Seven Work Plans of Engineering Department
Work plan of engineering department 1
First, the overall thinking of the work
According to the current progress of the project, the Engineering Department will gradually plan the specific work ideas for the next year while actively and steadily completing the finishing work of the existing project, as follows:
? Two structures? Refers to the team building, combat effectiveness and cohesion of the engineering department; Construction project management system and project management system. Engineering construction? Three goals? It means that the project schedule goal, quality goal and cost goal should be reasonably balanced, coordinated and unified, so as to promote the completion of the comprehensive goal of the project.
Second, the project management indicators
1. The indoor lighting renovation project of Lebin Department Store was completed.
The floodlight project on the eaves of New World Plaza was completed.
C, the engineering qualification rate reached 100%.
D, zero major safety accidents on the construction site
Three. working face
(1) Construction and its scale
In 20XX, with the support of the company and relevant departments, the engineering department started the indoor lighting renovation of Lebin Department Store and the floodlighting project of the outer eaves of New World Plaza according to the scheduled commencement date of the company.
(2) Quality control objectives
Excellent projects reached 80%, and qualified projects reached 100%. All the master control projects are qualified, and the general projects have been accepted.
(3) schedule management objectives
Complete the annual plan target issued by the company and realize the schedule management contract target.
(D) Cost control objectives
Complete all kinds of cost control targets issued by the company, and complete cost control contract targets and schedule control targets. (5) Safety etiquette measures
Safety courtesy measures mainly come from the following two aspects;
1) qualification certificate management
First, the business cooperation unit safety production qualification examination and filing management
B, construction machinery testing for the record.
C, special operations personnel certificate review for the record
D, professional technology, professional management security personnel qualification examination for the record.
2) Main construction scheme and system management.
A, the construction site layout review
B, civilized construction management measures implementation
C, warehouse management scheme, scaffolding scheme, construction temporary electricity scheme, construction machinery erection scheme, aerial work control scheme, construction survey control scheme, etc.
D, workers living environment management system
E, site construction environment management system
F, safety and civilized construction inspection appraisal and reward and punishment system
(VI) Internal construction of departments
1, team building:
Focusing on next year's work objectives, the team building of engineers in the department is particularly important. Engineering department to improve this department? Team cohesion? And then what? Team fighting capacity? As a basis, encourage employees to participate in the activities organized by the company, participate in the construction of corporate culture of the company, and strive to promote the coordination among employees and the team building of the company; Fully stimulate the work enthusiasm of employees and improve the overall combat effectiveness of employees.
2. The institutional system construction of the institutional system engineering department is mainly reflected in the following aspects;
A, improve the internal rules and regulations of the engineering department;
B, clear the division of responsibilities within the engineering department;
C, constitute the internal work and business process contact with other departments;
D, with the management rules and regulations of engineering business cooperation units;
Fourth, pay attention to the problem.
(A) a clear mode of construction
While the company's construction mode is gradually clear, the engineering department will quickly sort out the ideas according to the company's construction mode and complete the docking with the company's model at the first time.
(2) Reasonable planning of contracts and contracting methods
According to the characteristics of the project, plan and determine the contract and contracting method suitable for our company's project characteristics. After reasonable planning and mode determination, the profit of the project is maximized.
(III) Establish and improve the project management mode suitable for the Company.
According to the company's project management model, the engineering department will improve various rules and regulations based on this model to form a complete and feasible management plan.
Verb (abbreviation of verb) expects support and help.
In terms of human resources and team building, we hope to get strong support from the company. In addition, the project construction mode will be determined as soon as possible.
Work plan of the second part of the project
I. Work Objectives of Engineering Department in 20XX
1. Ensure the normal operation of the equipment in the process of continuous inspection and maintenance.
2. Follow up the engineering problems left by 20XX, and put forward effective rectification measures.
3. Intervene in the first-phase high-rise and second-phase villa projects, especially strengthen the investigation and preliminary inspection of the first-phase high-rise concealed works.
4, do a good job in high-level reception, ensure that each employee can independently check and accept, take the owner to inspect the house separately, and inform the building structure and hidden water pipes and circuits in detail.
5. Conduct training in strict accordance with the annual training plan, especially the induction training for new employees.
6.20XX July 3 1 day, complete the first phase of high-level project acceptance and key data reception.
7. Complete the first-phase project of high-rise equipment to ensure daily normal use and maintenance.
8, make facilities and equipment maintenance plan, in strict accordance with the plan.
9, to do a good job of secondary decoration data review and inspection, to ensure the safety of decoration construction.
