Traditional Culture Encyclopedia - Photography and portraiture - "Urban development and transportation first", Chengdu started the expressway construction project of the second ring road viaduct in the central city this year, which will be completed soon.

"Urban development and transportation first", Chengdu started the expressway construction project of the second ring road viaduct in the central city this year, which will be completed soon.

Solution: (1) Let the resolution function be V=kx+b,

Then,

Solution:

So the functional expression of V about X is: V =-X+94;

(2) From the meaning of the question, v =-x+94 ≥ 50,

Solution: x≤88,

p = VX =(-x+94)x =-x ^ 2+94x

When 0 < x ≤ 88, the function is increasing function, that is, when x=88, p takes the maximum value.

Therefore, pmax = ~× 88 2+94× 88 = 4400.

A: When the traffic density reaches 88 vehicles /km, the traffic flow P reaches the maximum, with a maximum of 4,400 vehicles/hour.