Traditional Culture Encyclopedia - Tourist attractions - Qin-Zheng Tai high-speed rail connecting line runs through the whole line.
Qin-Zheng Tai high-speed rail connecting line runs through the whole line.
It's only 10 minutes from the county seat to high-speed railway station.
65438+February 14, the reporter learned in an interview in Qinxian that the expressway-Qinxian Zheng Tai high-speed rail connection line with a total length of 17 kilometers was completed recently, and it only takes more than 10 minutes to drive from Qinxian to Zheng Tai high-speed rail Wuxiang Station, and Qinxian economy and society will usher in new development opportunities.
Newly-built Zheng Tai high-speed rail connecting line of Qin line.
Zheng Tai high-speed rail connecting line in Qinxian county is a key project in this county, starting from Wuxiang Station of Zheng Tai high-speed rail and ending at Yaoshang Interchange of National Highway 208, including four entrances and exits of National Highway 208, Beisi, Qiangying and Modern Agricultural Industrial Park. The total length of this connecting line is 17.409km, including 35 culverts, 16 passages and1bridges. It is an important channel connecting Qin line and Zhengzhou-Taiyuan high-speed railway. The whole line adopts the first-class highway standard, with six lanes in both directions, the subgrade width is 30m, and the designed driving speed is 80km \ h. In order to break the local traffic bottleneck and facilitate the people to enjoy the convenience brought by Zhengzhou-Taiyuan high-speed railway, Qinxian County began to build an important passage from this county to high-speed railway station in May 2065438+2009. After two and a half years of hard construction, this connecting line has been fully connected. In other words, it only takes more than 10 minutes from the county seat to the Wuxiang station of the high-speed railway, which greatly facilitates people's travel.
The connecting line of Zhengzhou-Taiyuan high-speed railway is an important part of building a "big traffic" pattern in Qinxian County. This road not only further improves the regional road network, but also allows vehicles passing through National Highway 208 and Provincial Highway 322 to avoid the county seat, thus alleviating the traffic pressure in the county seat. It is of great significance to enhance the location advantages of counties, accelerate the flow of talents, technology and funds, and promote regional economic and social development. This fast lane of revitalization and development will bring new development opportunities to Qin County and inject new kinetic energy into promoting the high-quality development of Qin County.
The reporter saw in the interview that at present, the highway reconstruction project of Qinxian-Zheng Tai high-speed rail connecting line (from the intersection of traffic bureau to the upper section of Beisi) has started construction, and the local traffic police and traffic bureau issued an announcement to close the relevant sections. After the completion of this road, people in Qin County will travel more conveniently.
?
Lakeside plum
Sales reference price: the price is to be determined.
Address: Intersection of Wei Ming Road and Huangnan Road in Qin County.
Property telephone number: 400-8 18-0066 to 07574 1.
- Related articles
- What is Song XiaoboĄŻs profession?
- Ten maple scenic spots, one is redder than the other! Don't miss it, miss it and wait another year.
- Shitan Village Travel Guide Huangshan Shitan Village Travel Guide
- How about Jiangsu Dolphin Travel Agency Co., Ltd.?
- Accommodation guide and tour route recommendation of Oriental Salt Lake City
- What shoes should I wear for a five-day trip to Beijing?
- /kloc-where to travel abroad in October? Are you online? Very good!
- Why is JiĄŻanĄŻs consumption so high?
- How to promote the construction of new countryside by developing rural tourism
- Is it enough for 32,000 people to travel to the mainland for three months?