not to disturb its order. For example, T-port can be divided into left T-port and right T-port, and divided into left and right ports, which is convenient for installation.
For more information about project/service/procurement bidding, and to improve the winning rate, please click on the bottom of official website Customer Service for free consultation:/#/? source=bdzd
- Related articles
- Pudding Hotel stipulates that each room is limited to two adults. How many people are there? How does it know? What if one more person lives?
- Hellenistic Mediterranean wine culture
- What's the use of credit card hotel courtesy
- How about Hangzhou tuzong new energy automobile co., ltd?
- Route from Wuhu Railway Station to Ge You Express Hotel Apartment
- When did Leslie Cheung leave? Who is Mr. Tang Hede Tang, a gay partner?
- How far is Dalian Green Light Hotel from Xinghai Square? How to get there?
- What are the techniques for baking pumpkin with egg yolk?
- How to take a bus from Xinpu to New International Trade Center on Zhuhai Road in Zunyi?
- Where is the address of Xichang Mingren Hotel?