Summary of annual work of architecture

Summary is a written material for reviewing, checking and evaluating a certain stage of study or work afterwards. It can improve our written expression ability. Let's write a summary for ourselves. How is the summary generally written? The following is my collection of four annual work summaries of architecture. Welcome to share.

Annual work summary of the building 1 Reviewing the work of the department in the past year, first of all, I would like to thank the leaders of the company for their concern and support, the coordination and help of all departments of the company, and the colleagues in the engineering department for their hard work and professionalism, so that the engineering department can continue to grow and develop. My work summary will be divided into three parts, one is my 20xx work achievements, the other is my 20xx work goals, and the third is my work gains and losses and rectification.

A, the project performance report

1. Project: Ground source heat pump will be built in 20xx 10. By 20xx 10, 325 vertical buried pipes, 485 horizontal pipes 1800 meters and uplift piles will be completed, with an output value of 6.58 million yuan. Complete the construction permit in 20xx, and submit the commencement report on. By the end of the year, the basement will be completely completed, and the main building area will be basically+/-. The overall construction quality is excellent, with an output value of 67.8 million yuan, plus 6.5 million yuan for preliminary earthwork construction and 4.75 million yuan for foundation pit slope support, with an output value of 85.95 million yuan.

20xx 10 month, after many discussions, the design scheme of one-pole double-push-pull ice curtain wall was finally determined. 10, the observation meeting of safety and quality engineering construction and advanced project team creation was successfully held, which was well received by the leaders of the Standing Committee of the District Party Committee and the deputy district head, and has been recommended to the Organization Department of the Municipal Party Committee.

2. Project: 20xx year 10, overcoming unfavorable factors such as rainy season, imperfect construction facilities, incomplete construction drawings, and inadequate personnel and machinery, organizing construction and carrying out work, all earthwork (including a large amount of silt) was transported abroad, and the foundation was replaced and filled, with an output value of 3.2 million yuan. Deep foundation pit slope support construction, with an output value of 2.3 million yuan. Cooperate with the civil air defense project to complete the basement floor construction, the basement roof construction is completed 50%, and six single-family commercial buildings are completed to the second floor. Output value 10 million yuan. In fact, the hospital has completed the final fine decoration scheme after handling the "Building Project Planning Permit" through multi-party coordination.

Second, the work objectives

1. Project: The main building of the office building is scheduled to be completed in 20xx, and the hotel is partially completed to the 28th floor. To ensure the standardized construction site in the city, when the main body of the plan is constructed to the 5-6 floor, the new technology application observation meeting will be completed in conjunction with the district quality supervision station.

2. Project: The single-family business building is planned to be put into use in 20xx 10, and the construction of the main building is planned to be completed by the end of 20xx, striving for a standardized construction site in the city.

3. Project: This project is a government project to solve the relocation, which will be implemented after the completion of the Electric Power Bureau due to the influence of underground high-voltage lines. According to the news from the electric power department, construction will start in June of 20xx, and it is planned to complete the monomer acceptance within 1 year to ensure the standardized construction site in the city.

Third, work gains and losses

The company has gone through nine years of development, from initial primitive accumulation to continuous growth and improvement, from initial humanistic management to institutional management and corporate culture edification, which has promoted the leap-forward development of enterprises. The engineering department has made great efforts in improving and establishing the system, and constantly explored updated project management methods in field management, and gained valuable experience, which needs to be improved through a lot of work.

1, unclear responsibilities, regardless of responsibilities:

Project management is a systematic management and overall arrangement, which carefully organizes and deploys personnel, materials, machinery and articles and makes rational use of them. At present, the work flow or responsibilities in engineering projects are unclear, and whoever is in charge is responsible, who is responsible for implementation, and who is responsible for supervision and implementation has not yet become a system management. The engineering department and other departments still have imperfect principled work distribution, so the engineering department can't just be a project department to manage the quality and progress of the construction site.

2, work cohesion is not enough, resulting in passive work:

The responsibility system of the engineering department and the responsibility system of the project have always been controversial, and the management brought by it needs to be improved. Leading to problems in work cohesion. The engineering manager can do whatever he wants, but he can't help but ask, but the specific work, how to report, how to study, how to determine and how to cooperate professionally can't be well connected. Work style and mutual cooperation need to be improved.

