How long is the general construction period for hotel decoration?

Hotel decoration customers generally have tight requirements on the construction period, because they start to pay rent when renting shops. A few days in advance is to help customers save their budget, and some sales seasons can't be missed. According to the actual situation of each project, it is as short as 20 days and as long as 3 months. There are many influencing factors, which are summarized as follows:

1. Does it involve large-scale structural changes? The more structural changes, the longer the construction period. For example, whether to build a two-story building with steel structure or to pour stairs with concrete requires sufficient maintenance time.

2. Can the construction be carried out only at night? Many public spaces are not allowed to be constructed during the day, so it is necessary to arrange some quiet construction during the day and work overtime at night to do loud work such as slotting. Construction at night will inevitably reduce the work efficiency of workers and increase the construction period.

3, property factors, the construction site needs property approval, and the approval progress is also one of the factors that affect the construction period.

4. In order to save time, there should be strict and effective engineering organization arrangement, and all work should go hand in hand. All materials should be prepared at least before various processes. Showcase, bar, chair, etc. What can be processed outside can be processed outside, and the finished product can be customized. This is a coordinated and balanced process to prevent a slowdown.

5, site management benefits, workers' supervision and management, rigorous procrastination and laziness, site planning and layout, the distance between materials and construction, and so on.

6, the complexity of the process, whether the carving of artificial patterns is complicated, and whether the modeling of the ceiling requires a lot of man-hours.

7. Whether the design scheme is confirmed in time and how much the medium-term scheme has changed.

8. Due to the weather, especially in hot summer, the work efficiency of workers is reduced because there is no air conditioner installed on the construction site.

9. The size of the area is not completely proportional to the construction period. Although the sparrow is small and complete, it needs various crafts in a small area. As long as all processes are coordinated in a large area, the total construction period can be appropriately compressed.