Model Safety Assessment Report I. Project Overview:
Project name: Shaya County 17 First Bid Section of Rural Bilingual Kindergarten. Construction site: Tuoyibao Town and Ermuchang, Shaya County.
Construction unit: Xayar County Education Bureau
Construction investment: 4.258 million yuan
Building scale: 262 1.5 1m2
Structure type: brick-concrete structure, one floor above ground.
Survey unit: Xinjiang Geotechnical Engineering Survey and Design Institute.
Design unit: Xinjiang Sifang Architectural Engineering Design Co., Ltd.
Construction unit: Shaya Yongsheng Construction and Installation Engineering Co., Ltd.
Supervision unit: Bazhou Zhicheng Engineering Project Management Service Co., Ltd. Kuqa Branch Engineering Safety Supervision Station: Shaya County Quality and Safety Supervision Station.
Second, the engineering construction safety situation:
At the beginning of this project, according to the evaluation of the surrounding environment, the construction party formulated a feasible safety operation plan, and had a detailed safety responsibility system, and also conducted a three-level safety education for workers. All kinds of signs are posted and hung in place, with professional safety construction organization design, special implementation plan for temporary electricity consumption, and on-site inspection also meets the requirements of the specification. In the foundation construction stage, pay attention to man-machine coordination during dynamic compaction, and strictly control dynamic compaction backfill. Detailed requirements are made for backfill sand, backfill height of garbage content, hauling rolling tools, etc., and attention is paid to process safety control. The construction of foundation reinforcement and formwork concrete ensures the safety of the structure under the premise of strictly following the requirements of design drawings and construction specifications. Operators operate in strict accordance with the requirements of safety regulations, workers wear safety helmets, and border inspectors wear safety belts, which really ensures that there are no safety accidents and potential safety hazards in basic projects.
Three, engineering safety supervision:
In terms of safety supervision, according to relevant national laws and regulations, relevant safety and quality instruction documents of local governments, construction contracts and contractors' safety construction organization design, safety and quality issues are supervised during the construction period, targeted rectification is carried out, and the safety and quality system is continuously improved. Take audit, assistance, patrol tips and other ways to carry out safety production supervision.
1. according to JGJ59-99 standard, construction safety protection measures have been basically implemented, safety measures and records have been approved, and billboards and warning signs on the construction site are basically in place.
2. working grounding adopts TN-C-S system and implements "three-level distribution and two-level protection". It has achieved "one machine, one brake and one box". The distribution box is locked and supervised by a full-time electrician.
3. The grounding resistance of construction electricity is determined to be no more than 0.4 ohm, which meets the specification requirements. The interruption and terminal of distribution system should be repeatedly grounded.
4, distribution box brake, fuse parameters and equipment matching, installation meets the requirements, and lighting leakage protection device.
5. The erection of power cable is greater than the safe distance, and the cable material meets the requirements.
6, mixer set protective shed, normal operation after maintenance.
7, construction and management personnel wear safety helmets, fasten your seat belts.
8, full-time security officer after training and examination, and show certificates. Special operations personnel have been certified.
9. The safety protection of machines, tools and equipment conforms to the JGJ59-99 standard.
10. The block diagram of the safety production management system of the project department has been put on the wall, with the structure diagram of the safety leading group.
1 1. Establish and improve the responsibility system for production safety and the responsibility system for personnel at all levels.
12, equipped with full-time security officer, and implemented to people.
13. There are safety signs and general layout on site.
14, according to the location specified in the general plan, the signboard was specially arranged at the site.
Four. Safety certificate
During the construction of this project, the requirements of design drawings and construction specifications shall be strictly followed to ensure that there are no quality and safety hazards in the engineering structure, and various safety operations on site shall be standardized in strict accordance with the requirements of JGJ59-99 standard. During the whole project implementation, no safety accidents occurred.
Model safety assessment report 2 1. Project overview:
Project name: Hubei Fangtong Pharmaceutical Co., Ltd. Newly-built Xisaishan Industrial Park in Hubei Province
Building engineering office building project
Construction unit: Hubei Fangtong Pharmaceutical Co., Ltd.
Supervision unit: Huangshi Construction Supervision Co., Ltd.
Design unit: Huangshi Jiajing Architectural Design Co., Ltd.
Survey unit: Huangshi Jiajing Architectural Design Co., Ltd.
Construction unit: Huangshi Daxing Engineering Co., Ltd.
