This year has passed quickly, and new employees should learn a lot in this year's work. The following is a summary of the new year's work in architecture compiled by me, for your reference only. Welcome to reading.

Annual Work Summary (1): New employees in the construction category have been employed for one year. For me, it is not so much a year's work experience as a month's work experience. Regarding this summary, I don't want to write it in too many gorgeous languages, which makes people feel too vain and unrealistic. I just want to express my feelings and thoughts in the simplest sentences.

When I first came to the company, everything was so unknown. When I see a strange face, I'm really a little nervous. I don't know what temperament everyone is, and it's not easy to get along with, but this feeling soon disappears. Everyone's similar age, warm and cheerful personality and harmonious working atmosphere soon infected me and made me happily devote myself to my work.

In a new environment, it means that the working mode is different from before, and the content of the work is also very different. I think what a good employee should do is to abandon the inherent working mode and devote himself to a new job as soon as possible.

My new job is really "new" to me, and I have done something that I have never touched before. You can't say you don't know anything, but you know a little at most. Because the construction industry is an industry that I have never touched from entering the school gate to stepping out of the school gate, and the operation inside is unheard of. I didn't know many terms until I came here. Thanks to the careful guidance of my colleagues and leaders, I got into my work bit by bit, otherwise I really felt like a headless fly, flying around and bumping around, which would inevitably lead to many detours.

Since there are too many things you don't understand, you should concentrate and work harder than others. As the saying goes, a good memory is not as good as bad writing. I write down the work that needs to be done at each step, so that there will be no mistakes in the same work. I will make overall arrangements for my daily work in advance, so that the work can be carried out in an orderly manner.

Although the work has just begun, I have a lot of things to do. The development of the company requires the joint efforts of all our staff to enrich and improve the company's operating model and management mechanism.

First of all, what I need to do is to establish the company's personnel files, establish the roster of personnel structure, formulate relevant systems, reasonably avoid the risk of employing people, and gradually improve some imperfect rules and regulations of the company.

Secondly, with the deepening of my work, I will give full play to my expertise in human resources and help leaders share some recruitment work, including releasing recruitment information, making an appointment for interviews and other pre-recruitment work, so that leaders will not worry about these small things. I will gradually draw up a quarterly or annual recruitment plan, summarize the talents that are urgently needed and needed by various departments, and use the existing resources to release recruitment information and carry out recruitment work.

Thirdly, using the existing resources, please ask the heads of various departments to cooperate, gradually establish the job descriptions of everyone in each department, clarify their respective division of labor, decompose the work item by item and implement it to everyone, and gradually get rid of the situation that everyone does a job, but no one is proficient, so that the work forms modules and everyone is responsible for their own modules, so that there will be no messy work, lack of processes and no one is responsible.

These are my feelings and understandings since this year. In the future work, I will work harder to improve my work and show my value more perfectly.

Annual work summary (2), a newcomer to architecture, who graduated almost a year ago. This year has changed me from an ignorant student to a social youth. I have experienced too much this year and accepted too many things from this society. This transformation of social roles has made me really understand the truth of life. Fancy life, Fancy life, different social roles and different lifestyles are all mentioned in the book. This year's work experience is also a preliminary understanding of the society for one year. I have thought too much this year. I have made clear my personal life style and my role in society.

The change of thinking mode, from passive to active. At school or under the protection of parents, life is carefree, everything is simple and responsible under the supervision of others, and there is no right or wrong. When you enter the society, you should be responsible for everything you do. If you do it right, no one will pay attention to you and no one will praise you. If you do something wrong, a large group of people will accuse you or add your responsibilities, but you can't bear huge social responsibilities yourself. Therefore, you should try to do everything yourself to get rid of this huge responsibility, which requires individuals to take the initiative to do everything.

With the change of personality cultivation, students are always self-centered, and the students themselves are the protagonists, arguing endlessly about any personal trifles, even blushing and heartbeat. When you enter the society, you are faced with social people. As the saying goes, society is sinister and social people are unfathomable. Everything you say and do has to be thought and deliberated by your brain. This requires you to move forward step by step. You have to be careful and wait patiently. Don't go when you should, or even wait a long time. The society is vast. Don't let it drown you, and neither should you. You should take the initiative to contact the society, in which communication has become the only way. In the past, silence has become the talk of Kan Kan, so you should actively contact and communicate with people in the society.

Life and career planning, I still remember the new job training. The general manager of the company introduced the development of Chuan 'an, especially put forward the road to success. It says, "Go deep into the grassroots to learn skills, master technology and management in theory and practice, sublimate skills and management to control operations, transfer theory, combine practice and work hard for three years." It generally points out the career development path of xx, including new employees, leaders and helm. As the saying goes, soldiers who don't want to be generals are not good soldiers. Of course, young people who have just left the society want to have a good future and be the helmsman, but after all, they are a minority, and most of them have chosen different career paths. However, my career planning is not too long-term, and I have never made a long-term plan. As far as the current form and situation are concerned, we should study skills well, exercise our will, integrate theory with practice, master management, exercise for several years, really enrich ourselves, arm ourselves and do a good job in the future.

