Traditional Culture Encyclopedia - Hotel reservation - Conditions for handling hotel construction permit

Conditions for handling hotel construction permit

Legal analysis: 1. The formalities for examination and approval of the land for this construction project have been completed, and the house decoration project shall obtain the consent of the owner of the house. 2. A planning permit has been obtained. 3, the need for expropriation, demolition, construction schedule requirements. 4. The construction enterprise has confirmed that the construction contract has been signed. 5. There are construction drawings and technical data that meet the construction needs, and the construction drawing design documents have been reviewed as required.

Legal basis: Article 8 of the Building Law of People's Republic of China (PRC) shall meet the following conditions when applying for a construction permit: (1) The approval procedures for land use for construction projects have been completed; (two) the construction project in the urban planning area has obtained the planning permit; (3) If demolition is required, the demolition progress shall meet the construction requirements; (4) The construction enterprise has determined; (5) There are construction drawings and technical data that meet the construction needs; (six) there are specific measures to ensure the quality and safety of the project; (7) construction.