Traditional Culture Encyclopedia - Hotel franchise - What are the hotel decoration construction processes?
What are the hotel decoration construction processes?
Decoration construction process
1. Early design? -? 2. Main demolition? -? 3. Hydropower transformation? -? 4. Woodworking? -? 5. Tiles? -? 6. Paint the walls? -? 7. Kitchen and bathroom ceiling? -? 8. Cabinet installation? -? 9. Wooden door installation? -? 10. Floor installation? -? 1 1. wallpaper? -? 12. radiator installation? -? 13. switch socket installation? -? 14. Lighting installation? -? 15. Installation of hardware and sanitary ware? -? -? 16. Installation of curtain rod? -? 17. Pioneer cleaning? -? 18. does the furniture enter the site? -? 19. Electrical installation? -20. Home accessories
The following small series focuses on the six stages that need attention:
Note 1: The main body cannot be demolished and rebuilt to the load-bearing wall. A load-bearing wall is like a human skeleton. If it's illegal, and it hits the load-bearing wall, the house may collapse, affecting the safety of residents.
Note 2: attention should be paid to reserved points in hydropower transformation.
1, to see whether the position of the lampblack machine socket affects the installation of lampblack machine in the future;
2. See if the location of the water meter is appropriate;
3. See if the location of the water inlet is convenient for installing the sink in the future.
Note 3: If the decorative part is involved in the woodworking stage, the veneer should be laid at a 45-degree angle, and the fine requirement for angle closing is to leave no trace. These construction details require the carpenter's high skill and patience.
Note 4: The installation of the doorsill and marble windowsill can be completed by the way in the bricklaying stage.
Note 5: For the kitchen and bathroom ceiling project, material selection is the first step of the project, which will determine the quality of the ceiling in the future. Generally, durable aluminum gusset plates will be selected.
Note 6: The following issues should be paid attention to in floor installation:
1. Before the floor is installed, it is best to let the manufacturer come to the door to investigate whether the ground needs leveling or partial leveling. Some decoration companies or teams will advise students to level the ground or partially level it, subject to the actual investigation of the floor manufacturer;
2. Before the floor is installed, the floor paved at home should be cleaned to ensure the floor is dry, so do not use water during the cleaning process.
3. When installing the floor, if possible, the floor must be cut in the corridor.
In the whole decoration process, the most important thing is the construction part. We take the construction process of canoe decoration as an example. Let's take a look at the renovation projects first, and what is the order.
First of all, the bricklayer should handle the grass-roots level, clean up the top surface, wall surface and ground to meet the requirements of decoration and construction, and at the same time carry out the renovation and installation of water and electricity lines. The hydropower project is moving forward because the hydropower line reconstruction needs to be slotted and the pipeline will be placed inside. Because the pipeline will be sealed in the wall or underground, the quality of the pipeline is very important. In order to strictly control the construction quality, all the canoe decoration construction sites will be uniformly distributed by the material distribution center.
After the grass-roots treatment reaches the standard, carpenters can start ceiling work after hydropower transformation. It is important to consider the height of the ceiling and not let the whole space feel depressed. Then you can start joinery construction, such as wood heating covers, door and window covers, cabinets and so on. The quality inspector of canoe decoration specially reminds decoration consumers that the moisture content of materials is very important for joinery products. Generally speaking, the moisture content is less than 1 1.8%. If the wood is too wet or too dry, it is likely to deform later.
After the joinery decoration structure is completed, the top coat should be brushed again for protection. At this time, the decoration of the wall and top surface will begin. Paint or stick wallpaper on the wall cloth. It should be noted that electrical installation holes and lines should be reserved when decorating the wall.
When painting the finish of joinery decoration, it should be noted that the paint construction must ensure a dust-free environment, so that the surface of the finally decorated wood products can be smooth and delicate. The ground decoration shall be carried out after the wall construction is completed. First lay the floor, stone or ceramic floor tiles, install the skirting board, and then carry out the floor decoration and maintenance. At this time, the renovation project has basically ended, and the installation of cabinets, lamps, various supporting electrical appliances and facilities is completed, so the project is truly over.
This is a relatively strict decoration construction sequence, but when you really decorate, you can master some things flexibly, such as the bathroom wall and floor, and you can start first. In fact, as long as there is a responsible quality inspector and a good supervisor, you can relax. For example, canoe decoration will implement third-party supervision standards, and there will be senior management inspections every Friday to reassure everyone.
What are the decoration construction processes? There will be many processes in decoration construction. According to different specific construction projects and designs, the construction technology and projects will be different, but generally they will be similar. I suggest that if you are in a hurry when decorating, you can communicate with the decoration construction team and ask them about the progress of the decoration regularly, so that you can clearly grasp the progress of the decoration and avoid confusion when decorating. The specific reasons are unclear for a long time.
- Previous article:Can the hotel lost property be recovered?
- Next article:Which seafood is delicious in Yongchuan?
- Related articles
- How far is it from Shilihe River at Hefei 135 Road Bottom Station to Chengjing Hotel?
- How can the hotel re-manage efficiently from the chaotic or unmanned state, so that the old employees can adapt as soon as possible?
- Is it expensive to book a hotel for 300 nights?
- How far is Xiangyang Xiangzhou Celebrity Hotel from the railway station?
- How about Hefei Baohe District Branch of Fashion Tourism Hotel Management Co., Ltd.
- The original text of Xiehuan Yuangong's epitaph
- Five high-end communities in Ganzhou
- How about the door lock of Yumin Hotel?
- What airports are there in Canada?
- Hotel accommodation cannot be refunded after 12. Can I call the police?