3. Poor law enforcement and enforcement:

Good management needs to be implemented. The engineering department summarizes the work achievements and difficulties once a week and listens to the work reports of others in the department. This is extremely important for engineering construction and coordination between departments. Everyone should adjust their working hours and take an active part in regular meetings. Repeatedly asking for the timeliness of visas, making monthly capital statements, adjusting the total capital plan every quarter, asking for contract pricing and price analysis are not in place, and the implementation of the arranged work needs to be improved.

4, feedback is not timely, work procrastination:

Shortcomings in responsibility implementation and accountability, reward and punishment mechanism, humanized management, etc. have caused the staff to delay and wait. They only do their own work, without reporting and feedback. The work required to be completed on time is always procrastinating and needs to be urged many times. The finished quality needs to be further improved.

The engineering department is relatively young, and the difficulties are still great.

This year is a relatively healthy year for the flow of engineering personnel. There are nearly 8 new engineers, and the relevant salaries and benefits are formulated by the company. However, for the new engineers who come to the engineering department, we are lacking in work distribution, connection, management coordination of the competent leaders and assistance from the old employees. The relatively young architecture system has relatively weak ability to control and coordinate the site. There are still some problems in the project, such as cutting the steel structure members in different places, opening holes at will in the web, bending the main reinforcement of the beam too much, welding the horse stool with the main reinforcement without lateral support, and omitting the reserved holes for installation.

6. The project is relatively difficult and the quality control is difficult.

There are still some technical difficulties to overcome. Steel structure building, ground source heat pump and circulating fresh air system, snowflake glass and push-pull curtain wall, large cantilever, civil air defense structure, etc. It is a test for young engineering students.

7. Lack of communication and supervision with design;

The preliminary design scheme takes a long time and the construction period is shortened, and the engineering department has not yet formed an effective discussion mechanism to deal with the selection task of design works. Design units are mostly in other places, and there are two schemes and construction designs, so the coordination work is more and more complicated. In addition, in recent years, the design institute has fewer people and more work. In the later design coordination and supervision, it is often time-consuming and inefficient to solve problems by telephone and email.

Fourth, the engineering department as the target.

1, strengthen the system and carry out implementation:

The year of 20xx will be the year when the system of engineering department is perfect, and the year of 20xx will be the year when the system of engineering department is implemented. Continue to carry out in-depth management of the five-routine method, do a good job in regular and continuous management, and implement it in project management. Fully implement project inspection and improve the construction of project management system. Conscientiously implement the established and sound system in the past, continue to improve the relevant management system, and take the road of institutionalized management engineering department construction. Strengthen work distribution, implement responsibilities, improve rewards and punishments, and comprehensively coordinate the work of the engineering department.

2. Strengthen the internal communication of the project, especially the discussion mechanism above the deputy manager:

Strengthening the internal communication of the project can not be solved by a simple countersignature system. Coordination meetings should be held to avoid individualism and give full play to collective efforts to solve project problems. Strengthen the communication mechanism between project departments and learn from each other. At the same time, improve the key management convergence and discussion mechanism of the engineering department, and improve the reporting and discussion mechanism of major issues.

3, strengthen the investment control and capital reporting system:

It is planned to complete the engineering quantity audit every month from next year, establish a monthly report system, and comprehensively control the project completion output value, audit results, contract payment and company fund allocation. And report to the company leaders every month to strengthen and attach importance to investment control.

Summary of the annual work of construction Chapter II After the new leadership team is basically determined this year, in the face of various difficulties, our company has embraced the top priority of accelerating the company's development. Starting with improving the cohesion and combat effectiveness of the leading group, we mobilized the enthusiasm of the employees and enhanced the vitality of the enterprise with the new ideas and concepts of keeping pace with the times, and successfully completed various economic and technical indicators issued by the company in the first year. The following is a summary of this year's work.

First, pay attention to strengthening ideological construction.

In the face of fierce market competition, management pressure, financial pressure of domestic debt and foreign debt, internal management pressure caused by low quality of enterprise economic operation, and pressure caused by employees' ideological and emotional instability all pose new challenges and tests to the leading group from the aspects of ideological concept, mental state, leadership ability and management level. To this end, the company starts with strengthening the ideological construction of the leadership team, strives to build a high-quality leadership team that can shoulder heavy responsibilities and stand the test, pays close attention to the implementation of the learning system, and carries out targeted education.

