Traditional Culture Encyclopedia - Hotel franchise - Information required for hotel decoration and construction application
Information required for hotel decoration and construction application
1, property ownership certificate, and the non-owner shall issue the owner's power of attorney; ?
2, hired decoration construction team qualification certificate, project leader's ID card, business license and other copies; Simple decoration, the owner must issue a decoration guarantee, do not need qualification certificates and other materials; ?
3, building plan, construction plan, elevation, water and electricity construction drawings and other information. ?
4. After the information provided is submitted to the management office for review, the owner or the owner's authorized person shall fill in the decoration project declaration form.
5. The decoration engineering application form and building materials shall be submitted to the engineering and technical personnel of the management office for examination and approval, and then the decoration shall be approved by the director of the management office.
6, after approval, decoration construction director and management office signed a decoration responsibility. ?
7. Decoration management service fee and deposit: the management service fee shall be paid by the construction unit to the management office according to the 2 yuan per square meter; The deposit shall be paid by the construction unit to the management office according to the standard of per square meter 10 yuan (the deposit can be fully refunded after three months of decoration acceptance without any engineering problems); ?
8. The management office shall issue a decoration start-up sheet and a decoration responsibility card, and the construction unit shall handle the temporary pass for the construction personnel before carrying out the construction. Two. Information required for fire control examination and approval (1) "Shanghai Construction Project Construction Site Fire Control Audit Declaration Form"; (2) Review opinions on fire protection design of building engineering; (three) fire safety measures and the system of using fire and electricity; (4) Fire safety agreement signed by Party A and Party B; (5) Construction organization design scheme (expressed in the form of construction general plan and text, indicating fire lane and fire equipment).
Three: fire approval procedures?
First, fill in the Declaration Form for Fire Prevention Audit of Building Interior Decoration Design and the Declaration Form for Fire Prevention Audit of Construction Site. Remember that the applicant should be the construction unit, not the construction unit. The construction unit needs to affix its official seal and present the rental agreement or purchase agreement. If it is handled by the construction unit, it can only be said that it is an agent.
2. The contents filled in the declaration form are basically the main building materials, such as partition materials/floor materials/top materials.
3. It is necessary to prepare a copy of the drawings for the overall fire control acceptance of the place (generally available in the property management office).
4. It is necessary to prepare the plan, electrical diagram and fire-fighting reconstruction diagram of the specific construction site (the fire-fighting facilities can be explained in the remarks). The above drawings need to be blueprinted and stamped by units with design qualification (such as architectural design institute).
5. The local fire brigade will inspect the site within 10 working days and put forward written opinions. If it agrees, it can start working; If not, you may need to modify the renovation plan.
6. Two weeks before the renovation, you can submit a declaration form for fire control acceptance of construction projects, and the contents of the declaration form are basically the same as those of the declaration form. Generally, the fire brigade will randomly check 2~3 kinds of building materials for testing (PVC pipes, blockboards, curtains, etc.). ).
7. If they pass the examination, at least 2 people from the construction unit shall participate in the fire protection training (compulsory).
8. After the project is completed, the fire brigade will go to the site for inspection, and some rectification opinions will be listed. Just do it. Then, it will send a fire inspection and approval letter to the construction unit.
- Related articles
- Scenic spots around Beijing Xinggong International Hotel
- The hotel in Luohe has a pedestal for 3 people.
- What do you mean, too hot pants?
- What is the star rating of Chengdu Perry Hotel?
- Recommended places to enjoy snow scenery around Chongqing
- What is the real event of Mumbai Hotel?
- Which manufacturer produces imidacloprid black?
- How to get from Shanghai Hongqiao Station to Shanghai Rentai Business Hotel (Dongfang Road Branch)
- What are the closest hotels to Shanghai Benz? And the price is not expensive.
- How far is it from Qionglai to Daocheng Yading Airport?