Traditional Culture Encyclopedia - Hotel reservation - Price and quotation of hydropower transformation

Price and quotation of hydropower transformation

The expenditure of fiddling with water and electricity is mainly determined according to the situation reserved by developers and the needs of owners, so the detailed budget should be based on the actual situation.

Calculated by meter

Generally, the price of hydropower transformation is calculated by the number of meters, and it can also be determined by the number of laps used and the number of meters traveled. The price of water and electricity ranges from several thousand yuan to ten thousand yuan.

According to the actual use.

The water and electricity quotation of the decoration company is calculated according to the actual usage, and it is calculated by meters. Generally, the surface-mounted waterway is about every square meter in 40 yuan, and the concealed waterway is about every meter in 50 yuan. The circuit wiring is about every meter in 20 yuan, and the concealed waterway is about 25 original pipes 16. This quotation is labor and materials. The situation in each city is different, and the brands of materials used are different and different.

Double packaging and single packaging

Volkswagen's hydropower transformation algorithm is: how many square houses x materials per square meter. This is a double bag. There is no single package of materials. The price comes from the internet and is for reference only.