Traditional Culture Encyclopedia - Tourist attractions - When will the Beijing-Tangshan intercity railway be opened to traffic? How many times a day does the Beijing-Tangshan intercity railway run?

When will the Beijing-Tangshan intercity railway be opened to traffic? How many times a day does the Beijing-Tangshan intercity railway run?

The Beijing-Tangshan Intercity Railway was officially put into operation on September 30, 2022, with a daily average of 1 1 train. The Beijing-Tangshan Intercity Railway starts from Beijing Station and ends at Tangshan Station in Tangshan, Hebei Province. Total length 148.74 km. For Beijing-Tangshan intercity railway, this is a very important line in the intercity rail transit network in Beijing-Tianjin-Hebei region.

Beijing-Tangshan Intercity Railway officially started construction on February 29th, 2006. After several years of hard work, it was finally put into operation on September 30, 2022. There are 8 stations along the Jingtang Intercity Railway, including Yanjiao Station, Xianghe Station, Yutian South Station and Tangshan Station. The top speed is 350 kilometers per hour.

The maximum design speed of Beijing-Tangshan intercity railway will be different in different regions. For example, the maximum design speed between Beijing Railway Station and Yanjiao Railway Station is 200 kilometers per hour. The maximum design speed between Yanjiao Station and Dachang Station is 250 kilometers per hour. From Dachang Station to Xianghe Station, the maximum design speed is 300km per hour. Then between Xianghe Station and Tangshan Station, the maximum design speed is 350 kilometers per hour.

Since the opening of Beijing-Tangshan intercity railway, it will bring great help to the economic development of cities along the line, and also effectively improve the development demand of regional economic integration and the service level of corridor transportation. Even this Beijing-Tangshan intercity railway will bring great help to the tourism integration in the Bohai Rim region.