Simple contract of hotel maintenance outsourcing
Simple Contract for Hotel Maintenance Outsourcing 1 Party A:
Party B:
Based on the principle of good faith, Party A and Party B have decided to sign this contract through friendly negotiation.
Article 1 Scope of outsourced services
(1) Service location: the daily maintenance and related work of Party A's building and its affiliated buildings in Kunlong and all hydropower equipment and facilities, including the maintenance of security and fire fighting equipment and facilities.
(II) Service content: completing the relevant work of plumber's duties required by Party A, such as safety inspection of hydropower equipment and facilities; Maintenance of all kinds of electrical equipment (except air conditioning mainframe and computer hardware).
(3) Service period:
Article 2 Main Rights and Obligations of Party A
(1) Supervise and inspect Party B's related services according to work needs, enterprise rules and regulations and this clause.
(2) Party A shall cooperate with Party B during the construction period.
(three) in accordance with the relevant provisions, pay the contract fee.
Article 3 Main Rights and Obligations of Party B
Before formally providing services to Party A, you should be familiar with the basic situation of all hydropower equipment and facilities of Party A, including installation location, line layout, working principle and safe operation requirements. From the effective date, the main services provided include:
(1) Provide Party A with all-weather water and electricity response service. After receiving the notice that Party A's daily installation or other related matters require Party B's cooperation, Party B must arrive at the site within 1 hour or within the time specified by Party A. ..
(2) Check the fire-fighting and electrical circuits of Party A's office building, warehouse and its affiliated areas every week, and fill in corresponding records to find and eliminate hidden dangers. On this basis, evaluate the water and electricity consumption of Party A every month, and put forward reasonable rectification or energy saving suggestions and feasible schemes.
(III) Monthly on-site safety inspection: Cooperate with Party A's safety management personnel to conduct monthly electricity consumption and fire safety inspection before major festivals, put forward potential safety hazards from a professional perspective, and assist Party A in rectification. When Party A needs it, cooperate and assist the professional organization hired by Party A to test and maintain the safety equipment and facilities.
(4) Answer Party A's questions about equipment failure seriously and responsibly.
(5) Be responsible for checking the water and electricity meter of the house rented by Party A, and charge once a month.
(six) other work related to the use and safety of hydropower.
Party B must provide water and electricity qualification certificate and copy it to Party A for the record. During providing services to Party A, Party B shall abide by national laws, regulations and policies and Party A's occupational health and safety management regulations, and accept Party A's safety management, supervision and inspection.
The necessary tools carried by Party B shall be safe and available, and the expenses for tools and wear shall be borne by Party B..
Article 4 Party B shall pay attention to safety during construction, and Party B shall be responsible for the expenses and responsibilities of any safety accidents caused by Party B. ..
Article 5 In the daily maintenance and management, if the equipment, facilities and spare parts are damaged during the maintenance and repair process not due to Party B's intention or negligence, and the spare parts need to be replaced, the expenses shall be borne by Party A; However, if secondary damage is caused by Party B's construction, Party B shall replace it free of charge.
Party B shall assist Party A in purchasing and replacing hydropower equipment, facilities and spare parts thereof; When necessary, Party A may authorize Party B to purchase, and Party B shall provide a quotation of parts for Party A to participate in and confirm the purchase, and the price of parts in the quotation shall not be higher than the market price.
In the process of maintenance and construction, if Party B finds any quality problems or specification differences in the materials provided by Party A, it shall promptly raise them with Party A. If Party A still says that it will use them, Party A shall bear the losses caused thereby.
Article 6 Without Party A's consent, Party A shall not adjust or disassemble hardware equipment or change relevant settings without authorization. When Party A's equipment has serious faults and cannot be maintained on site, it must be taken back by Party B, and Party B needs Party A's consent. If the replacement of parts may affect the function and performance of office equipment, Party B shall negotiate with Party A for approval.
Article 7 expense settlement:
Party A shall pay the contracting fee of RMB Yuan only to Party B throughout the year, which shall be settled on a monthly basis.
Article 8 Liability for breach of contract:
If Party B fails to troubleshoot in time or fails to meet Party A's work requirements, which affects the normal development of Party A's work, Party A has the right to reduce the contract fees paid to Party B accordingly; If losses are caused to Party A, Party B shall be liable for compensation.
After taking effect, if either party fails to perform normally, it shall notify the other party in writing 1 month in advance and pay a penalty of 10% of the total price.
Article 8 During the contract period, if Party B does not have the qualification or ability of hydropower maintenance operation due to the invalidity of Party A's certificate or other reasons, Party A has the right to cancel its qualification or ability without taking any responsibility.
Article 9 Dispute settlement methods:
In case of any dispute arising from performance, both parties shall settle it through consultation; If negotiation fails, a lawsuit may be brought to the people's court.
Article 10 This contract is made in duplicate, with each party holding one copy. Matters not covered in this contract shall be settled by both parties through consultation on the principle of mutual benefit and understanding, and supplementary terms may be signed if necessary.
Article 11 Supplementary Provisions
(1) This agreement shall come into effect after being signed (sealed) by both parties.
(2) After signing this contract, the project shall not be subcontracted.
(3) This copy is made in duplicate, with each party holding one copy.
Party A (seal): Party B (signature):
Year, month, sun, moon, sun.
Simple Contract for Hotel Maintenance Outsourcing 2 Party A:
Party B:
Party B accepts the entrustment of Party A to provide maintenance services for Party A's hotel equipment. In order to protect the legitimate rights and interests of both parties, Party A and Party B entered into this agreement through friendly negotiation in accordance with the Contract Law of People's Republic of China (PRC). Before signing the agreement for the first time, the agreement can only be signed under the normal operation of the equipment.
Article 1; Agreement time
The validity of this agreement is from the date of the month to the date of the month.
