Traditional Culture Encyclopedia - Hotel franchise - What details should be paid attention to when installing central air conditioning in hotels?
What details should be paid attention to when installing central air conditioning in hotels?
A, the central air conditioning engineering of internal and external wall drilling.
1, drilling can only be carried out with the consent of the property, so as not to damage the wall structure.
2. Punch holes in the interior wall and confirm the punching position. For example, when the room beams, pay attention to as close as possible to the middle side. Usually the reinforcement of the beam is on both sides.
3. Punch the external wall, confirm the punching position, and go to one side of the external wall to prevent rainwater from flowing backwards.
Second, the indoor unit of the central air conditioning project needs to be installed with dust prevention.
Three, the central air conditioning project indoor machine installation lamp trough.
Four, the hotel central air conditioning engineering outdoor installation distance from the wall
5. When the central air-conditioning project of the hotel is renovated, the outdoor unit needs to be equipped with damping pads for drainage.
Six, central air conditioning engineering indoor drainage
- Related articles
- How far is Xining Tianqiao Express Hotel# from the train station?
- Can I apply for a charging pile for a self-built house in Zhuhai?
- How to get to Xi 'erqi subway from Tianxinliang Hotel?
- How to get from Hangzhou East Railway Station to Donghe Times (Hangzhou Qiantang Riverview Hotel Apartment)
- Guangzhou Guangsha Hotel Supporting Transportation
- Is steamed rice more nutritious than boiled rice? What do you think is better for steamed rice?
- Review of the vicissitudes of the Quanzhou earthquake
- Ask the hotel waiter for an internship report of about 2000 words.
- The legend of heroes 3 introduction
- Kitchen staff self-report speech