Traditional Culture Encyclopedia - Hotel franchise - How to fill in the six-item mechanism hydropower station maintenance safety inspection record
How to fill in the six-item mechanism hydropower station maintenance safety inspection record
1. Project name: Fill in the project name of this safety inspection, such as "Safety Inspection of Maintenance of Hydropower Station Generator Units".
2. Inspection date: Fill in the specific date of this safety inspection.
3. Inspector: Fill in the name of the person participating in this safety inspection.
4. Inspection content: List in detail the various safety inspection contents during the maintenance of the generator set.
5. Inspection results: Record the problems found during the inspection, including description of the problem, cause of the problem, corrective measures, etc.
6. Inspection conclusion: Based on the inspection results, summarize the overall situation of this safety inspection and make suggestions for improvement.
- Related articles
- What are the honeymoon gifts in Maldives?
- Can the hotel transfer the call to a stranger?
- The location of Xinjiapo
- Huizhou specialty snacks can only be tasted by eating food.
- European buffet
- Shanghai Dehong Industrial Co., Ltd. Dehong Hotel Apartment Recruitment Information, what about Shanghai Dehong Industrial Co., Ltd. Dehong Hotel Apartment?
- How to get from Pan Pacific Hotel in Singapore to Sentosa Island
- How is the star rating of the hotel determined?
- What is the situation of Hangzhou Oriental Grand Hyatt Building?
- Kitchen utensils second-hand market recycling telephone