1, the first thing to consider is what steps the hotel decoration should go through, so as to determine when the hotel decoration expenses will be collected and what are the main expenses? General hotel design and decoration will go through consultation, room measurement, design scheme, design renderings, fire protection drawings, construction drawings, commencement, construction and acceptance.

2. The design fee is a relatively large part of the hotel decoration. The collection of the design fee requires the designer to communicate with the hotel operator when designing the floor plan, reach an agreement on the design drawings, and both parties sign for confirmation. At this time, you need to pay part of the design fee, and the rest of the design fee will be settled when the design drawings are completed.

3. The cost of other design drawings is also a part to be considered. The necessary fire protection drawings are reported to the fire brigade before the hotel starts construction, so the cost of fire protection drawings belongs to the part that needs to be paid in the early stage.

4. Material cost is another major part of hotel decoration, and there are many kinds of materials. Some public equipment companies divide the proportion of materials in decoration into main materials and auxiliary materials. The scope of main materials and auxiliary materials is not clearly defined and needs to be compared by hotel operators themselves. With different grades of materials, the price difference between brand material suppliers and other material suppliers is obvious. The amount of hotel materials is relatively large, and the price difference of one dollar will be far away in the end, so the material cost needs to be carefully considered, but it is controllable.

5. Labor cost is another controllable part of hotel decoration. What procedures does a hotel need to decorate? What kind of workers are needed? How many people do you need for each job? How long does the construction period take? These can be a basic plan and forecast. Through such a consideration, we can calculate the approximate labor cost.