Life practice and party spirit cultivation, leaving school, leaving parents, truly living independently, without the concern of parents, classmates and teachers, experiencing and practicing society personally. Learn how to live, how to manage money, how to be worldly and how to build a family. I always keep in mind party member's identity, constantly study the Party's basic theory, understand current affairs and politics, keep in mind the Party's purpose, constantly strive to strengthen the cultivation of party spirit, actively take the lead in my work, and serve my colleagues wholeheartedly in my life. Restrain and standardize yourself in strict accordance with party member's requirements, and strive to be an excellent party member.

A year's work has a profound experience. Great changes have taken place not only in my thoughts, but also in my personal abilities. I learned a lot by integrating theory with practice. Next, I will make a detailed summary of my work during the probation period.

Learning new theory, learning locksmith theory, locksmith is an indispensable type of work in mechanical processing and manufacturing industry. Machining mechanical parts by sawing, drilling, filing and grinding is often used for modification of mechanical parts and installation of mechanical equipment.

The fitter of the installation company not only processes and manufactures mechanical parts, but also installs equipment. This is the so-called fitter, and the fitter theory is simple and clear. Fitter belongs to architecture, and most drawings involve architectural symbols, which is different from mechanical drawing. This requires constant learning and constant consultation. Asking for advice from others is not a particularly easy task, and most of them need self-study and summary.

Research on practical technology and measuring tools. Theodolite is an instrument for measuring horizontal and vertical angular orientation, and theodolite is the main angle measuring instrument in measurement. It consists of a telescope, a horizontal dial, a vertical dial, a level and a base. When measuring, put the theodolite on a tripod, aim the center of the instrument at the ground station with a vertical ball or an optical collimator, and measure the horizontal and vertical angles with the horizontal and vertical dials of a level meter. According to the accuracy, it is divided into precision theodolite and ordinary theodolite; According to the reading equipment can be divided into optical theodolite and vernier theodolite; According to the shafting structure, it can be divided into retest theodolite and direction theodolite. In addition, there is a coded dial theodolite, which can automatically record dial readings according to coded perforations; An automatic tracking theodolite that can continuously and automatically aim at air targets; Gyro theodolite and laser theodolite that can determine the orientation of ground points quickly and independently by using gyro orientation principle; Universal theodolite for astronomical observation with three functions: theodolite, meridian instrument and zenith instrument; Phototheodolite, who combined the camera and theodolite for ground photogrammetry. In the construction industry, it is mainly used for setting out the building foundation and equipment foundation. Accurately locate and test the installation equipment. Level is an instrument for measuring the height difference between two points on the ground according to the principle of leveling. According to the structure, it is divided into micro-tilt level, automatic level, laser level and digital level (also known as electronic level). According to the accuracy, it is divided into precision level and ordinary level. Micro-tilt level is widely used in installation work. A common level is used and a horizontal line of sight is obtained with the help of micro-tilt screws. During operation, the instrument is roughly leveled with a circular level, and then before each reading, the level is tilted in the vertical plane with the help of slightly tilted screws until the level bubble is accurately centered and the line of sight is horizontal. Compared with the ordinary level, the micro-tilt precision level has the following advantages: the pipe level has small graduation value, high sensitivity, large telescope magnification and strong brightness, and the instrument structure is firm, especially the telescope is firmly connected with the pipe level, equipped with an optical micrometer and a precision level ruler, which improves the reading accuracy. The micro-tilt precision level produced in China has a telescope magnification of 40 times, a tube leveling index of 10 ″/2mm, and a minimum reading of an optical micrometer of x mm The scope, tube leveling and optical micrometer of the telescope are all installed in a heat shield. The study and use of theodolite and level greatly improve their own ability, which is also a necessary skill for fitter installation.

The installation of production line, with the basic understanding and necessary skills of installation, also needs to know the system of production line. The production line is an integrated system, including equipment, electricity, piping, heating, ventilation and control. The installation starts from the embedded foundation, and the equipment is connected by welding. The equipment foundation should be flat, with uniform height and no settlement. The preliminary work is to make the foundation slab, then cooperate with civil engineering to embed the foundation slab, and then clean the foundation, pay-off the equipment foundation and install the equipment. Electrical engineering is to embed cable pipes, make electrical bridge, connect equipment, debug and lay cables. The single work of pipeline is the configuration of pipeline, including the manufacture of support, the transportation of pipeline, and the pairing connection of water pipe, gas pipe, oil pipe and material pipe. HVAC processes the air in the production line space, including the manufacture of air ducts, the manufacture of supports, the installation of air ducts, the insulation of air ducts, and the installation of air conditioners and fans. Platform manufacturing includes the processing, manufacturing and installation of platforms, guardrails and stairs of various sizes. Paint shall be used for rust prevention and purification of all supports and platforms. Of course, all the expensive equipment on the transportation and hoisting production line needs professional lifting equipment. The installation of production line is a complicated work, and every link must be in place. Any small mistake will affect the performance of the whole production line.