The project is located in Hekou Town, Xisaishan District, Huangshi City. The building area is 4146.7m &; Sup2 building has five floors, with fire resistance rating of Grade II, seismic fortification rating of Grade VI, structural system: frame structure, roof waterproof rating of Grade III, and design service life of 50 years.
Second, the engineering safety assessment basis:
1, code for construction safety inspection jgj59-99;
2. Safety Production Evaluation Standard for Construction Enterprises (JJ/T77-2003);
3. Technical Specification for Temporary Electricity Safety in Construction Site JGJ46-2005;
4. Environmental Sanitation Standard for Construction Sites (JJ146-2004);
5. People's Republic of China (PRC) national standard Safety Regulations for Tower Cranes (GB 5144-2006);
6. Technical Specification for Safety of Steel Wire Rope Cargo Construction Elevator DB42/365-2006;
7. Safety technical specification for fastener-type steel pipe scaffold in building construction;
8. Other special regulatory documents related to safety inspection and control.
Third, the safety control in the construction process
Our supervision company reviewed the qualification of construction enterprises and safety production license, the assessment certificates and operation qualification certificates obtained by three types of personnel and special operators, the safety production guarantee system, the responsibility system for safety production, various rules and regulations, the setting of safety supervision institutions, staffing and environmental sanitation standards on the construction site, and the safety licensing acceptance procedures for construction machinery and facilities of the construction unit. For the implementation of safety technical measures and special construction scheme in construction organization design, conduct safety inspection with the management personnel of the construction unit regularly and irregularly, report to the construction unit in time when finding potential safety hazards, and urge the construction unit to make rectification. And often hold safety meetings, requiring construction units to improve safety awareness and respect life. The construction unit attaches great importance to the safety of the construction site and has invested a lot of manpower and material resources for safety control.
As of the completion of the project, no safety accidents have occurred in safety management, and our unit thinks that the safety production of the project is qualified.
At present, China's safety evaluation is divided into four categories according to the life cycle of projects and systems and the purpose of evaluation: safety pre-evaluation, safety acceptance evaluation, safety status evaluation and special safety evaluation. But in fact, it can be regarded as three categories, namely, safety pre-evaluation, safety acceptance evaluation and safety status evaluation. Special safety evaluation can be regarded as a kind of safety status evaluation, which belongs to the evaluation carried out by the government in special rectification in a specific period. This section briefly introduces the requirements, contents and formats of safety pre-evaluation, safety acceptance evaluation and safety status evaluation report.
First, the safety pre-evaluation report
(A) safety pre-evaluation report requirements
The content of safety pre-evaluation report should reflect the tasks of safety pre-evaluation: evaluating the main dangerous and harmful factors of construction projects; Major dangers and harmful factors that should be focused on in construction projects; Important safety countermeasures that should be paid attention to; Whether the construction project conforms to the relevant national laws, regulations and technical standards from the perspective of safety production.
(II) Contents of safety pre-evaluation report The safety pre-evaluation report shall include the following main contents.
(1) Overview:
① Safety pre-evaluation basis. Laws, regulations and technical standards related to safety pre-evaluation; Construction project feasibility study report and other construction project related documents; Other information involved in safety pre-evaluation.
② Brief introduction of the construction unit.
③ General situation of construction projects. Site selection, general plan and layout, production scale, technological process, main equipment, main raw materials, intermediates, products, economic and technical indicators, public works and auxiliary facilities of the construction project.
(2) Brief introduction of production technology.
Second, the safety acceptance evaluation report
(I) Requirements for safety acceptance evaluation report The safety acceptance evaluation report is the result of the safety acceptance evaluation process. The content of safety acceptance evaluation report should reflect the obligation of safety acceptance evaluation from two aspects: first, serve enterprises, help them find out potential safety hazards, implement rectification measures, and meet safety requirements; The second is to serve the government's safety production supervision and management institutions and provide a basis for the safety acceptance of construction projects.
(two) the main contents of the safety acceptance evaluation report
1. Overview
(1) safety acceptance evaluation basis;
(2) Brief introduction of the construction unit;
(three) the general situation of the construction project;
(4) production technology;
(five) the main safety and health facilities and technical measures;
(6) The organization and management system of the safety production management of the construction unit.
2. Identification of main dangerous and harmful factors
(1) Analysis of main hazardous and harmful factors and related workplaces;
(2) List the dangerous and harmful factors involved in the construction project and point out the existing parts.
3. General layout and evaluation of conventional protective facilities and measures
(1) General layout;
(2) Road safety in the factory area;
(3) Conventional protective facilities and measures;
(4) Evaluation results.