The central collective learning system has been restored and strengthened, ensuring the channels of ideological education and collective ideological exchange. Grasp the ideological problems and universal problems in the leading bodies and carry out targeted education. It has greatly improved the rule of law awareness of leading cadres in governing enterprises according to law and safeguarding the legitimate rights and interests of enterprises according to law. Enrich the knowledge of leading group members in thinking methods, leadership art, modern management, etc., improve leading group members to continuously realize, safeguard and develop employees' interests, guide and protect employees' enthusiasm, and give full play to their political and ideological qualities.

Second, pay attention to strengthening synergy.

After the new leadership is determined, whether the enterprise can quickly adapt to the requirements of the development of the situation in the face of pressure and challenges and complete the tasks entrusted to us by the company depends on the ability of the leadership and the joint efforts of the leadership.

To this end, we actively bear these pressures, solve the sued affairs one by one, and understand the responsibilities by implementing the division of responsibilities of the leading group, so that the leading members can bear the responsibilities, enjoy the benefits, shoulder the indicators and work together in order to achieve the same goal of xx Company. Through strict cadre laws, government decrees are smooth and consistent. The deputy directors of the leading group make up for each other and cooperate with each other. Solve the differences in thinking and understanding of the leading group by individual conversation or holding a team life meeting. By carrying out criticism and self-criticism, we can make everyone feel comfortable and sincere, and form a strong leadership core.

Third, pay attention to strengthening work style construction.

Pay attention to the diligent system of leading bodies and carry forward the style of hard struggle. Further standardized the work behavior of leading bodies and the work style of leading cadres. The second is to grasp the clean government style of the leading group. According to the requirements of the company's clean government, the leadership team publicly signed a clean government responsibility letter at the workers' congress, which realized the commitment of doing a down-to-earth job and being honest and clean.

Fourth, take the lead in setting an example and improve the affinity for employees.

Establish and implement a management mechanism with controllable cost and coexistence of incentives and constraints. Mobilize the enthusiasm of the project and create efficiency consciously. Through the project evaluation system, the project has continuously become the power source of predecessors' productivity. The image and behavior of the leading group embodies the hearts of the majority of employees. Leadership is related to employees and employees are related to enterprises. With the help and support of the company, xx Company will be full of vitality.

Summary of the annual work of architecture Chapter III Time flies and the annual rings are lightly driven. Unconsciously, the six-month probation period has passed. Looking back on the past, there was a lot of running and hardship, and more was moving, comforting and harvesting. Since I came to South China Company, I have gradually grown from a naive and ignorant student to a diligent and dedicated railway construction employee. Over the past six months, I have been studying hard to improve my ability in all aspects and adapt to the construction industry as soon as possible. With the help of my tutor and colleagues, I have fully integrated into this big family, successfully completed various tasks, and improved my ability in all aspects, laying a good foundation for my future work and study. Summarize the six-month probation period, mainly from the following aspects:

First, change ideas, face up to shortcomings and strive to become engineers. When I first arrived at the project department of West Factory, I realized the inconvenience caused by my lack of knowledge, especially the lack of engineering knowledge. So, I took advantage of the opportunity of being a surveyor in the project department of West Factory to actively dabble in the basic knowledge of project management, read drawings, consult engineering materials, turn over professional books, consult my predecessors ..., thus mastering a lot of preliminary engineering knowledge such as engineering terminology, surveying technology and tunnel technology. , basically meet my current work needs in this new position in the comprehensive office. However, there is no end to learning, and I am still a layman in engineering. At present, the East Ring Road in Hainan where I am located is a standard double-track railway project for passenger trains. I will make unremitting efforts to learn all kinds of engineering theory knowledge and apply it to practical work to better meet the needs of industry development.