As a fitter, the basic principles and steps of equipment installation. The installation of equipment is to locate and connect the space-based equipment, as well as the cooperative connection between the equipment. Pay-off: Pay-off basic checkpoints in horizontal and vertical directions of plane with theodolite, which requires high accuracy and should be checked and accepted repeatedly after being put away. Setting out with a level at the same height as the reference point of elevation measurement requires high accuracy and needs to be checked and accepted. Initial positioning of equipment: roughly set out the equipment according to the drawings through checkpoints, determine the approximate position of the equipment, test the equipment with measuring instruments, and adjust the position of the equipment to achieve the required accuracy. Different connection methods and different connection processes will have different effects on the equipment. The installation method and experience of the equipment are slowly learned in the actual installation process, and finally the equipment is cleaned.

Management learning, no matter what team, will not exist for a long time without proper and accurate management. Management is a strong coordinator. Through management, everything in the process can be arranged and the work can be carried out in an orderly manner. Effective management will greatly improve efficiency and benefits, often with half the effort, and vice versa. Management includes the arrangement of work construction, the management of people and things, and the management of each object will affect the smooth progress of the work. As a manager, you must have strong work experience, coordination ability, communication ability and imagination. These abilities are gradually acquired in practice, and only through continuous practice and summary can effective management schemes and measures be formed.

Annual work summary (3) A new employee in construction, who graduated from xx school in 20xx, worked as a technician in xx construction company in X city in the same year and was assigned to the site of X factory of xx company for internship. Because this project is an expansion site, there are many unit projects, and the construction is also difficult. The key points are two aspects: first, the axis accuracy between the projects of each unit is particularly high. First, because the projects of each unit are connected by conveyor belts, the requirements for equipment placement are high; Second, the embedded parts have large volume, high precision requirements, and it is difficult to control the axis and elevation precision. In view of the above technical problems, we made progress despite difficulties, adopted several different measurement schemes, and finally selected the best scheme as the final measurement result after repeated evaluation; We have also accumulated experience in embedding embedded parts. First of all, it is necessary to locate the embedded parts, and the deviation should be controlled within xmm. Secondly, the embedded parts should be repositioned when the shrinkage of concrete is relatively stable, so as to ensure that the deviation is controlled within xmm, and the maximum deviation does not exceed xmm, so as to avoid many unnecessary troubles for future equipment installation. Through continuous efforts and accumulated experience, my efforts have been affirmed and appreciated by the company leaders.

Independent construction began in 20xx, and the whole unit project was controlled from three aspects: project quality, progress and data. I presided over and participated in some projects of X factory, which was one of the key projects of X at that time, and fought side by side with the technical backbone known as the "Five Construction Projects of X Province" at that time in the construction line. Engineering quality: firstly, ensure the quality of raw materials and the integrity of collected data from three aspects: the certificate of raw materials, the retest report and the appearance quality, so as to avoid unnecessary trouble to the submission of engineering data when the project is completed; Secondly, the control of construction quality, who is responsible for the construction and who is responsible for the acceptance, who is responsible for the acceptance of the day, seven days of small evaluation, a month of big evaluation; At the same time, pay special attention to the handover and acceptance between the team and the employees. Whoever fails the construction quality inspection will bear the corresponding responsibilities; In addition, special attention should be paid to the protection of finished products, which not only saves the labor force of the team, but also saves the raw materials of the project, avoids unnecessary rework and material waste, and also improves the visual quality.

In terms of project progress: firstly, there must be a good and feasible schedule and feasible construction site layout, and a clear target schedule will play a guiding role in the implementation of the overall schedule; With practical site layout, enough raw materials can be placed and the cost of secondary handling of materials can be saved; Secondly, the personnel are arranged in rows, and the team leader and employees are old workers who have followed the project for a long time, so that the project quality is relatively stable, the safety awareness is strong, and it is easy to manage; In addition, it is necessary to do a good job in logistics and provide a warm family life for employees, which is conducive to unity, and can also give full play to the enthusiasm and operational skills of employees, and finally ensure the quality of the project and complete the construction tasks on time and in good quantity; Engineering data: first of all, all the original engineering technical data in the construction process should be collected. In the middle of the project acceptance or before completion, should also be comprehensive information. As the general contractor, we should collect all the technical data of all subcontractors, and ensure that all the materials entering the site in batches are qualified and all the test blocks (pieces) are qualified. At the same time, the construction must be carried out in strict accordance with the specifications. Data must be understood by others, and the quality of data is directly related to the project.

