Traditional Culture Encyclopedia - Hotel franchise - Model essay on field investigation report

Model essay on field investigation report

How to write the model essay of the field investigation report? On-the-spot investigation is an important research method to integrate practical courses and carry out research-based learning. Then, how to write the model essay of the field investigation report? The following is a summary of the field report I compiled for you. Welcome to reading.

More learning summary recommendation (click to enter ↓↓↓ ↓)

After learning this semester, summarize the study plan for next semester.

Summary and reflection of this semester's study

Summarize 500 words in the first semester of Grade One.

Senior two summed up the plan for the next semester last semester.

Summary and reflection of this semester

Learning experience summary model essay

Field trip report model article 1:

Report materials for field investigation of project engineering

First of all, thank you:

1. Thank leaders at all levels for coming to our school to guide the work on the spot.

Thank you for your dream project for our school.

Second, the report:

1, school profile:

There are currently 10 classes, including two or three classes in senior high school and one or four classes in senior high school, with more than 800 teachers and students, including 48 in-service teachers and more than 760 students. There are two teaching buildings and dormitories, and one canteen for teachers and students, with a construction area of about ***2700㎡.

2, the school bottleneck:

① The facilities are shabby and shabby. The teachers' and students' canteen with a civil structure of nearly 200㎡ was built in the early 1970s, and its foundation has been repaired and replaced many times. Regardless of the wind, frost, rain and snow, teachers and students eat under temporary iron sheds, and there are no teachers' collective offices and electric classrooms.

② The average area per student is insufficient. The existing building area of the school is about 2700 ㎡ (teaching building, canteen, dormitory and public toilet). At present, there are still 150 teachers and students renting in private houses, some students live in classrooms, and students of two classes eat in classrooms.

(3) There is an extreme shortage of funds. There are 3 temporary workers and 5 substitute teachers, all of whom are paid by the school and have to pay the rent. The school is in debt almost every term.

Third, the vision of the school:

Focusing on the sustainable development of the school, the school plans to build a new canteen and dormitory for teachers and students, and follow the principle of "strictly controlling standards and not being in debt" to build a new three-story canteen.

***700㎡, the dormitory building has four floors of ***840㎡, which are built in the west and east buildings of the school respectively. In addition, a two-story public toilet needs to be relocated. This idea is limited to alleviating the current situation of tight per capita area.

Fourth, the school requires:

1, I urge leaders at all levels to lend a helping hand, solve and implement the project as soon as possible, and do their best.

Increase funds. (Classrooms and offices are still unresolved)

2, please leaders at all levels can let our school from this period, the implementation of canteen construction, just in case.

There will be a loss of students when the school starts next spring.

Gu Jing Middle School 20__ _165438+1October 9th.

Article 2 of the field investigation report mode:

Investigation report of fire company

On the basis of contact and interview with several fire protection engineering companies in the previous stage, according to the engineering performance of each fire protection company in recent years, combined with the functional characteristics of Xiaoyun Road project itself, the engineering department selectively arranged field visits to projects in Beijing, including projects that have been accepted and put into use, as well as projects that have not been completed at the end of construction.

Tuesday, April 65438, 20__

Inspection unit: Brief introduction of Beijing Wharton Fire Safety Engineering Co., Ltd.:

Beijing Wharton Fire Safety Company was established in 1995, with the first-class qualification of fire control construction. The second deepening design was mainly completed in cooperation with Ma Jian International Design and Engineering Company (Grade A).

The company has more than 60 managers of all kinds. In recent years, it has successively undertaken fire protection projects of Tianyuan Port (2007), Jing 'an Center (2009), Qiaofufang Grassland, Caiyuan International Center, B7 Project of Financial Street, Westin Financial Street and other large-scale projects. The construction scope includes fire alarm linkage, fire sprinkler system, fire hydrant system, fire broadcast, etc.

Inspection items:

1. Caiyuan International Center: construction area10.6 million square meters, double-tower structure.

There is a main control room and a sub-control room respectively. Wharton Fire Company's contracting scope includes alarm linkage system, automatic sprinkler system and fire hydrant system. Select alarm equipment

It is a series of products imported from Notifier. At present, the project has also entered the completion stage, and some areas have been put into use in advance. Fire control acceptance passed the acceptance at one time.

2. Overseas Chinese Fufang Grassland: with a total area of 200,000 square meters, it consists of four buildings with different functions.

Body composition. Wharton Company's contracting scope: alarm linkage, fire sprinkler and fire hydrant system. Alarm equipment is a series of joint venture products of the notifier. The requirements of the project itself are relatively high, and the equipment runs well.

Overall impression: Wharton Fire Company has developed into a professional company with a certain scale since its establishment 10. The company has developed a fire engineering management information system in the industry, which can improve the traditional methods such as rules, drawings, equipment, construction items and progress statistics before, during and after the project, and can provide customers with the whole information service of fire engineering management. In recent years, some influential projects have been undertaken in key areas such as Financial Street and CBD. Over the years, we have established a good relationship with Beijing Fire Bureau. In view of this investigation, the preparation is relatively adequate, and it is promised that Caiyuan International and Qiaofufang Grassland Center Project Department will be the team.

