Traditional Culture Encyclopedia - Hotel reservation - Installation solution of hot and cold faucet
Installation solution of hot and cold faucet
The installation diagram of hot and cold faucets is as follows:
Tools: Four Seasons Muge hot and cold taps, water inlet pipes, horseshoes, screws and nuts.
1. Sort out all the accessories of hot and cold faucets and check whether there is a reference manual with instructions.
2. First, connect two water inlet pipes to the water inlet of the hot and cold faucet.
3. After the connection, put the fixed column of the hot and cold faucet into two water inlet pipes.
4. After everything is ready, install hot and cold taps on the basin, and put a water inlet pipe at the opening of the basin.
5. Finally, fix the horseshoe and tighten the screws and nuts.
- Previous article:How many stars is Mercure Hefei Sunac?
- Next article:What should we pay attention to in color platter?
- Related articles
- What is the postcode of Huashan Town, Huadu District?
- How about Chongqing, Chongqing and raffles city?
- Thailand 10 day 10000 RMB?
- How many kilometers is it from 62 Tuan Garden Community in Huocheng County, Xinjiang to Horgos Tianrun International Hotel?
- Speech for new hotel employees
- What time does Pingtang Kowloon Boutique Hotel check out?
- How to get to Langham Hotel Nanfeng from Tianhe District?
- How to lock the door when staying in a hotel?
- How many stars is Walden International Hotel in Ganzhou Station?
- Please invite some military Gao Qian to favor this style of writing, and don't be run by the peach fruit as white as a city camp, and dare not have a lifelong fate. The hero is the best.