Nowadays, the awareness of rights protection among many citizens is constantly increasing. Contracts may be used anytime, anywhere and in various scenarios. Contracts are a very important factor in the development of enterprises. So how is a general contract drafted? The following is a solid wood furniture customization contract that I have carefully compiled (selected 5 articles). You are welcome to learn from and refer to it. I hope it will be helpful to you. Solid wood furniture customization contract 1

Party A: _______

Party B: _______

After negotiation between the two parties, Party A entrusts Party B to make the whole room furniture, and hereby signs the following contract :

1. Contract content

See production drawings and lists (no changes will be made after ordering);

2. Material requirements

Made of E1-level nationally certified environmentally friendly solid wood particle board materials;

3. Processing, acceptance, and after-sales service methods

Party B is responsible for the labor and material production, and should select raw materials in strict accordance with the contract provisions, and Accept inspection by Party A. The drawings and materials approved by Party A shall prevail. It is normal for the size error to be within 2mm. A gap of less than 2mm between the wall and the wall is normal. When Party B conceals defects in raw materials or uses raw materials that do not comply with the contract and affects the quality of the goods, Party A has the right to require redoing, repair, and quality assurance. If quality problems occur during the warranty period, Party B shall repair them free of charge (including material fees and labor time fees).

4. Delivery time and location

Delivery shall be made within 30 days from the date A pays the deposit to Party B. The delivery is delivered directly to the owner's home. If delays occur due to production delays or quality issues, Party B will pay Party A one thousandth of a liquidated damages for each day overdue.

5. Payment method and term

The total payment for the overall furniture customization: ______ yuan. After signing the contract, A pays Party B a 60% deposit: ______ yuan, and the manufacturer starts processing and production. After delivery and installation are completed, Party A will pay Party B 40% of the balance: ______ yuan upon acceptance.

The total price is calculated based on the furniture construction area. Sign the contract after calculating the accurate total price. The contract cannot be changed after it is signed and delivered to the factory. The balance must be paid within three days after delivery is completed, and Party A shall pay one thousandth of the liquidated damages to Party B for each day overdue. The balance has not been settled within fifteen days. Party B has the right to disassemble the goods and return them to the factory, and the deposit will be voided;

6. Liability for breach of contract

If Party A changes the order midway, Party A shall compensate Party B for the losses caused thereby. If Party A abandons the contract midway, it shall compensate Party B for all economic losses caused thereby. If Party B changes the order midway, Party B shall compensate Party A for any losses caused thereby. If Party B abandons the contract midway, it shall compensate Party A for all economic losses caused thereby.

7. Disputes or Dispute Resolution

When a dispute arises between the two parties during the performance of this contract, the two parties can resolve it through negotiation or ask the relevant departments to resolve it, provided that it does not affect the processing progress. Mediation.

When the parties are unwilling to resolve the dispute through negotiation or mediation or the negotiation or mediation fails, both parties agree that disputes arising during the execution of this contract shall be arbitrated by the local arbitration committee. If the parties do not agree on an arbitration institution in this contract and fail to reach an agreement afterwards. If there is a written arbitration agreement, you can file a lawsuit in the People's Court.

8. Other matters

If there are any matters not covered in this contract, they must be revised through negotiation between the two parties. If the negotiation fails, the relevant provisions of the law will apply.

This contract is made in two copies, with each party holding one copy, and it will take effect from the date of signature.

Party A: _______Party B:_______

_______year_______month_______day_______year_______month_______day solid wood furniture customization contract 2

Customer (Party A):_______

Contractor (Party B):_______

In order to safeguard the legitimate rights and interests of both parties A and B, in accordance with the " The People's Republic of China and the Civil Code, the "People's Republic of China and the Domestic Product Quality Law" and other laws, regulations and relevant provisions, this contract is concluded after consensus reached by both parties.

1. Product name, materials, specifications, quantity, price

2. Payment method

(1) Deposit: _____________ Party A in ______ Pay RMB________ to Party B as a deposit on ______month______.

(2) Final payment: ____________ Party A shall pay Party B RMB________ yuan as the final payment on the day when the furniture installation is completed.

3. Furniture delivery deadline, location and method, freight settlement, transportation risk assumption and installation agreement

(1) Party B is responsible for installing the furniture, and the delivery location and time shall be determined by Party A and Party A. Party B agrees to the agreement.

(2) Party B is responsible for the delivery, and the freight and transportation risks shall be borne by Party B;

IV. Party A’s rights and obligations

(1) Party A It has the right to inspect the materials used by Party B.

(2) Party A shall provide furniture drawings, samples, technical requirements and other materials in accordance with the contract.

(3) Party A shall assist Party B in completing the work.

(4) Party A shall receive the furniture in time and conduct inspection.