Second, correct mentality and attitude, and seize the opportunity to learn social experience. I spent the past six months on the run. I have changed four project departments (Guangzhou West Factory, Renhe, Hainan East Ring Area 1 and Area 2) and visited nearly ten cities (Zhuhai, Guangzhou, Panyu, Beijing, Hainan ...). Even if the scenery is beautiful, I can't enjoy it with tired eyes. I have to say that psychological fluctuations are quite large, I have complained and been angry. However, with the help of my tutor and colleagues, I soon realized that my negative attitude was very unfavorable to my work. So I adjusted my mentality in time. First of all, I corrected my work attitude. As long as my job requires, I don't talk about conditions, and I don't even stay up late. Whether it's on-site investigation, setting out and piling, or sorting out information and filing, I can guarantee to finish it within the specified time. Secondly, I treat every change with a positive learning attitude. In Panyu, I learned negotiation skills and dealing with the local government. In Beijing, I learned about corporate publicity and reporting. In Guangzhou, I went deep into the front line of construction and learned the construction experience of the project site and the indomitable spirit of the workers. In Wanning, Hainan, I really returned to my professional work. With the guidance and help of my secretary and tutor, I quickly became familiar with my business work. At the same time, the increase of social experience has given me a deeper understanding of social life and will also bring unexpected help to my future work.

Third, look more and think more, learn more and do more, and effectively improve business ability and comprehensive quality. Just arrived in the second district of Donghuan project department, there is no special person in charge of office affairs, and many problems need to be solved urgently. Faced with this situation, I didn't sit still, but faced it positively, straightened things out one by one, did what I could, and asked my tutor and colleagues immediately if I didn't understand. In one month, not only the logistics support system was fully established, but also the worries of the project department were solved; It is also necessary to establish and improve the file management system, do a good job in the daily management of the office, and serve all departments to carry out their work; At the same time, it also cooperated with the bureau headquarters to complete the safety and civilized construction of the East Ring Railway. While finishing the work, learn with an open mind, think repeatedly, find out the shortcomings and try to improve everything. By reading related books and previous information articles, I gradually mastered the skills and methods of daily work such as document processing, information research, meeting preparation and foreign affairs reception, and my personal business ability has been greatly improved.

Four, love their jobs, abide by the law, persist in learning, and constantly improve their ideological and theoretical literacy. With my familiarity with all aspects of the enterprise, I gradually recognized my identity as a railway builder, so I must have a sense of responsibility as a master. I firmly believe that the space for development is right in front of us, and the key is how to grasp it. Only by being dedicated and doing something can we make greater contributions to a better tomorrow. As a preparatory party member, I have been studying the Party's political theory. Through continuous study, I have further improved my ideological and theoretical accomplishment and firmly established my life values of serving the people wholeheartedly. Now we advocate a harmonious society, and our practical work also needs to implement the concept of harmony, harmony with colleagues, harmony with owners and harmony with localities.

Summing up the past, being impetuous and not rigorous, and not studying new things and new knowledge deeply enough are all accompanied by these shortcomings in the work. How to overcome these shortcomings in the future will be the future work.

Summary of Annual Work of Architecture 4 20xx is an extraordinary year, a year in which all people in China feel glorious and happy, and also a year in which all people in China feel sad. Happily, the Olympic Games was successfully held in China. Sadly, the people of China experienced an unforgettable natural disaster (5. 12 Wenchuan Earthquake). Through the strength of unity, we successfully hosted the Olympic Games and overcame the pain caused by the earthquake. 20xx years are about to pass, and a new year is about to begin. Summing up the work experience and lessons of the past year is helpful to foster strengths and avoid weaknesses in future work and better manage technical data. The following is a summary of several aspects of work in the past year:

First, the main work this year:

In 20xx years, I have experienced the completion data of "Mingxin, Tianlong Ruijing" project and the work of "1-4#" building quality and safety (foundation, main body and "standardization"), and studied the budget with the on-site technical director. The project of "Mingxin Tianlong Ruijing" was completed and accepted on 20xx year 65438+1October 25th, and the completion data was collected and arranged within the time specified by the company, and delivered to Chengdu Xindu District Archives for filing as required. The project "1-4# Building" started on April 1 day of 20xx. Before the project starts, collect and sort out the project preparation materials according to the requirements of relevant specifications. 20xx65438+February 2002 65438+February 2002 1-4 building foundation and main body acceptance, collect and sort out the foundation and main body data according to the specification requirements, and pass the acceptance. 1-4# building foundation and main body acceptance, the data once passed the acceptance of Xindu District Quality Supervision Station and related units.

