How to write the hotel weak current construction contract?
(ZD-JX20 12 1230) Employer:
Contractor: (hereinafter referred to as Party A) (hereinafter referred to as Party B)
Contract content: Construction unit:
Address: Contractor:
Address:
In order to clarify the rights and obligations of this project, Party B's contractor is carrying out the construction in accordance with the Contract Law of People's Republic of China (PRC) and relevant regulations and on the principle of equality, mutual benefit and consensus, and signs this contract. Chapter 1 Project Content, Scope, Progress and Time Limit Project Name:
Form of contract: both parties sign the contract subject first. According to the design scheme, system functions and equipment materials confirmed by Party A, Party B contracts the equipment supply, installation and debugging of the whole system. The report of demand list of sectional works shall be signed and confirmed by Party A, and the sectional works shall be loaded into the contract in the form of annex xx hotel configuration list and accessories as the settlement basis.
Project content: equipment, materials, wiring, installation, testing, acceptance and maintenance services. Project scope: conference lighting system, video monitoring system, perimeter alarm system, network integrated wiring system, all-in-one card system, intelligent passenger control system, information release system, background music system, hotel door lock system, weak current computer room, bridge, etc. Design, procurement, installation, debugging, opening and training of the above system.
Project progress:
1: After signing the master schedule contract, the contractor shall carry out the construction according to the project schedule and the drawings provided by Party A, and guarantee the project schedule requirements of the owner on page-1* * *.
2. The contractor shall submit the work completion and implementation progress of this week to Party A every week, and Party A shall analyze and confirm the feasibility and sign it.
3. If Party A's specific status or materials are not in place in time, the schedule cannot be implemented normally. Party A is responsible for influencing the progress of the project and extending the construction period. Party B shall not bear the responsibility and expenses for delaying the construction period. Contract term: commencement date: year month date of completion: subject to the progress of the project. Contracting method: this project is settled by the building materials and equipment in the weak current meter.
The new quantities not included in this contract shall be compiled by the contractor and the approved list of new projects, and shall enter the final accounts of the project according to the quantities after being approved by the owner.
If the contractor collects materials from the employer for installation, Party A shall be responsible for the safety of material storage.
Formal contract.
The amount is the budget price agreed by Party A and Party B (the total project cost is expected to be RMB ×××).
Yuan, Yuan in the end.
The specific price is subject to Party A's signature and final settlement. Time limit for a project This project shall be subject to the commencement report approved by both parties, and the contractor shall be subject to the normal time limit for a project of Party A..
The construction period shall be handed over within one month after the main body of the normal decoration of the construction party is finished.
In the following cases, it shall be postponed according to the actual construction period: during the construction period, if the work is stopped continuously for more than 72 hours due to reasons other than the contractor, and the raw materials are not in the warehouse, the construction period shall be postponed.
Force majeure events (war, unrest, falling of flying objects, flood, fire, explosion, wind, rain, snow, earthquake and other natural disasters for which neither party is responsible) occur.
The construction period is postponed due to too many changes of the owner (if it is too large, a new visa will be required, and additional fees will be charged).
The contractor shall report the delayed contents to Party A on the second day after the above situation occurs, and the representative of Party A shall confirm and give a written reply within the second day after receiving the report. If the construction period is delayed due to the rework of the contractor's construction quality problems, the contractor shall bear the corresponding responsibilities. The engineering quality and acceptance of the construction project shall be optimized by Party B according to Party A's basic drawings, and the construction can only be started after Party A has carefully confirmed and signed it. Acceptance standards shall conform to the national implementation quality standards for weak current systems. Engineering quality requirements:
(Party A shall conduct acceptance according to the design drawings, the contractor's as-built drawings, the completion report and other relevant materials) Finally, Party A shall submit a formal written document in quadruplicate and an electronic document ... the payment and settlement of the project funds. Advance payment: after signing this contract, pay Party B RMB 50,000, and cooperate sincerely. The contractor enters the construction site of Party A, familiarizes himself with and optimizes Party A's drawings, and makes good preparations for construction. Within 65,438+05 working days after Party B enters the site, Party A shall pay 20% of the estimated total contract price to the contractor as the project advance payment, namely RMB 2 yuan. After the project starts, Party B shall make a progress report at the end of each month, and Party A shall pay 70% of the progress payment before the 5th of the following month. After the advance payment is received, the contract will take effect. Page -3-Page * * * Page 7 Party B
Three. After the final payment of the project is accepted, Party A shall pay Party B the unpaid part of the total amount (excluding 5% quality guarantee money) within 15 days.