(5) Party A shall pay the price in accordance with the time and method stipulated in the contract.

(6) During the performance of the contract, Party A has the right to supervise and inspect the quality and quantity of the furniture, but shall not hinder Party B's normal work.

5. Party B’s rights and obligations

(1) Party B shall promptly confirm the rationality of the drawings, samples, technical data, etc. provided by Party A.

(2) If Party A fails to pay the price, Party B shall have the right of lien on the completed furniture unless the two parties agree on an exception.

(3) Party B shall deliver the furniture in accordance with the contract.

6. Acceptance

Party A should inspect the materials, quantity, trademark, specifications, color, etc. of the furniture. If there are any objections, they should be raised in a timely manner.

VII. Quality requirements and technical standards of furniture

(1) Quality standards: ____________ implements □national/□local/□enterprise furniture product standards.

(2) Safety standards: ____________ implements the gb18584-__________ limit standards for hazardous substances in wooden furniture.

(3) After-sales liability guarantee: ____________ implements the "National Furniture Industry Product "Three Guarantees" Responsibility Rules".

8. Liability for breach of contract

(1) If the quantity of furniture delivered by Party B is insufficient, Party A has the right to require Party B to make up for it and bear the corresponding liability for breach of contract.

9. Change and Termination

If Party A changes or terminates the contract midway, it shall notify Party B in writing. If any losses are caused to Party B, the corresponding losses shall be compensated.

10. Force Majeure

(1) If any party is unable to perform the contract in whole or in part due to force majeure, it may be exempted from corresponding liability. However, liability cannot be exempted if force majeure occurs after delay in performance.

(2) In the event of force majeure, the party shall promptly notify the other party in writing.

11. This contract is made in 2 copies, with Party A and Party B each holding one copy.

Party A: _______Party B:_______

_______year_______month_______day_______year_______month_______day solid wood furniture customization contract 3

Party A: _________

Party B: _________

After negotiation between the two parties, in accordance with the relevant provisions of the "Contract Law of the People's Republic of China", we hereby sign the following Contract:

1. Contract content:

1. TV background wall and TV cabinet

2. Balcony bookcase

3. Cabinet and large wardrobe

4. Eight roofs (including gypsum lines and gussets)

5. Shoe cabinet

6. Computer desk

The above furniture is priced according to Party A (carpenter)’s own charging standards

2. Quality requirements:

Party A (carpenter) must ensure the quality of the furniture, and It accepts relevant types of work that are based on remuneration, and has a specific usage period guaranteed. If any related losses occur during the agreed period of use, other than product quality or improper human use, Party A (the carpenter) will be responsible for all related personal safety damage caused.

3. Processing and after-sales service methods:

Party A is responsible for the full package of work and shall strictly follow the construction regulations in the contract and accept inspection by Party B.

The warranty period is _____ years. During the warranty period, if there is a quality problem with the furniture, Party A shall repair it free of charge (including material fees and labor hours).

IV. Acceptance standards and methods:

Party A delivers the goods to Party B for acceptance. If it does not meet the standards, Party A is responsible for modifying or replacing it until it passes the acceptance.

5. Payment method and term:

After the project is completed and the acceptance is passed, _____ yuan will be paid, and the remaining balance of 2,200 yuan will be delivered to Party B once the rest of the work is completed, such as Paint type of work. On the date of payment of the final payment, Party B has the right to require Party A to perform the promised work. If there is a breach of contract, Party B has the right to reduce or reduce the salary; if Party A is dissatisfied, it can be handed over to the relevant department for proper handling.

6. Liability Issues

During the period when Party A was working at Party B’s home, Party A caused unnecessary damage to all the hardware in Party B’s home. If Party B did not pursue the case, Party A has the right to Obligation to manage and improve its unfinished affairs until Party B is satisfied.

7. If there are any unsettled matters in this contract, they must be revised through negotiation between both parties. If the negotiation fails, the relevant provisions of the Contract Law will apply.

This contract is made in two copies, with each party holding one copy, and it will take effect from the date of signature.

Party A: _______Party B:_______

_______year_______month_______day_______year_______month_______day solid wood furniture customization contract 4

Buyer: _______

Seller: _______

In order to protect the legitimate rights and interests of consumers and business operators, in accordance with the "Consumer Rights and Interests of the People's Republic of China" Protection Law of the People's Republic of China, Contract Law of the People's Republic of China and relevant provisions, sign this contract and agree to abide by it.

1. Product name, model, quantity, time and amount

Product name__________

Specification model___________

Unit_ _________

Quantity___________

Unit price__________

Material and others__________

Amount_________

Total RMB amount (uppercase): __________

Total lowercase_______

2. Place of delivery (pickup) and method ____________________________.

3. During the warranty period (_____) of the product, if quality problems occur, the manufacturer shall be responsible for repair (_____) or replacement (_____)

4. Payment method and period: Party A and Party B agree to pay the price by __________________.

a. One-time payment: the entire payment of __________ yuan shall be paid when signing this contract.

b. Installment payment: When signing this contract, the payment for goods is __________ yuan in advance, and the remaining balance is paid by _____________ yuan.

