Traditional Culture Encyclopedia - Hotel reservation - Cost of building a 15-story hotel in 2000

Cost of building a 15-story hotel in 2000

The cost of a four-star hotel is about 8000 yuan /m'.

Due to regional differences, generally speaking, the preparation cost of four-and five-star hotels is controlled at around 8000 yuan /m', or lower than this figure. Of course, there are also hotels that imitate the design of some countries in the Middle East, and the cost is definitely much higher than 8000 yuan /m'. The rest is the quantity we need.

Name of subdivisional work:

1. The capital construction part is 2 100-2300, calculated at the unilateral cost (RMB/m2).

1: The total construction area of pile foundation engineering (stressed pile) is120-180;

2. Basement engineering, foundation pit enclosure and supporting basement construction area of 2000-2400;

3. Black construction projects with a construction area of 750-900 (except for the glass curtain wall of the external wall);

4. The facade construction area of the external glass curtain wall is 800-1200;

5. The above-ground construction area of structural engineering is 1000- 1200.

Second, the installation and decoration engineering:

6. Water supply and drainage (including sanitary ware and boiler room pipes) with a total construction area of 370-400;

7: The total construction area of spraying and gas fire fighting is110-120;

8. Total construction area of sewage treatment (including pipelines) 40-45;

9. The above-ground construction area of air conditioning project is 600-660;

10: basement ventilation project basement construction area190-210;

Hotel feasibility analysis report, look at the case first, then talk about the price.

1 1: The total construction area of lighting, lightning protection, power, power transformation and distribution is 500-600;

12 telephone switchboard and wiring, closed-circuit television, monitoring, broadcast audio, management computer, fire alarm, antenna and telegraph;

The total construction area of telex is 350-450 (flexibility and space are controlled by the chief decision maker);

13: the total construction area of gas engineering is 50-55;

14: the total construction area of elevators and escalators is 360-400;

15: the total outdoor construction area is120-135;

16: indoor decoration with furniture, area1500-2000;

17: total construction area of miscellaneous works is 300-350;

18: the above-ground building area of laundry equipment is170-190;

19: kitchen equipment covers an area of 280-310;