Traditional Culture Encyclopedia - Photography major - On August 9, exit C of Liangqingqiao South Station of Nanning Metro Line 4 was temporarily closed.
On August 9, exit C of Liangqingqiao South Station of Nanning Metro Line 4 was temporarily closed.
Note that due to the recent construction progress of Nanning Rail Royal Seal Junlinwan Project, which is under the responsibility of Nanning Rail Real Estate Group Co., Ltd., it is necessary to upgrade the entrance and exit C of Liangqingqiao South Station on Line 4.
According to the needs of construction safety, the exit C of Liangqing Bridge South Station of Nanning Rail Transit Line 4 will be temporarily closed at that time, and the expected closing time is 2021August 9-1/October 3 1. Passengers who need to take the Nanning subway during the closing period can enter and leave the station from other entrances and exits.
Tips:
The specific opening time of the port is subject to the actual construction progress on site. In addition, Bian Xiao said earlier that the underground space project from Guangxi University Station to Guangxi University of Finance and Economics (Guang Cai Section) of Nanning Rail Transit Line 5 occupies about 800 meters of the main lane of Ming Xiu West Road (Torch 1 to Nantie 2 Street) for construction. How long is the construction closed? How to get around it? Let's get to know each other!
The construction period is from June 29th, 20021year to March 29th, 2022, and the construction period is 9 months.
Schematic diagram of traffic diversion in construction area
Traffic access roads are set on both sides of the construction area, with a width of about 5.75 meters, and 1 motor vehicle lanes and 1 non-motor vehicle lanes are set.
During the construction period, the right-turn ramp from Ming Xiu Road to Guangxi University will be opened at the intersection of Ming Xiu University to reduce the traffic around Torch Road, and traffic lights will be added at the intersection of Torch Road and Torch Branch Road to regulate the traffic order around.
Except for units and residents along the line, vehicles passing through the construction area should try to bypass Daxue Road, Luban Road and Hengyang Road.
- Previous article:Organizational structure of Dazhou senior technical school
- Next article:What computer configuration do you need to do 3d effects?
- Related articles
- Recommend some poems or essays describing "blue and white porcelain"
- Compared with Nikon D80 and Canon 450D, who is more suitable for portrait shooting?
- What are the interesting places in Jiaozuo?
- Where is the flower sea of Qinhuangdao 20 19?
- Shanghai children photography
- The strongest club is here! "Dance Company" mobile game X Shanghai LINX to create a dance paradise high to turn over the audience!
- Introduction of major tourist attractions in Germany Introduction pictures of major tourist attractions in Germany
- What are orange and pink?
- The position of women's clothing wholesale market in Chongqing
- Best photography software for Ios