Since 20xx, I have been transferred to work in X District. At that time, the overall construction of project X and the project management developed in the direction of high, large and difficult. At the same time, many new materials are used, and there are many managers, and the quality requirements are higher and stricter. We should ensure safety first and put safety work in the first place in construction. First of all, we must solve the problems of height, size and construction difficulty. Height: first of all, ensure the verticality of the project; Second, we must ensure the height of the project. Height brings certain technical requirements to pay-off. The plane setting-out generally adopts the method of hanging lines in reserved holes in the floor and plumb instrument, or simultaneously plays vertical lines at the four corners of the building. This has two advantages: first, it can check the accuracy of the inner hanging line, and second, it can check the verticality of the outer wall. As long as the work is done well, the verticality of the external wall structure can be controlled within xmm, and the deviation of the floating layer can be controlled within xmm. The plane control points adopt the method of double control points, one as the guide point and the other as the check point, so as to avoid human error. Big: One is to refine the division of labor, and the other is to strengthen the coordination and unity between managers and teams, which requires managers to have high quality, comprehensive knowledge and strong coordination ability to ensure the smooth completion of the project. Difficulties: first, we must analyze in advance, and second, we must tackle key problems. The key technical problem is to find problems, solve problems and overcome common quality problems by using "xx" method. For the application of new materials and new processes, we can use the model room and model layer to accumulate experience and avoid decision-making mistakes. Safety should be grasped from three aspects: first, according to the actual situation of this project, specific safety operation procedures should be listed and safety measures should be formulated. Before the project starts, the safety construction scheme of various special projects shall be prepared and submitted to the company and Party A for approval. Second, a sufficient number of qualified safety management personnel should be equipped, and each team leader must be equipped with part-time safety officers to supervise the daily construction safety production of the team, and solve the safety hazards in time when they are found, so as to strive to nip safety accidents in the bud. The third is to improve the safety awareness of the project manager and the self-safety protection awareness of all production workers, so that the whole construction site can truly achieve: safety first, peace is a blessing.

In 20xx, I worked as a builder and project manager in the first project management department of X Group and X Company. Under his direct leadership and management, our project team overcame all kinds of difficulties and successfully completed the construction task of assembling and installing the large-scale cast-in-place column beam structure and prefabricated large-scale trough plate in the storage center. Model essay on work summary of building technicians

In 20xx, I worked as a budget officer in X Group and X Agency of X Company. This website is an expansion project of a foreign-funded enterprise. The first time I dealt with foreigners, I really realized how important the contract was. The communication between the two parties is directly related to the claim and visa of the project. The general contractor of this project is Company X: Company X has many subcontractors, so coordination among subcontractors is very important. Especially in the eyes of foreigners, safety is irreplaceable by anyone. At any time, safety should be subordinated to safety first. This is a small problem in the eyes of China people, but it can be regarded as a catastrophe in the eyes of foreigners. Under such strict management, I gradually learned to adapt to this set of management of foreigners, and I was able to work well in the construction, working closely with the general contractor and successfully completing the construction task.

At the end of 20xx, with the continuous improvement of the business volume of the group company, a group of like-minded colleagues and I have traveled thousands of miles and worked tirelessly. Since X Group Company was transferred to the X Project Department, we have successively completed the construction task of X Garden xx Project ***x million square meters; Among them, Phase X and Phase X won the excellent model project of X province respectively. In addition, with my active participation and efforts, many projects such as Project X and the commercial and residential building in the first bid section of xx won the bid at the price of X million yuan, which made a little contribution to our company's foothold in Guangdong, broadening the construction market and expanding corporate visibility.

After years of construction site management, I have increased my knowledge, broadened my horizons, summed up a lot of site construction experience, and learned advanced management experience and construction technology. The theoretical knowledge in the book and the practical experience on the spot have reached a perfect combination. At the same time, with the continuous improvement of building construction level, we are required to keep up with the situation in our future work, be more careful in our work, learn new technologies well, meet new challenges, and firmly establish the new architectural concept of quality first and owner (user) first.

20xx is a leap and sublimation year for me. With the care and support of the company leaders and the project department, I shoulder the heavy responsibility of the deputy project manager of the X bid section, and feel a great responsibility. I will devote myself to project management with great enthusiasm, pragmatic attitude and rigorous work style, and make unremitting efforts for the further embodiment and sublimation of brand Zhongtian and Centennial xx in xx.