Traditional Culture Encyclopedia - Hotel franchise - Matters needing attention in partition of shower room How to choose shower room

Matters needing attention in partition of shower room How to choose shower room

You can try to push and pull several times when you buy it. Thick products will give people a sense of stability and firmness. When choosing shower room partition, besides looking at the thickness of glass, we should also pay attention to the following points:

1, see 3C certification. The glass in the shower room must be high-quality products, and consumers can check whether there is a laser-printed 3C logo on the glass.

2, film protection. Even tempered glass has a certain probability of bursting, and it is best for qualified consumers to stick an explosion-proof film on the glass shower room. Even if there is an accident, the glass fragments will only stick to the film and will not splash to hurt people.

3, aluminum. Choose aluminum with higher hardness and thickness. The aluminum thickness of qualified shower room should be above 1.2 mm, and the aluminum of hanging rail glass should be above1.5 mm. The hardness of aluminum can be tested by hand pressing aluminum frame, and it is difficult for adults to deform aluminum with hardness above 13 degrees by hand pressing. In addition, the smoothness and color difference of aluminum surface are also important standards to verify its quality.

4. Roller skating. Good quality roller skating has good sealing performance of materials and wheel seats, and water vapor is not easy to enter the wheel to ensure its smoothness. Roller skating should be closely matched with the guide rail, and the gap should be small, so that it will not fall when it is hit.

5. Check before installation. Before installation, consumers should check whether the glass edge is damaged, and whether the chamfering and edging treatment are smooth. Because even small wear may occur after installation. In addition, it depends on whether the product design has boutique shelves, sealed magnetic strips, cushioning devices, etc. If you buy a shower room with a base, it depends on whether the stone base and the bottom basin are closely connected and whether the adhesive tape is closely attached to the adhesive tape.

Precautions before installation:

Investigate the installation site, check the size, and ask the customer to provide the wiring diagram of hidden water and electricity pipes, further verify whether the location where the shower room is about to be installed conflicts with the installed water and electricity pipes and switches, and verify whether the wall to be drilled can bear the load and avoid unnecessary troubles.

Installation step

First, ask the customer to agree to put the product in the designated place and pad it with soft objects to avoid damaging the floor or goods; Clean up the installation site, clean up the location of the shower room in advance and verify the size;

Second, open the package, take it out and check whether the product accessories are damaged;

3. Installation of stone foundation: Measure the size and put it on the stone foundation. After being parallel, vertical and horizontal, fix it with glass glue. After fixing, do not move the stone base to avoid damaging the viscosity of the glue;

Fourthly, according to the indoor position of the fixed glass, the fixed glass sleeved on the aluminum material is locked at one end of the upper and lower rails with screws, and then the other two corners of the fixed glass are locked on the upper and lower rails with F-shaped clips;

Five, the house can be flat on the ground, padded with foam or thick wood blocks.

1. Insert two pieces of movable glass into the wheel groove of the upper rail and the wheel groove of the lower rail respectively according to the instructions of "side display" (when installing two pieces of movable glass on the upper and lower rails, pay attention to uniformity, and do not turn the screws of the suspenders at will to avoid uneven wheels);

2. After the two movable glasses are correctly installed indoors, the other aluminum sheet is fixed on the upper and lower tracks with screws, and then the two aluminum sheets for locking the wall are sleeved;

6. Move the assembled house body to the stone foundation, adjust the position and level, mark the wall, mark it as crossing the wall through the screw hole in aluminium scrap, and then move out of the house body; First, use a glass drill with a suitable aperture to drill through the ceramic tile, then use an impact drill with a corresponding aperture to drill into the depth of the wall hole, and then drive in an expansion rubber plug;

Seven,

1. Move the assembled house to the previous position and fix the house on the wall with screws;

2. Install the aluminum decorative cover plate on the aluminum sheet.

Eight, install the handle, magnetic adsorption tape and water retention tape, etc.

Nine, check whether all the accessories are installed, check the firmness of the house, and ask the customer to accept it. After the customer's acceptance, explain the use precautions and maintenance details to the customer in detail, and finally fill in the after-sales service form.