Traditional Culture Encyclopedia - Hotel franchise - Tianjin Junchen Decoration Xi Anyima Commercial Exhibition Decoration Office Partition Matters needing attention

Tianjin Junchen Decoration Xi Anyima Commercial Exhibition Decoration Office Partition Matters needing attention

1, the upper and lower door shafts must be in a vertical line, the glass door must be framed by steel beams, and the upper shaft must be welded on the beam, because the upper door shaft is the support point of the whole glass door and must be firm. It is forbidden to use joinery keel structure on the upper beam, because the connection point between the upper shaft and the wood structure can only be fixed with self-tapping screws, which will easily cause the upper shaft to fall off for a long time and cause danger.

2. When the ground spring is embedded, a rectangular square pit should be chiseled on the original ground, and the surrounding area should be greater than 10 mm of the ground spring base, which is used to fill high-grade cement mortar and play a solid role. It is suggested that the ground spring cement should be cured for 48 hours according to the glass door, and the ground edge of the glass door should be 8- 12 mm away from the ground to prevent the ground from rubbing when the glass door sinks.

3. The upper and lower door shafts of the pop-up door should be located in the center of the door frame, so that the glass door can also be located in the center of the door frame after installation, which has a beautiful effect.

There is one more detail to pay attention to. Butter should be injected into the door shaft and door clamp to reduce the wear of the connector and prolong the service life.