10, do a good job in selecting and signing the maintenance unit of outsourced facilities and equipment.
1 1. Organize all housing information and establish files.
12, cooperate with the work of the marketing department and various departments.
13. Follow up the construction of the missing project in the first phase of villa greening last year.
15. Follow up the installation of high-rise fence and monitoring system in the first stage.
16, check and follow up the division of the first-phase high-rise underground parking lot and the installation of the guide plate.
16, do a good job in the rectification of engineering defects of high-rise buildings and villas in the subsequent phase.
17, provide paid and non-permanent services for operators' engineering maintenance, and ensure that the engineering repair rate is not higher than 2%. 18. Follow up the installation and use of the toll gate system of the first-phase villa and the first-phase high-rise and underground parking lot.
19, establish equipment files and do a good job of equipment data archiving.
Second, the engineering difficulties and solutions
1. After visiting various projects in nearby communities, I found that the salaries of engineers in our company are low, and I hope to get the support of senior leaders to improve the quality of life of engineers in our company.
2. I hope that the related information and keys of the first phase villa left by 20XX can be handed over to my property management company as soon as possible, so that our work can be carried out better.
3. Part of the underground garage of the first-phase villa is not threaded, so it can't be electrified, which seriously affects the use of the garage of industrial households. Ask the group to coordinate with relevant departments to solve the problem.
4. During the inspection, it was found that the clubhouse and driving range were not reserved for maintenance, so some maintenance in our department could not be carried out. Please ask the relevant construction unit to solve it.
5. In order to reduce the potential safety hazard of the first-phase villa, it is hoped that the group leaders will negotiate and install the monitoring system as soon as possible.
6. At present, the wall of the first-phase villa is made of colored steel plate and wrought iron, and the colored steel plate is easy to deform, which affects the company's project image.
7. At present, the C2 garage of Phase I villa has rough ground. In order to improve the engineering quality, our company plans to use floor paint for laying.
8. The roof gutter (eaves gutter) of the first phase villa suffered from serious water leakage after repeated maintenance. We hope to get the support of the team leader and solve it thoroughly to avoid damaging the wall because of its water leakage.
9. The intelligent card swiping system was not installed in C2 garage of Phase I villa, which brought difficulties to our vehicle management. We look forward to the support of the group leaders.
10, the window sash installed by the residents of the first phase villa is too large, which seriously affects the use of the residents. I hope that the leaders of the group will negotiate and handle it.
1 1, the courtyard door of the first phase villa is difficult to push and pull, and it is easy to disassemble, which seriously affects the use of the owner and the quality of the project. I hope that the leaders of the group will negotiate and handle it.
12, the septic tank of the first phase villa adopts the confluence of rain and sewage, and the main pipe is not connected with the municipal pipe network, which leads to the acceleration of septic tank filling. It is expected that the group leaders will negotiate and deal with it.
13. Up to now, the access control intercom system has not been installed, which seriously affects the use of business households.
15. Up to now, the developer has not asked my property company to participate in the inspection and acceptance of all the facilities and equipment of the first-phase villa, so that it can directly take over the management.
Work plan of the third project
There is a problem:
1, the implementation of the departmental system needs to be strengthened, and a series of measures formulated are often not well implemented, and the assessment efforts are not strengthened and reflected.
2. Because the communication between departments is not enough, the connection work is not done well.
3. Communication between departments needs to be strengthened, and cooperation between departments needs to be further strengthened.
4. The improvement of production technology was not strengthened to improve production efficiency and quality.
Xxx work plan
1, strengthen system construction, resolutely implement the target responsibility system, and refine post responsibilities. Management must be institutionalized, standardized and programmed, and any violation of discipline and discipline should be dealt with seriously according to the system, so that every employee has a sense of responsibility.
2. Strengthen communication from top to bottom, collect problems, find problems and solve them. Bring the company together. Qi Xin Qi Xin made concerted efforts to do a good job in all aspects.
3. Accelerate the optimization and improvement of production technology, and the number of process improvements per month is 13, so as to increase production efficiency and improve quality.
4. Strengthen all products of the company and reduce production costs, with a target amount of 500,000 yuan.
5. The accuracy of the main materials in the parts list issued by the factory reaches 100%. 98.5% of other list materials (without affecting production)
6. Strengthen the skill training of the model division and improve the qualified rate of customer models, with the goal of 98% satisfaction and 99%.