4. Evaluation of inflammable and explosive places
(1) Conformity check of explosion danger zone division;
(2) Protection, installation and inspection of combustible gas leakage detection alarm instrument;
(3) Installation license of explosion-proof electrical equipment;
(4) fire inspection (mainly to check whether the fire safety approval has been obtained);
(5) Evaluation results.
5. Evaluation of safety control measures for harmful factors
(1) Measures to prevent acute poisoning and suffocation;
(2) Measures to prevent dust explosion;
(3) Safety protection measures for high and low temperature operation;
(four) safety measures to control other harmful factors;
(5) Evaluation results.
6. Evaluation of special equipment supervision and inspection records
(1) pressure vessels and boilers (including pressure pipes);
(2) Lifting machinery and elevators;
(3) Motor vehicles in the factory;
(4) Other dangerous equipment;
(5) Evaluation results.
7. Compulsory inspection of equipment and facilities.
(1) safety valve;
(2) pressure gauge;
(3) combustible and toxic gas leakage detection alarm instrument and transmitter;
(4) Other compulsory testing equipment and facilities;
(5) inspection results.
8. Electrical safety assessment
(1) substation;
(2) distribution room;
(3) Lightning protection and antistatic system;
(4) Other electrical safety inspections;
(5) Evaluation results.
13. Attachment of safety acceptance evaluation report
(1) Chart files produced during safety evaluation, such as data sheets, floor plans, flow charts, control charts, etc.;
(2) Summary of existing problems and improvement suggestions of construction projects and feedback results;
(3) Expert opinions and supporting materials of the construction unit in the process of bid evaluation.
14. Appendix to Safety Acceptance Assessment Report
(1) Approval documents related to the construction project (copy);
(2) the original data provided by the construction unit;
(3) Catalogue of related materials of construction projects.
(3) the format of safety acceptance evaluation report
(1) cover;
(two) a copy of the qualification certificate of safety acceptance evaluation of the evaluation institution;
(3) Description item;
(4) catalogue;
(5) preparation instructions;
(6) Preface;
(7) text;
(8) attachments;
(9) Appendix.
Third, the safety status evaluation report
(1) The safety status assessment report requires that the content of the safety status assessment report should be more detailed and specific than that of the safety pre-assessment report, especially for hazard analysis. Therefore, the preparation of the whole evaluation report should be completed by experts who know the process and operation.
(II) Contents of the safety status assessment report The safety status assessment report generally has the following contents.
1. Introduction
Including the introduction of the project unit, the evaluation of the project entrusting party, the evaluation requirements and the evaluation purpose.
review
Overview of evaluation project
It should include the general situation, geographical location and natural conditions, technological process, production and operation conditions, the scope of assessment agreed by the project commission and the basis of assessment (including the laws, regulations, standards, specifications and related documents of the project).
3. Evaluation procedures and methods
Explain the evaluation procedures and methods selected according to the main hazards, harmful factors and production characteristics.
4. Pre-risk analysis
It should include process flow, process parameters, control mode, operating conditions, material type and physical and chemical characteristics, process layout, general layout position and public works, and analyze the dangerous and harmful factors in production one by one by using the selected analysis method.
5. Risk degree and risk index analysis
According to the analysis results of dangerous and harmful factors and the determined evaluation units and elements, and referring to relevant information and data, the selected evaluation method is used for quantitative analysis.
6. Accident analysis and major accident simulation
Combined with the field investigation results and accident case analysis of the same or similar production, the causes and probability of accidents are counted, and the corresponding mathematical model is used to simulate major accidents.
7. Countermeasures and suggestions
According to the comprehensive evaluation results, the corresponding countermeasures and suggestions are put forward, and the solutions are sorted according to the degree of risk.
8. Evaluation conclusion
Clearly point out the safety status level of the project and briefly explain it.
(3) safety status evaluation report format
& gt& gt& gt On the next page, there are more "Safety Assessment Summary Model Articles".
- Previous article:Main Identification of Jingzhou Ancient City Wall
- Next article:Poetic chapter of life
- Related articles
- How to make handmade photo albums
- Summer has arrived. What do you see in nature?
- How do ordinary flower photos produce creative effects?
- Personal data of Zitangsu
- It doesn't rain, but it works all day —— Analysis of Fireworks in the Day
- How to evaluate Zhang Guoli's acting skills in Xiao Shede?
- The detailed process of going to the cinema to see a movie
- What about Beijing Qiyan Film and Television Culture Media Co., Ltd.?
- How about Shaanxi Wei Ming Shang Feng Culture Media Co., Ltd.
- Jiangsu ren photography club