Traditional Culture Encyclopedia - Hotel reservation - There is an urgent need for a decoration budget with an indoor area of 68㎡.

There is an urgent need for a decoration budget with an indoor area of 68㎡.

Decoration budget table

Number Project Name Unit Quantity Unit Price Breakdown Total Labor Total Remarks

Labor prices of main materials and auxiliary materials.

First, the ceiling part

1, wooden keel base of living room ceiling 4.0519.59 0.5100 40.53 * 4 battens, five-centimeter wood plywood.

2. Living room ceiling plasterboard cover M2 4.0517.345438+0507 6.4438+05068 0.510040.5 Belle gypsum board and special gypsum board screws.

5. Plastic steel buckle of kitchen and bathroom ceiling M2 8 59 40118 472144100 wide aluminum buckle.

6. Make up the ceiling and putty for three times M2 48 413192144 putty powder, white latex, putty, adhesive tape and sandpaper.

7. The latex paint for the ceiling is 4 times M2 48 4.31.3 03 206.4144 macro paint primer and ICI topcoat.

Second, the wall part.

1, tile in kitchen and bathroom shall be pasted with m21.64125.53.512885.6259.2.

2. Paste M254125.551320565 on the balcony wall brick.

3. Fill the wall with putty m2 130 4 1 0 3 520 390 putty powder, white latex, putty, adhesive tape and sandpaper for three times.

4. The interior wall latex paint is four times m2130 4.310.3 03 559 390 macro primer and ICI topcoat.

Third, the ground part.

1, canteen floor tile paving sheet 24 44 25 6131056 312.

2. Wood flooring m2 40 70 70 0 0 2800 0

3. Floor tile for kitchen and bathroom m2 8 48 30 5 13 384 104.

4.M2 sunshine window stone pavement 0.514012010/0 705

5. Make M2011515 220100 9mm wood plywood, veneer and wood line as the baseboard.

Fourth, the wooden part.

1, the shoe cabinet is made of m0.83351503515026812015mm wood plywood, decorative boards, Boeing plates and customized doors.

Door hinge 6 2.5 2.5 15

2. Wardrobe M6 585 400 35150 3510 90015 mm wood plywood, decorative board, Boeing plate and customized door.

Door hinge 1 60 60 60

3. Floor hanging cabinet M3.435016535150190510/5 mm wood plywood, decorative board, Boeing plate, customized cabinet door.

Door hinge 1 60 60 60

Table artificial stone m2 3 270 270 8 10

4. Doors and door covers 4 inches 500 500 2000

Door locks and hinges 3 4 100 100 400

Slide rail and pulley sleeve 2 100 100 200

Water heater, cooker, range hood, yuba cover1153015301530.

Kitchen hardware set 1 350 350 350

Bathroom hardware set 1 300 300 300

5 balcony cabinet M3.2240120120 768 384

Second bedroom computer desk 1 450 400 50 450 50

6 Washing platform 1 500 500 500

Verb (abbreviation for verb) paint part

1, rope color varnish barrel 2 60 35 5 20 120 40 giraffe paint

Sixth, the hydropower part.

1, power cord 1.5 to 4 87 90 348 Dove brand wire.

2. Power cord 2.5 turns 3 120 360

3. Power cord 4.5 turns 2 187 374

4, closed loop 00000 pigeon silk

5. Telephone bell 1 60 80 60 pigeon line

6.PVC conduit m 60 2 yuan 212 billion conduit

7.PVC conduit fittings: 30.252575 billion conduits.

8, switch socket bottom box 46 0.5 0.5 23

9. Switch socket 46 10 10 460

10, PPR tube m 50 6.5 6.5 325 Pegasus PPR tube

1 1, PPR fitting 30 9 9 270 Pegasus PPR fitting

12, PVC drainage pipe m106.56565 billion 1 10 drainage pipe

13, PVC drainage pipe fittings 5884 billion 1 10 drainage pipe fittings.

14, floor drain 3 18 18 54 stainless steel floor drain

15, Angle valve and flexible connecting sleeve 5 25 25 125

16, labor cost of water and electricity installation M265111715715.

17, living room lamp, dining room lamp 2 140 140 280

18, small balcony, kitchen, large balcony 3 40 40 120

19, bedroom 2 60 60 120

Seven, the civil part

1, wall demolition and slotting project 1 300 300 300 300 300 300.

2. Backfill project1120 80 40120 40

Waterproofing of toilet M2 4.32 25 205108 21.6

Eight. Subtotal 24563 52 18.8