2xxx year is a year in which challenges and opportunities coexist for Southeast Company, as long as we unite and establish a high sense of urgency and responsibility. Work in a down-to-earth manner according to the work plan With the strong support and guidance of the company, I believe that next year, we will definitely overcome many difficulties, strive for progress steadily, reverse the current unfavorable situation, and finally realize the profitability of Southeast Company and move towards a benign development path.
Work plan of the fourth project
I. Safety management
1, safety management of equipment and facilities must be adhered to? Safety first, prevention first? Policy; We must adhere to the systematic management mode of equipment maintenance process; We must persist in constant renewal and change; Improving the new level of safety technology can effectively and timely eliminate unsafe factors in the process of equipment operation and ensure zero major accidents. 2, clear the responsibility for safe operation, constitute a perfect safety maintenance management system. 3. Strictly implement the operation safety regulations and realize the standardization and institutionalization of safety management. 4. Strengthen the safety supervision of external decoration companies and strictly enforce the safety access conditions of decoration units.
Second, the work plan
1, strengthen the service consciousness of the maintenance department. At present, in terms of service, the engineering department needs to further improve the service level. What is abnormal is the way and quality, which needs further improvement. Our department will regularly carry out customer, courtesy and multi-functional technical training to improve the service quality and efficiency of our employees.
2, improve the system, clear responsibilities, to ensure the benign operation of the department. In order to give full play to the role of engineering department as a good communication and caring link between property and owners, we should improve and perfect the working system according to the service form to make it more suitable for the current work; From the system of equipment management and personnel arrangement, the work is truly rule-based and standardized. Through the implementation of the system, clear responsibilities, to ensure the sound development of departmental work.
3. Strengthen equipment supervision and cost awareness. The engineering department is responsible for the maintenance and management of all residential facilities and equipment, which is directly related to the control of property fees. Familiar with the operation and performance of the equipment, ensure the normal operation of the equipment, operate the gravity area under real supervision according to the specifications, and the engineering department will implement it according to the needs of related work to ensure the equipment, maintenance and effectiveness; And plan the maintenance of facilities and equipment to specific individuals.
4, to carry out training, strengthen learning, improve the skill level. At present, the service scope of the engineering department is still relatively limited, and the abnormality is limited to the structure of its own knowledge. In order to further improve their work skills, it is necessary to properly carry out theoretical study, learn from each other's strengths and improve the service level of the whole team.
5, according to the characteristics of facilities and equipment maintenance, formulate the corresponding maintenance plan, workflow points.
Third, do a good job in energy control.
The cost of managing energy consumption usually accounts for a large proportion of the daily cost of a property company, and energy saving and consumption reduction is an effective means to improve the efficiency of the company. The key to energy management is:
1, improve the energy-saving awareness of all staff.
2. Formulate necessary rules and regulations.
3. Take necessary technical measures, such as separating the office electricity from the gate electricity, transforming the lighting facilities and equipment of the underground parking lot in addition to the original street lamps and elevators (with different charging standards) to minimize the energy consumption of the parking lot; Transform the lights in the corridor into energy-saving lamps; The lighting control switch in the corridor is transformed into a touch delay switch.
4. Conduct internal evaluation and control of equipment operation and maintenance costs to avoid and reduce unnecessary waste.
5. Purchase equipment and accessories directly from the manufacturer, purchase spare parts in a unified way, and carry out maintenance according to the equipment maintenance cycle. So as to replace the equipment in time, ensure the best energy-saving effect of the equipment and reduce the maintenance cost.
Fourth, preventive maintenance.
1. Preventive maintenance: All facilities and equipment shall have a maintenance and overhaul plan, and preventive maintenance shall be carried out according to the time, items and processes set in the equipment maintenance cycle.
2. Daily maintenance report processing: take maintenance measures in the form of maintenance report for the faults found in the daily use of facilities and equipment. (Work Plan for Building a Clean and Honest Party Style)
3. Daily inspection: The personnel on duty in the engineering department shall conduct 1-2 inspections on the equipment and facilities within their responsibilities when on duty, and handle the faults and anomalies in time.
Five, improve the equipment and facilities files, make maintenance inspection records.
In order to ensure the integrity and continuity of the equipment and the implementation of the original data, we will further improve the departmental file management and establish the equipment ledger on the existing basis. For the newly taken over Venice Community, due to the lagging installation of supporting facilities of real estate companies, it is necessary to collect and follow up the facilities and equipment information.
VI. Maintenance of facilities and equipment:
1, strictly implement the system of regular patrol inspection, handle problems in time when found, and patrol at least 1 time every day.
2. Arrange regular inspection according to different seasons. If the anomaly is in flood season, strengthen patrol inspection to ensure safety.
