Traditional Culture Encyclopedia - Hotel reservation - How to write the ecological supervision log of rodent control
How to write the ecological supervision log of rodent control
1. Time, place and climate record.
2. Supervisors at all levels who participate in project supervision shall form supervision diaries, including supervisors, testers, supervision engineers, deputy directors, directors and other supervisors.
3. Every supervisor's supervision diary should be written, and truthfully fill in the contents related to project supervision in his post work.
4. The contents of the supervision diary should reflect the supervision process of the supervised project concisely and accurately as far as possible, especially the key links and working procedures must be clearly recorded to ensure convenient, fast and comprehensive access.
5, supervision diary shall not be filled in by several supervisors * * *, and each supervisor shall fill in all his behaviors and relevant supervision activities in the process of project supervision. When several supervisors * * * supervise a project, they shall not fill in a diary or cross it.
6. The supervision diary must truthfully record the daily supervision process according to the provisions; The handwriting is neat and clear, and shall not be altered; Blue-black or carbon ink pen shall be used for writing, and other ink writing or computer printing shall not be used; Records should be filled in continuously, and blank lines, paragraphs and pages are not allowed; The contents that need to be supplemented should be noted, and the places where problems are recorded should be highlighted and closed. When you ask for leave because of something, you should indicate the time of leave and the handover of supervision personnel.
7. The contents recorded in the supervision diary should be detailed and appropriate, highlight key points, and focus on the contents related to the formation of project quality to ensure the traceability of project quality. Content irrelevant to the project construction and quality formation shall not be written in it.
8. It is important to record the inspection, patrol, standing by and other processes and specific contents related to your participation in the formation process of engineering quality, and other contents are detailed properly.
9. The supervision diary should be written in narrative form to fill in the daily supervision work, and the summary report and argumentative paper are not allowed. The description of each process or thing in the supervision diary should reflect the time, place, people, process, conclusion and other elements.
1. Describe the basic situation of this project separately on the home page. It mainly includes design summary, main construction leaders, technical leaders, quality inspectors, commencement and completion dates.
11. truthfully record the whole process of project formation according to the construction sequence.
12. The problems raised or found in the supervision diary must be recorded for correction and verification, so that the problems can be closed. It is forbidden to record only the problems without correction and verification records.
13. Supervisors should fill in the supervision diary in time and sign it.
- Previous article:Holiday Inn Sanya Beautiful Time Check-in Guide
- Next article:How to get to Jinwan Square from Home Inn (Tianjin West Railway Station)
- Related articles
- How far is it from City Convenience Hotel Shenzhen Longhua District to Huanggang Port?
- Tickets from Chongqing to Fengdu are very expensive.
- What aspects does service awareness include?
- How about Jin Xin Hotel in Chaozhou?
- How is Shenyang Huanggu District 97 Middle School? Hotels near
- The lover's harbor in Sydney Bay.
- How many Dongsheng buffets are there in Shanghai?
- Room facilities at Shenyang Dynasty Marriott
- How to get to Geyuan from the west gate of Slender West Lake in Yangzhou Hanting Hotel?
- What is the future prospect of studying interior design now?