Wednesday, April 20__ 13.

Inspection company: Aoyou Intelligent Fire Protection Engineering Co., Ltd.

Company Profile: Aoyou Functional Fire Safety Engineering Company was established in 1992, and has now developed into a comprehensive company integrating the design and construction of weak current intelligent systems. The company is a qualified supplier of Greentown Group, with cooperation projects such as Chengyuan Garden and Yuyuan Garden. The company has its own production base, supplying fire fighting equipment.

It has unique advantages in cargo safety.

Test item: Mingdun Road

The project has a total construction area of 200,000 square meters and is an urban complex, including office buildings, businesses and apartments. The Australian company undertook the alarm linkage (using Cathay Pacific equipment), sprinkler system and fire hydrant system of six buildings. At the same time, it also undertook the building automation system (Schneider equipment), security monitoring system, perimeter prevention system and parking lot management system of the project. And cooperate with the developer to rectify the remaining sub-projects that failed the acceptance, and finally passed the acceptance of the fire department.

Overall impression: Aoyou Intelligent Fire Safety Engineering Company is a weak current engineering company with strong comprehensive strength. They are responsible for HNA Building and Huayuan Metropolis around Xiaoyun Road. It has its own fire-fighting equipment production line and stable labor force to ensure the supply of personnel during the Spring Festival and the wheat harvest season. The company has an independent quality inspection department, which conducts a spot check on each construction site once a month. Now there are two branches, management and technical staff 170 people. The willingness to cooperate is very strong. For Xiaoyun Road project, some constructive suggestions were put forward in the early stage of design and drawing, and we promised to do a good job in the coordination of the whole stage of fire fighting project.

Friday, April 22nd, 20__

Inspection unit: Beijing Huaan Beihai Fire Safety Engineering Co., Ltd.

Company Profile: The company was first established by Beijing Fire Bureau. It is a joint venture between Huaan Company under Beijing Fire Bureau and Hong Kong Beihai Group Co., Ltd. In order to implement the central government's decision on the decoupling of military enterprises, Beijing Fire Bureau withdrew in 1998. public

The teacher is a top three qualification (design, construction, intelligence). At present, the company has about 60 administrative and technical managers, who have undertaken the construction of key projects such as T3 Terminal and Bird's Nest and the in-depth design of fire protection system.

Inspection items:

1 Central World Trade Center: With a total construction area of 200,000 square meters, it consists of four 5A-level office buildings.

Composition. Huaan Beihai Company undertakes the alarm and linkage system (using Japanese exploration equipment), fire water spraying system, fire hydrant system and underground fire pump room, with the best engineering conditions.

2. National Convention Center: This project will serve as an important comparison during the Beijing Olympic Games.

The venue has hosted fencing competitions and other competitions. Huaan Beihai Company undertakes the fire alarm and linkage system and automatic fire extinguishing system of this project. There are more than 10000 alarm points, and the fire alarm equipment adopts American Edward series products. The system is stable, reliable and highly automated. Because the project has the characteristics of large space and high height, infrared cross-fire alarm and high-pressure water cannon are widely used. During the inspection, we also found some problems left over from the design, equipment selection and insufficient coordination among various disciplines due to the rush of construction period, resulting in a large number of exposed pipelines, which deserves our attention in the early design stage and equipment selection and cooperation among various disciplines.

Overall impression: Huaan Beihai Fire Safety Engineering Company has a profound background and strong technical force. In recent years, it has undertaken large-scale key projects in many countries.

For example: Central Military Commission Office Building, National Stadium, National Convention Center, T3 Terminal, International Finance Building, Hanghua Science and Trade Center, etc. During the inspection, the company was pragmatic, did not conceal various problems existing in the construction, and also put forward very pertinent opinions and suggestions on how to deal with these problems. Strong willingness to participate in Xiaoyun Road project.

The above is the stage report of the first stage inspection of the fire engineering company. Relevant project inspection will be arranged in the near future, and all companies are invited to make written documents on the management and implementation of Xiaoyun Road project.

Friday, May 20th, 20__

Inspection unit: Beijing Akop Electromechanical Engineering Co., Ltd.

Company Profile: The company was established in 1992, and has the first-class qualification of fire protection facilities engineering design and construction, the first-class qualification of building intelligent system design and the first-class qualification of building intelligent engineering professional contracting. Is a research and development, marketing, consulting services, construction debugging, training and maintenance in one, starting with fire engineering as the main body, has now developed into an intelligent building and energy-saving system integrator. Provide users with services from engineering consulting design, equipment supply, installation, debugging and maintenance, adhere to integrity and business ethics, abide by the commitment to users, provide high-quality equipment and high-quality services, and win the trust and support of users.

Inspection items:

1, Ocean Guanghua International Project (completed project)