3. According to the actual needs, derusting and painting the wrought iron guardrails, iron gates and lamp posts in each community.
4. According to the actual needs, transform the roads, flower beds and walls of each community. Through the above work, our engineering department will show our company's service image, provide better and more thoughtful services for the owners, and create better conditions for the future development of our property management company.
Work plan of Engineering Department 5
First, the overall work of the engineering department this year
The engineering department should ensure the normal operation of the hotel's electric power, further strengthen the maintenance and operation management of the equipment, strengthen the planned maintenance and inspection of the equipment, and ensure the normal operation of the heat pump, elevator, power distribution, central air conditioning, water supply system and kitchen facilities. , and in the case of abnormal, improve the intact rate and comfort of rooms, restaurants and entertainment facilities. Further strengthen energy management, strengthen cost awareness, improve the management of materials and spare parts of facilities, and vigorously do a good job in tapping the potential, repairing the old and utilizing the waste.
Strengthen personnel training, service awareness training, service skills training, strive for multi-functional personnel, make full use of human resources, control the total number of personnel, implement the last elimination, improve services, enhance the background image, and promote the quality of work to a higher level.
Second, the engineering department focuses on the following work
1, pay close attention to the training and assessment of engineering staff, start with manners, gfd, service consciousness, service process and service quality, improve work skills, improve work efficiency, improve work image, achieve multi-function at one post, and train and recruit comprehensive technical personnel, such as electricians, from high-voltage maintenance to power distribution and elevators. Implement the examination of survival of the fittest and skill competition for technical personnel in the engineering department. Retain outstanding backbone employees, inject new vitality into some old employees, avoid a stagnant pool of personnel appointments, and introduce competition and elimination mechanisms. As the saying goes, a family is not an ant, and running water is not rotten. Only by retaining capable and diligent people and eliminating lazy and mediocre people can the whole group be competitive and energetic at any time. It is expected that the logistics staff of the engineering department will create a comfortable hardware environment with full enthusiasm after training and assessment, provide comfortable service products for guests, completely change the image of guerrillas, fire brigades and oil soldiers, and make the backstage service full of rich hotel atmosphere.
2. Improve work service procedures, strengthen initiative and coordination, and coordinate the timeliness and effectiveness of work between departments, between front and back offices, between teams and groups, and between superiors and subordinates, and do more work without shirking. Each team should strengthen the daily inspection of facilities, patrol according to the standard route, divide the area of responsibility, and blame the people. And the maintenance team regularly tells front-line users about the use of maintenance knowledge to prevent barbaric operations.
Work plan of engineering department 6
First, the objectives of this year's investment promotion work are:
1, improve the overall business level.
2. Learn more, communicate more, and discuss relevant investment promotion knowledge and departmental work.
3. Communicate with people in the same industry and explore innovative investment knowledge.
4. Understand relevant information, communicate with leaders and other departments in time, discuss together, and further improve the actual work of this department.
5. Conduct a purposeful market survey on the decentralized businesses in Jining.
6. Develop a rent strategy.
7. In late February, the project was docked with the head of Dicos Jining, and in early March, the head of KFC, Dixintong and E was received to inspect the project.
8. Develop a new investment manual.
9. Strengthen the professional training of investment promotion experts.
10, the accurate data of the property situation contacted by the engineering department.
1 1. Cooperate with the sales department for mall marketing.
12. Continue to explore potential or intended customers.
Second, increase customer resources as much as possible.
1, sincerely and politely receive the intended customers.
2. Collect customer resources from rival shopping malls in other and surrounding cities.
3. Keep abreast of relevant trends in the industry through regular contact and interaction with customers.
Third, compile relevant investment information.
1, investment manual and investment manual
2. Entrust operation contract (agent management) and power of attorney
3. Power of Attorney for Investment Promotion
4. Investment flow chart
5. Copy of investment
Fourth, the way to attract investment.
1, project investment promotion meeting
2. Project promotion meeting
3, door-to-door visit (target self-recommendation)
4. Network investment
5. Telephone contact
Step 6 communicate face to face
7, industry associations, government agencies
8. Media investment
Fifth, improve the occupancy rate of shopping malls, stabilize the existing good brands in shopping malls, and introduce other high-end brands.
1, combined with the actual situation of the industry, learn more about and introduce the mainstream brands in the home market, try to stabilize the existing good brands in shopping malls, and at the same time form a stable development trend of dislocation management.
