Traditional Culture Encyclopedia - Hotel franchise - How many lines are there in Shenzhen Metro?

How many lines are there in Shenzhen Metro?

Shenzhen now has a total of 8 subways! !

1. Shenzhen Metro Line 1 (Luobao Line) Luohu (06:30-23:00) -- Airport East (06:30-23:00) 30 stations in total

< p>2. Shenzhen Metro Line 2 (Shekou Line) Chiwan (06:30-23:00) - Xinxiu (06:30-23:00) 29 stations in total

3. Shenzhen Metro Line 3 (Longgang Line) Yitian (06:30-23:00) -- Shuanglong (06:30-23:00) 30 stations in total

4. Shenzhen Metro Line 4 (Longhua Line) ?Qinghu (06:30-23:00) -- Futian Port (06:30-23:00) 15 stops

5. Shenzhen Metro Line 5 (Huanzhong Line) ?Huangbeiling (06 :30-23:03) -- Qianwanwan (06:30-23:00) 27 stations in total

6. Shenzhen Metro Line 7 (Xili Line) Xili Lake (06:30- 23:00) -- Tai'an (06:30-23:00) 28 stops

7. Shenzhen Metro Line 9 (Meilin Line)? Mangrove Bay South (06:30-23: 00) -- Wenjin (06:30-23:00) 22 stops

8. Shenzhen Metro Line 11 (Airport Line)? Futian (06:30-23:30) -- Bi First (06:28-23:34) 18 stations in total

Shenzhen Metro

Shenzhen Metro (Shenzhen Metro) refers to the urban rail transit serving Shenzhen City, Guangdong Province, China. The first line was officially opened for operation on December 28, 2004, making Shenzhen the fifth city in mainland China to have a subway system.

According to the information on the official website of Shenzhen Metro on June 30, 2017, Shenzhen Metro has opened eight operating lines, namely: Line 1, Line 2, Line 3, and Line 4. Line, Line 5, Line 7, Line 9, Line 11, ***199 stations.

The total length of the city’s subway operating lines is 285 kilometers, and the total length of subway operation ranks fifth in China. It covers six municipalities in Shenzhen: Luohu District, Futian District, Nanshan District, Baoan District, Longhua District, and Longgang District. The urban rail network of the borough. ?

According to information on the official website of Shenzhen Metro in September 2017, there are 13 sections of Shenzhen Metro lines under construction, including Phase 3 of Line 2 (Eastern Section) and Phase 3 of Line 3 (Southern Section). ), Line 3 Phase III (Eastern Section), Line 4 Phase III (Northern Section), Line 5 Phase II (Southern Section), Line 6, Line 8 Phase I (operating through Line 2), Line 9 Phase II (western section), Line 9 branch line (running through Line 12), Line 10, Line 11, Line 12, and Line 20, totaling more than 189.4 kilometers.

By 2020, Shenzhen Metro will form a rail transit network with 16 operating lines and a total length of 596.9 kilometers. ?

In 2016, Shenzhen Metro carried 1,093.1 million passengers throughout the year, with an average daily passenger volume of more than 2.9866 million. In 2015, its annual passenger volume was 930.66 million, and its average daily passenger volume exceeded 2.5497 million. In 2014, its annual passenger volume was 866.99 million, and its average daily passenger volume exceeded 2.3753 million people

Shenzhen Metro