5. Customized product drawings are provided by the buyer to the seller Processed and manufactured according to drawings.

For goods with customized specifications by the buyer, the buyer shall deliver the drawings in duplicate to the seller before ____ month ____ of _____ year. After the seller approves and signs (seals) them, * **One copy shall be returned to the buyer for retention (such orders will not be returned or exchanged if there are no serious quality problems).

6. Transportation methods and cost _______________________________.

7. Acceptance standards, methods and time limit for raising objections_______________________________.

8. Liability for breach of contract

If the buyer terminates the contract midway, it shall pay the seller liquidated damages, which ranges from 20% to 60% depending on the specific progress of the project.

9. Methods for resolving contract disputes:

1. Resolve through negotiation between the two parties

2. Request mediation from the Consumer Association

3. Complaints to relevant administrative departments

4. Submit to an arbitration institution for arbitration

5. File a lawsuit to the People's Court

10. Other agreed matters:

This contract will take effect after being signed and sealed by Party A and Party B. If the contents of the contract are contrary to national laws, regulations and industry standards, the provisions of laws, regulations and industry standards shall be followed.

Party A: _______Party B:_______

_______year_______month_______day_______year_______month_______day solid wood furniture customization contract 5

Party A (ordering party): _______

Party B (seller): _______

According to the relevant provisions of the "People's Republic of China and Civil Code" , both parties reached an agreement as follows: ____________

Article 1: Before Party B’s designers come to measure the dimensions, Party A needs to pay a deposit of _______ yuan, which can be used as a deposit against the purchase price.

Article 2: Party B shall provide the design drawing within _ days after measuring the dimensions. After Party A completes the basic engineering (i.e. ceiling, wall and floor tiles, water and electrical layout) according to the design drawings issued by Party B, Party A will notify Party B to retest and modify the drawings. The drawings signed and confirmed by Party A and Party B shall be the final design drawings.

Article 3: The drawings shall not be changed at will after confirmation. If one party needs to make major modifications to the determined design drawings, it must obtain the consent of the other party and be signed and confirmed by both parties. The cost will be increased or decreased according to the actual situation, and the installation time will be postponed accordingly.

Article 4: Payment method

(1) Project location: _______________________, total project price is: _______________ (lower case) __________ (upper case).

(2) The materials used are: ____________________.

Article 5: Delivery Period

Party B shall deliver the goods before ____ month ____ of _____ year. Party B must notify Party A days in advance for delivery and installation.

Article 6: Delivery, installation and quality assurance

Party B shall bear the transportation costs and handling costs of ____________________ (region), but Party A’s property management department shall bear the charges. bear. Party B guarantees the quality of the products provided and guarantees repairs within one year and lifetime maintenance (material fees will be charged). If Party A fails to pay the balance, it will not enjoy any quality warranty and maintenance.

Article 7: Responsibilities of both parties

(1) Responsibility of Party B

1. After Party A pays the deposit, Party B fails to provide the design drawing within the agreed time. Party B shall return double the deposit to Party A.

2. Party B shall process and manufacture strictly according to the design drawings determined by both parties. If the finished product is inconsistent with the contract due to Party B's fault, Party B shall bear the responsibility.

3. If Party B delays delivery, Party B shall pay Party A a penalty of _______ yuan for overdue delivery based on _______% of the total payment value for each day of delay.

(2) Party A’s Responsibilities

1. If Party B submits the design drawing, the deposit will not be refunded.

2. After Party A pays, Party B will start production. If Party A requests a return, the payment will not be refunded and will be used as a loss of raw materials.

3. If Party A pays late, he shall bear liquidated damages equal to ________% of the total payment for each day of delay.

Article 8: If Party A and Party B are unable to perform or need to postpone the performance of this contract due to force majeure, they shall promptly notify the other party and explain the reasons for the inability to perform or the need to postpone performance.

Article 9: If any dispute arises during the execution of this contract, Party A and Party B shall resolve it through negotiation. If negotiation fails, the dispute may be resolved in the following _______ way: ____________

1. Submit to ______ Arbitration Commission for arbitration;

2. File a lawsuit with the People’s Court in accordance with the law.

Article 10: During the execution of this contract, if there are any unsatisfied matters, the two parties will negotiate and formulate additional appendices to this contract. All appendices shall have the same legal effect as this contract.

Article 11: This contract is made in two copies, with Party A and Party B each holding one copy.

Party A:_______Party B:_______