2. Communicate with leaders and relevant departments in time to ensure the correct work. In the year of 20XX, China Merchants will go all out and work hard, and strive to achieve a steady improvement and development of the occupancy rate of shopping malls in the competition.
Work plan of Project 7
A, engineering personnel
Supervisor:
Members:
Assistant:
Second, the main tasks and objectives of the engineering department in 20XX.
1. In view of many irregularities in supervision work, employees are trained in accordance with Model Bidding Document for Highway Engineering, Standard for Quality Inspection and Evaluation of Highway Engineering, Specification for Construction Supervision of Highway Engineering, Technical Specification for Construction of Highway Engineering, Test and Inspection Regulations for Highway Engineering, Technical Guidelines for Standardized Construction of Highway Engineering, etc.
2. According to the characteristics of the project in that year, each supervision institution should prepare a summary of technical or management experience for other supervision institutions to learn and communicate.
3. Each supervision unit shall summarize the test and inspection work every month and submit it to the engineering department of Company 7, which will inspect the summary and submit it to the company leaders, so that the leaders can clearly understand the completion of the engineering quality objectives of each supervision project.
4. Every month, the supervision organization will report the completion of the supervised project progress to the engineering department for summary, and the engineering department will conduct comprehensive analysis and summary, and report it to the leaders for reference, so as to facilitate leadership decision-making and macro management. 5. Systematically improve the database arrangement of the engineering department.
Third, the staff training plan
Before 1, 20xx65438+1October 10, each employee shall write down two (but not limited to) problems or deviations from the specifications in his work, analyze the adverse consequences, put forward improvement measures or suggestions, and report them to the engineering department mailbox.
2. The Engineering Department will classify and summarize the above problems, answer and summarize them according to the relevant contract terms, specifications, standards, procedures and guidelines, and then report them to the company leaders for review.
3. The above summary is reviewed by the leaders and distributed to all employees for study.
4.20XX before March 10, the regulatory agencies organized a closed-book exam on learning scenarios. 5.20XX March 3 1 days ago, the engineering department summarized the employee training scenarios and reported them to the company.
Four, supervision institutions management experience or technical exchange of relevant information
1, in terms of quality supervision, the responsibilities of chief supervision engineer (resident engineer), professional supervision engineer and supervisor.
2. In terms of schedule supervision, the format and information of overall schedule and monthly schedule.
3. In terms of cost supervision, how to be simple, efficient, accurate and timely.
4. What are the shortcomings of our company in safety supervision and how to solve them?
5, quality supervision, progress supervision, cost supervision, safety supervision, contract management and other work processes, to standardize, standardize and simplify.
6, subgrade and small bridges and culverts construction organization design key review data and matters needing attention, bridge construction organization design key review data and matters needing attention.
7, precast box girder prefabrication and installation construction technical guide.
8, all kinds of mixture ratio technical guide.
9, the main problems existing in the steel welding and acceptance, how to solve.
10, aiming at the construction risk management, what experience and summary does the supervision engineer have in organizational risk, economic and management risk, engineering environmental risk and technical risk?
1 1. In modern management, the application of system principle and people-oriented principle in supervision organization construction.
12. Other matters that can be summarized and communicated.
Verb (abbreviation of verb) Summary of test and detection work of supervision institutions
The supervision organization shall compile a summary of the test and inspection work every month and report it to the engineering department, bearing in mind that the system is comprehensive and should not stop at? Experiment? Let's go
Six, the project site completion schedule
The supervision institution shall report the completion of the monthly progress every month according to the data and requirements in Appendix 3 "Project Management Curve" of the model bidding document for highway engineering.
VII. Arrangement of Engineering Database
The engineering department first compiled the general catalogue of data sorting and distributed it to all employees. Employees collect relevant data according to the requirements of the corresponding catalogue according to the actual situation, report them to the engineering department, and the engineering department will summarize and sort them out.
- Previous article:Xinyang Oriental Venice
- Next article:What are the places in Pingdi?
- Related articles
- How many star hotels is Sanya No.9 Theme Apartment?
- Rizhao Shanhaitian New-Mart Business Hours
- Detailed room type and room price information of Jinzhou Building Hotel
- How about the tennis court in Star River Bay Hotel?
- Is the commercial housing and public rental housing in the Arc de Triomphe in Harbin separated?
- Single apartment price in Toronto, Canada
- Can you order the barrier-removing incense at will?
- Shanghai Caohejing Development Zone Huagang Industrial Co., Ltd. How about Renaissance Shanghai Caohejing Hotel?
- How about Anhui Jintai packaging co., ltd?
- Kobe came to China. Who received him?