Second, the specific work:

1. Organize the completion data of "Mingxin Tianlong Ruijing". After the project is completed and accepted, collect the data of subcontractors in time, and organize the formation, accumulation, filing and filing of various engineering data to make the construction data complete and accurate and meet the relevant requirements. In March of 20xx, the completion data of "Mingxin Tianlong Ruijing" successfully passed the acceptance of Xindu District Archives, reaching the qualified standard.

2.① Quality data: "Xinzhu 1-4#" is a newly-built project. According to the progress of the project image, timely and accurately collect the material certificate, conduct material test, fill in the information of concealed engineering inspection lot and partial project, and ask the site supervision engineer to sign and seal in time, so that the inspection lot, partial project, concealed acceptance and material test date of building materials are consistent with the actual construction date and meet the requirements. For each key construction site, a series of targeted construction schemes are formulated, such as earthwork scheme, basement waterproofing scheme, thermal insulation scheme, external frame cantilever scheme, standardization scheme and formwork scheme. , should be promptly reported to the supervision unit for approval. Because the engineering data truly reflect the achievements of engineering construction, and the data are all kinds of information records formed in the process of engineering construction, only the on-site construction management personnel fully cooperate can this work be completed and done well. Responsible for the management of construction materials, collecting, sorting and archiving construction materials. Construction data is a real record of the construction carried out by the construction unit in the process of engineering construction, and it is a systematic project. It involves the substantive work of engineering contractors such as supervision units, construction units and design units, making the construction work scientific and standardized. Prepare project department meeting minutes and project department quality and safety monthly report. The monthly report is the project department's summary of the project progress and construction work within one month, and it is also an important basis for the relevant departments to check and evaluate the work of the project department. So it is very important to do this work well.

② Safety data: fill in all safety and civilized construction data of the project in time, conduct "three-level safety knowledge education" for new workers in time, and fill in the "three-level safety education record card" for filing. Before the construction of each working procedure, the safety technical disclosure shall be made to the workers before and after the shift, and the safety education records of the workers before and after the shift shall be kept on file. After the construction of each working procedure is completed, it shall be checked and accepted in time together with relevant personnel, and relevant safety information shall be filled in, which shall be signed and sealed by relevant inspection personnel. According to the requirements of relevant safety regulations, collect all kinds of certificates and test reports of safety protection articles, organize them into paper and file them.

③ "Standardized" data: On February 22, 20xx, at 65438, Xindu District Safety Supervision Station conducted the preliminary acceptance of "New 1-4# Building", and the standardized data was well received in Xindu Safety Supervision Station. I refer to various specifications and consult the predecessors of on-site construction management, and collect and sort out safety data in strict accordance with various safety specifications.

(4) Budget study: As I have not studied budget before, I still have some information work to do. In view of this situation, I should arrange my work reasonably, prioritize, grasp the key points and give consideration to others. In order to enrich myself in the new construction site, I made full use of the evening time to learn the calculation of engineering quantity from the on-site technical director, starting with the initial main floor formwork, concrete, steel bars and so on. If you don't understand anything, ask the site management personnel in time, and through unremitting efforts, you have a further understanding of the budgeted engineering quantity.

Third, the problems existing in the work:

Engaged in the collection and arrangement of quality and safety information in the past two years, I often feel busy and responsible; Big and small things are all in the body, and they often pay attention to this end, but ignore that end, failing to work systematically in all directions. Insufficient understanding of various specifications leads to loopholes in filling in data. Although this can't affect the acceptance of project quality and safety quality, I always feel that I am not doing well. I hope I will try my best to do better in my future work.

Fourth, the future work plan:

By summing up the work in the past year, we can find out the shortcomings in our work so as to overcome them in our future work. At the same time, we need to read more books, study norms and related documents, master professional knowledge, improve our working ability, strengthen our sense of responsibility, and do our personal work in time.

In short, in the future work, I will constantly sum up and reflect, constantly spur myself, enrich my energy, improve my quality and professional knowledge level, so as to adapt to the development of the times and enterprises and make progress and growth together with the company.