Article 2; Content and scope of contract work:
1. Electrical scope: installation of fan power supply, freezer, refrigerator, microwave oven, induction cooker, upper and lower power supplies, dough press, air conditioner, fish tank, telephone troubleshooting, power supply transformation, lighting power supply, water heater, water boiler, rice cooker, TV set, fire fighting equipment and all charged equipment of Party A. ..
2. Water heating range; Water supply pipe, drainage pipe, heating, faucet changing, including water changing pipe.
3. gas stove; Gas pipeline, steel cylinder leakage treatment, minor pipeline changes, etc.
4. Work content: daily inspection, maintenance, debugging, sudden fault maintenance and equipment transformation of all equipment of Party A. ..
5. Supplementary explanation: During the contract period, if Party A increases equipment, it still falls within the scope of this contract.
Article 3; Obligations of Party B
1. Party B's maintenance personnel, home appliance repairmen, electricians, welders and other special types of work shall hold valid certificates issued by relevant state departments; And hold relevant certificates.
2. For the maintenance tools provided by Party A to Party B, if Party B's personnel are damaged or lost during use, Party B will be responsible for compensation.
3. All the work of Party B shall not be subcontracted to other units or individuals. Once found, Party A has the right to terminate the contract.
4. If Party A suffers economic losses due to the mistakes of personnel dispatched by Party B (lack of skills, slow maintenance or misoperation), Party B shall bear all economic losses.
5. According to Party A's notice of equipment failure repair, Party B gives priority to arranging personnel to come to the house for repair. After receiving the notice, in case of emergency, Party B must arrive at the site for general maintenance within one hour, and Party B can arrive at the site within two to four hours.
6. If Party B is informed that it cannot be repaired in time, Party A has the right to hire external maintenance personnel, and the expenses arising from maintenance shall be borne by Party B and deducted from the maintenance expenses of the current month.
7. Party B's door-to-door maintenance does not charge door-to-door fees and working hours.
8. There is no limit to the number of visits by Party B..
9. Party B only charges the maintenance spare parts fee, and guarantees that the spare parts fee is the market price or lower than the unified price of the manufacturer.
10. The replacement parts provided by Party B for Party A must be original parts. In case of special circumstances, Party B shall replace parts with similar technical indexes after consultation with Party A. ..
1 1. The parts replaced by Party B for Party A are damaged within the three-month warranty period, and Party B shall replace and repair them for Party A free of charge.
12. Party B shall make an equipment maintenance plan according to Party A's contract equipment and notify Party A. If Party A fails to send a maintenance notice, Party B will carry out on-site maintenance of Party A's equipment according to the maintenance plan. In general, on-site maintenance service is provided once every four months.
Article 4; Obligations of Party A
1. Party A shall notify Party B in time after the equipment fails.
2. Without Party B's consent, Party A shall not invite a third party to repair the agreed equipment, otherwise Party B will not bear the consequences and responsibilities arising therefrom.
3. When the equipment breaks down and the accessories need to be replaced, the expenses of the accessories shall be borne by Party A..
4. Party A has the obligation to provide necessary safety education to Party B's employees.
5. Party A shall bear all kinds of renovation expenses of the entrusted equipment during the maintenance agreement period.
6. Party A has the right to check Party B's work, repair and maintenance records at any time according to the equipment usage; Organize joint inspection of equipment including Party B, and put forward supervision, suggestions, praise and treatment for Party B's work.
7. Party A has the right to check the qualification certificates of Party B's personnel at any time to stop any illegal operation and scheme implementation.
8. Party A has the right to punish or dismiss Party B's incompetent employees according to the seriousness of the case, and Party B shall not refuse without reason.
Article 5; Contract cost:
1. The total contract price is RMB _ _ _ _ _ _ _ _.
2. After the signing of this contract, Party B shall submit a performance bond or a performance bank guarantee (unconditional irrevocable bank guarantee) of RMB yuan to Party A, and the performance guarantee period shall be one month after the expiration of this contract.
Article 6; Payment method:
Party A shall pay the service fee of last month to Party B in cash on15th of each month (postponed by national legal day). The fee is RMB yuan. Specific payment procedures shall be implemented in accordance with the provisions of both parties.
Article 7; Liability for breach of contract and dispute resolution:
1. Party A and Party B must conscientiously perform their rights and obligations under this Agreement, otherwise it will constitute a breach of contract, and the breaching party shall bear the liability for breach of contract, that is, compensate the other party for all direct, indirect and unforeseeable losses caused by breach of contract. If both parties are at fault, they shall bear the responsibility according to the degree of fault.
2. If Party A fails to make payment on time, Party A shall pay 0.5 ‰ of the unpaid amount to Party B as the late payment date. If Party B fails to inspect and maintain the equipment in time, Party A will deduct the cost of the measures taken from the expenses.
3. Any dispute arising from breach of contract shall be settled by both parties through consultation. This agreement is made in duplicate, one for each party. It will take effect from the date of signing the agreement. For matters not covered, Party A and Party B shall negotiate separately and sign a supplementary agreement, which has the same legal effect as this agreement.
Party A:
Party B:
Date:
- Related articles
- Which line should I take at the highway bridge and get off at that station?
- Is there a fire in the hot spring?
- How about Rainbow Boutique Hotel in Bangkok? Are there any interesting places?
- There are hotels in Kuala Lumpur airport.
- What five-star resorts are there in Boracay and which hotel do you recommend?
- Sample invitation letter for visit and inspection
- Hotel refrigerator management requirements
- How many stars does Shanghai Yiheng Hotel have?
- I signed a computer lease contract with a hotel. What should be paid attention to in this kind of contract signed by private and enterprise?
- Sentosa Island Hotel in Singapore, do I still need to pay the island fee?