Safe and civilized construction management of hotel fine decoration project?
Purpose
To guide the comprehensive management of safety and civilization at the construction site. Make every effort to contain and prevent fatal accidents, eliminate vicious accidents and nip them in the bud. Purify the on-site environment, create a safe, civilized and environmentally friendly construction site, meet municipal green construction site standards, and strive to become a provincial green construction site.
Scope of application
Applicable to safe and civilized construction management throughout the entire process of hotel fine decoration project construction.
1. Safety management
1.1 Safety production responsibility system
1.1.1 The construction unit should establish a safety responsibility system, and all departments should strictly comply with it.
1.1.2 The subcontracting economic contracts of projects and teams should have clear production safety indicators and penalty measures.
1.1.3 Develop safety technical operating procedures for each type of work and hang them in the processing plants and main work areas of each type of work.
1.1.4 Establish a production safety guarantee system and strengthen the management of production safety. Establish a full-time safety officer to be specifically responsible for safe production.
1.1.5 Conduct regular safety accountability assessments for managers.
1.1.6 Firmly establish the principle and policy of "safety first, prevention first", and effectively carry out construction safety publicity, education, layout, inspection, rectification and evaluation, and achieve three no harms, Adhere to safety duty, whoever is responsible for construction is responsible for safety.
1.1.7 The company’s safety leading group is responsible for formulating safety rules and regulations. The safety department of the company’s engineering department is responsible for arranging and inspecting safety work; the project manager is the person responsible for safety work; the engineer is responsible for incorporating fire protection work into the construction organization design; Construction workers are responsible for carrying out construction in accordance with the approved fire protection design; safety supervisors are responsible for daily professional safety inspections of the project.
1.1.8 Construction operations of construction projects must be carried out in strict accordance with the requirements of fire protection technical specifications reviewed and approved by the state and fire protection authorities. The construction organization design must have targeted fire protection technical measures and be counter-signed by the relevant responsible departments.
1.2 Objective Management
1.2.1 Establish safety management objectives (casualty control indicators and safety standards, civilized construction objectives).
1.2.2 Break down the safety responsibility objectives and implement them to each team and worker.
1.2.3 Establish detailed rules for the assessment system of responsibility objectives, and conduct regular assessments according to the assessment system.
1.2.4 Before the start of the project, the company must sign the "Safe and Civilized Construction Responsibility Letter" with the project manager to clarify the project manager's fire safety responsibilities; the project manager, subcontracting units and construction teams must sign the "Construction Responsibility Letter" "Subcontracting Agreement" must also be signed "Responsibility Letter for Safe and Civilized Construction" to clarify the person responsible for fire safety step by step and decompose fire safety responsibilities layer by layer.
1.3 Construction organization design
1.3.1 Construction safety measures should be formulated in the construction organization design and strictly followed.
1.3.2 The construction organization design should be submitted to the supervision and construction unit for approval before the start of construction.
1.3.3 Individual safety technical plans should be prepared for special projects such as deep foundation pits, formwork and support removal.
1.3.4 Safety technical measures should be implemented in all construction processes, and strive to be refined, comprehensive and specific to truly prevent accidents.
1.3.5 Safety technical measures should be targeted. The compiler must understand the actual situation of the project overview, construction methods, surrounding environment and conditions of the site, and be familiar with safety regulations and standards.
1.3.6 The technical person in charge should explain the safety technical measures to the project manager, construction workers, team leaders and workers step by step. Various safety facilities and protective settings should be included in the task list, responsibilities should be assigned to teams and individuals, and an acceptance system should be implemented.
1.3.7 Based on seasonal characteristics and fire prevention requirements at different stages during the construction process, the construction project department should formulate and implement corresponding fire prevention plans and safety measures.
1.4 Division (sub-item) project safety technical disclosure
1.4.1 Targeted at the project division (sub-item) position, provide written safety information to the team and individuals Tell the truth.
1.4.2 Security technical disclosures must be signed.
1.5 Safety Inspection
1.5.1 The construction unit should establish a semi-monthly safety inspection system.
1.5.2 Inspection records are the basis for safety evaluation, so inspection records should be detailed and serious. In particular, records of hidden dangers must be specific, such as the location of the hidden danger, the degree of danger and treatment opinions.
1.5.3 The rectification of hidden accident hazards should be implemented by people, and there should be clear rectification measures and rectification time limits.
1.5.4 For major accident hazard rectification orders, dedicated personnel should be assigned to implement them and complete them by the required date.
1.5.5 On-site mechanical and electrical maintenance personnel should always check whether the equipment's leakage protection is intact and effective.
1.5.6 There are many electrical appliances on site, and wires must not be dragged or pulled randomly. When transporting and stacking materials, be sure to protect the wires to prevent them from being hit or damaged, causing the wire sheath to break and peel off. Once a wire core is exposed or the wire sheath is damaged, repair it in time. If there are two or more damaged wires, the entire wire must be replaced. .
1.5.7 During the rainy season, rainproofing and grounding inspections of electrical equipment should be strengthened to prevent leakage accidents.
For more information about engineering/service/purchasing tender document writing and production to improve the bid winning rate, you can click on the official website customer service at the bottom for free consultation: /#/?source=bdzd
- Previous article:The furnishings of "elegant house" should only be described as simple, but they should be swept and swept to prevent any dust. I'm not a dignitary, so no photos of the famous public figures are allowe
- Next article:Who can introduce me to some wealthy businessmen in China who have made a fortune abroad? ..
- Related articles
- How to invest in cyclical, defensive and growth stocks
- How can fancy copywriting empower variety shows?
- Complete works of hotel marketing and promotion activities
- What's delicious in Xingcheng Ancient City?
- Common problems in hotel linen washing
- Urban folk imitation composition
- Brief introduction of Huanghua No.3 Middle School
- How to choose a place to live when traveling to Lijiang?
- Xi 'an's friend asks for help! ! ! Urgent! ! !
- How many kilometers is it from Xiaxian Shuitou Expressway to Gaoping City?