Four, the remaining 5% of the project balance as the project quality deposit. The remaining 2.5% of the project payment shall be paid by Party A without interest within 180 days after the handover of the project, and the remaining 2.5% of the project payment shall be paid by Party A without interest within 360 days.
Verb (abbreviation of verb) Handling of deferred work If the construction cannot be carried out for a long time due to Party A's site reasons, the contractor's personnel will be idle for a long time. Both parties shall negotiate the compensation plan separately (according to the current labor standards and actual accounting). Engineering protection 14. During the on-site construction, Party A and Party B must protect the facilities and equipment such as project installation. In case of any damage, the losing party shall be responsible for repairing and compensating.
15. Before the overall completion acceptance, if Party A urgently needs to use the completed part, it shall be deemed that Party A has accepted it after being signed by both parties, and Party A shall be responsible for the protection of finished products.
16. If Party A urgently needs to use it in advance before the comprehensive completion acceptance, it shall be deemed that the used single project has passed the acceptance. Responsibilities of both parties Party A's responsibilities:
Provide the original route plan or drawings of the project to ensure that the project can be carried out as scheduled.
Be responsible for coordinating and providing the contractor with electricity, water, material stacking, office space and other conditions on the construction site three days before the start of construction.
Send special representatives to supervise, identify, study and review the quality and progress of the project and put forward opinions.
Coordinate related work at any time. On page -4- * * 7, Party A is responsible for coordinating the cooperation of various construction units. The change of Party A's representative shall be notified to the contractor in writing three days in advance.
According to the agreed payment method, Party A shall pay the contractor in time. If the payment time exceeds the agreed payment time by 7 days, the contractor will not be responsible for the work stoppage caused by Party A's failure to pay the corresponding amount.
Responsible for the storage of materials and equipment on the construction site, as well as fire prevention, theft prevention and other safety work.
Party A shall send a staff member at each construction site to cooperate with the contractor's construction work, such as material collection.
Contractor's responsibilities:
According to the contract time limit for a project quality and quantity.
Do a good job of engineering interspersed and coordinated.
Provide Party A with detailed project plan and increase or decrease project budget in time.
Carry out the construction in strict accordance with the safety operation and Party A's relevant safety regulations. In case of violation of safety operation and Party A's relevant safety regulations, all accidents (including personal injury and property loss) shall be borne by Party B, which has nothing to do with Party A. ..
After the acceptance of the project, the contractor must complete the training of various systems involved in the weak current project, and promise to train property management personnel to users free of charge.
On-site management personnel should obey the unified command and management of the owner and attend various on-site meetings on time. Service and guarantee. After the system is accepted, during the warranty period (one year), Party B will provide free maintenance for the quality problems in the system operation (maintenance or replacement of equipment spare parts due to improper operation by users, etc.). ), Party B only charges for the equipment.
(2) After the warranty period expires, Party B can provide lifelong repair and maintenance for the system, and only charge the equipment fee and basic travel expenses.
Three. After-sales service mode Party B will provide Party A with free consulting service and online technical consulting service. Provide Party A with 24-hour response service or on-site service. Page -5-Page ***7 Liability for breach of contract and dispute settlement. From the effective date of this contract, both parties must fully perform their obligations stipulated in the contract, and neither party may change or terminate the contract without authorization.
If both parties fail to perform or fully perform this contract due to the responsibility of one party, the responsible party shall bear the responsibility and pay liquidated damages or compensation to the observant party according to the relevant provisions of People's Republic of China (PRC) Contract Law. The contract is valid for thirty-five or thirty-six years. This contract shall come into effect after being signed and sealed by both parties, and shall be invalid after all the projects are accepted and passed one month.
This contract is made in quadruplicate, two for the Employer and two for the Contractor. Matters not covered in this contract shall be settled by both parties through consultation in accordance with the Contract Law of People's Republic of China (PRC). Employer:
(Seal) Signature of representative:
Signing place:
Month day contractor:
(Seal) Signature of representative:
Date, year and month
- Related articles
- How to write the abbreviation of resignation report?
- How much is the average monthly salary for a pastry chef?
- Near Dandong Super 8 Hotel
- Which Dandong seafood hotel is delicious?
- Where is the wholesale market of Linyi Furniture City?
- Coordinates of Nalan Hotel in Warcraft
- Five graduation defense speeches
- It is difficult to enter public primary schools in Shenzhen. How to solve it?
- What time does Sky City Hotel in Xiaojin County open?
- How about Hangzhou Herman Clothing Co., Ltd.?