Traditional Culture Encyclopedia - Photography and portraiture - When will xiaodian district Malianying West Road be completed?
When will xiaodian district Malianying West Road be completed?
At the end of July 2022.
Xiaodian district Malianying West Road 20 19 and 10 were put into construction at the end of the year, and it is planned that the extension line of Malianying West Road will be completed and opened to traffic by the end of July 2022.
Malianying Road is a north-south urban traffic trunk road, located in the core area of Shanxi Kechuang City. The section from Longcheng Street to Wu Luo Street of Malianying Road is 5.5 kilometers long and the planned red line is 50 meters wide. The design standard is urban main roads with a design speed of 50 kilometers per hour.
- Previous article:Meet the big coffee introduction
- Next article:The story of the sea ends here, and the sea begins in Sri Lanka.
- Related articles
- Can the camera be free of warranty?
- Can technical secondary schools change engineering surveying into surveying and mapping geographic information technology?
- Wang Pengxuan's Activity Experience
- How to stir-fry beans with home-cooked meat?
- What courses are there in Yanqing Children's Palace?
- How to draw the starry sky with colored lead
- How does the mother-infant agent drain?
- Dreaming of catching chinemys reevesii in the water
- This paper introduces the time and place of the Great Wall Cultural Festival in Beijing in 2022, as well as the details of the activities.
- What is the goal of strengthening the construction of a clean government culture?