Ask for a model contract for hotel decoration design and construction?

Party A: Address: Person in Charge:

Person in charge of Party B: ID number:

According to the contract law of * * * * * and the principles of "Regulations on Contract of Construction and Installation Projects", Party A entrusts the interior decoration project from the fourth floor to the eleventh floor of Sunflower Hotel to Party B, with Mr. Tan as the construction team leader and organizing a professional team to carry out the construction. Through consultation, both parties have reached the following contract for mutual compliance.

1. Project name: interior decoration project of the fourth floor of the hotel/1.

Second, the project site selection:

III. Construction Scope and Work Content 1, Construction Scope: 4th to 11th floors indoor; 2. Construction content: indoor smallpox, wall patching and wallpaper pasting.

Four. Building materials: 1. Party B is responsible for purchasing all auxiliary materials (internal and external putty powder, screws, sand, cement, antirust paint, etc.). ) is a project; 2. Party A is responsible for purchasing the main materials (wallpaper, wallpaper adhesive, varnish, thinner and latex paint) needed for decoration.

Verb (abbreviation of verb) construction technology: wall part

1. Remove all the damaged parts of the original wall to the bottom of the brick (mainly under the windowsill, the wall around the window and the back wall of the bathroom). 2. If water seepage is found on site, the waterproof coating should be washed first (waterproof material is provided by the hotel). 3. Batch bottom putty ash: firstly, the bottom layer is leveled with the old wall with putty powder from the outer wall, and the last layer is leveled with putty ash from the inner wall. 4. Polishing and leveling: After polishing, the uneven places should be leveled in time, and the quality should be implemented according to the quality requirements. 5. Apply varnish primer: Primer can only be applied after the wall is dry. 6. Wallpaper pasting: Japanese glue is evenly mixed in proportion and coated on the bottom of the wallpaper, and then the wallpaper is tiled and pasted on the wall, which requires seamless splicing and no bubble phenomenon. Construction technology: suspended ceiling 1. Remove the screws with nail holes on the original ceiling and replace them with new screws in appropriate positions. 2. The added screw head shall be washed evenly with antirust paint without leakage. 3. Fill the nail hole with putty ash at the place where the nail mouth is removed until it is flat. 4. After polishing and leveling, wash all ceiling surfaces with Japanese interior wall paint.

The quality standard of intransitive verbs 1. Party B shall carry out the construction according to the construction technology determined by both parties through consultation, and ensure that the completion acceptance reaches the relevant national acceptance grade standards; 2. The materials used by Party B must meet the environmental protection standards of the same family, and shall not be shoddy; 3, the ceiling surface must be smooth, beautiful and neat appearance, can't appear obvious uneven color difference and cracks, the shape is consistent with the original state; 4, paste the wallpaper must be smooth and firm, there is no obvious gap between wallpaper joints; 5. The engineering department of Party A is responsible for the construction supervision, and has the right to require Party B to rework the quality problems in the construction. If quality problems lead to rework, Party A will no longer pay the expenses required for rework.

Seven. Construction period: from 20th14th to 20th14th, the total construction period is days, and it will be completed on time. If the construction period is delayed due to Party B's unreasonable progress, Party A has the right to deduct the delayed payment of not less than 2‰ of the total project cost every day.

Eight. Payment method: 1. The total project cost (including tax) is RMB two hundred and twenty thousand Yuan only (¥ 220,000.00); 2. After Party B enters the site for construction, Party A shall, according to the project progress, take the project completion progress (the first floor is completed) as a payment cycle, and after passing the acceptance by Party A, pay the project payment to Party B in batches, with the payment amount of 22,000.00 yuan per cycle,1-7; 3. When paying the balance of the last cycle, the project provided by Party B is completely effective. After all the projects are accepted, the balance paid by Party A after deducting the contract quality deposit is 55,000.00 yuan. 4. 5% of the total project contract amount is the quality deposit, that is, RMB eleven thousand Yuan only (¥ 1 1 000.00). During the warranty period, Party B shall fulfill the obligation of engineering quality maintenance. After the expiration of the warranty fund (after all the projects are accepted 1 year), if no quality problems are found, Party A will pay 5% of the warranty fund to Party B as scheduled. In case of engineering quality problems during the warranty period, Party B shall unconditionally repair them. If it is not repaired in time or not, the expenses incurred by Party A after repair will be deducted from the warranty fund.

Nine. Responsibility of Party A: 1. Provide construction and material stacking sites, and handle entry negotiations; 2. Arrange the disassembly and assembly of furniture on site, and assist in disassembly and assembly; 3. Assist Party B to arrange furniture arrangement.

X. Party B's responsibilities 1. Party A will provide Party B with 6 rooms for construction, and this room (6 rooms) is a model room for acceptance. If the acceptance is unqualified or the construction is not carried out as required, Party A has the right to require Party B to rework; If the rework still fails to meet the acceptance criteria, Party A has the right to terminate the rework;

2. Deliver the finished floor to Party A as scheduled, and ensure that the quality meets the requirements of relevant national laws and regulations and meets the construction and use requirements of Party A;

3. The auxiliary materials for this project are provided by Party B, and can be purchased and brought into the site only after Party A confirms and agrees;

4, quality and safety management, standardize the construction, complete the project on schedule;

5. Carry out construction according to Party A's construction requirements;

6. The project construction progress is planned by Party A, and the furniture is maintained.

XI。 If Party B delays the construction period or Party A delays payment and other unilateral reasons, the other party to the contract may require the other party to pay a penalty of 3‰ per day.

Twelve. See the attached table for specific construction projects and requirements.

XIII. In case of any dispute during the execution of the contract, both parties shall settle it through friendly negotiation. If negotiation fails, it may be submitted to a local arbitration institution for arbitration.

Fourteen This contract is made in duplicate, one for each party.

Representative of Party A: Representative of Party B:

Seal of Party A: Seal of Party B:

Tel: Tel:

Date: Year Month Day Date: Year Month Day