Traditional Culture Encyclopedia - Tourist attractions - Real-time report on Sichuan-Tibet line conditions
Real-time report on Sichuan-Tibet line conditions
Download the Brahmashake app for real-time traffic conditions
Traffic control - According to the notice issued by the People's Government of Ganzi Prefecture, due to the implementation of National Highway 318 from Kangding City to Dong'eruo, Xinduqiao Town During the village road repair project, from April 21st to August 20th, the traffic control section will be fully closed traffic control period from 8:00 to 14:30 and 15:30 to 18:00 every day, and all types of motor vehicles are prohibited. Vehicle traffic (including: passenger shuttle buses and small motor vehicles are released from 14:30 to 15:30 every day, and all motor vehicles are released from 18:00 to 8:00 the next day. Traffic control is not yet implemented on the Kangding Princess Bridge, and there are many obstacles in the way. The control starts 1 kilometer down the mountain in the direction of Duqiao, and is controlled at the intersection of the G318 national highway in the direction of Xinduqiao to Zheduoshan and the direction of Jiangba Grassland.
The control time is obtained from the on-site traffic police: every morning. Traffic control will start from 8:00 to 12:00, and the traffic will be released from 13:00 to 18:00, and the traffic will be released from 18:00 to 8:00 the next morning. Please note that the release time will be different from the on-site notice. Depending on the construction situation, the release time will generally be advanced or extended.
Traffic Control 2 (the section adjacent to the Sichuan-Tibet Line) Provincial Highway 215 from Bamei Town to Tagong Town will be subject to traffic control before October 31.
Due to the road overhaul project on the section of the original Provincial Highway 215 from Bamei Town, Daofu County to Tagong Town, Kangding City, traffic control will be implemented on this section during the construction period from May 16 to October 31.
Every day from 8:00 to 12:00 and 13:00 to 18:00 are fully closed traffic control periods. Passenger shuttle buses and small motor vehicles are released from 12:00 to 13:00 and 18:00. All motor vehicles will be released at 8:00 the next day.
Special reminder that due to flood damage from Batang to Mangkang, the detour route is: Xindu Bridge (0km) - Tagong (33km) - Bamei (62km). )-Daofu (139km)-317 to Qamdo (709km)-318 Bangda (880km)
Tagong to Bamei Town from 8:00 to 12:00 and 13:00 to 18. :00 is for release at other times during fully closed traffic control periods.
- Related articles
- Is Jiangxi tourism open?
- Do I need to make an appointment at Peking University Secler Archaeological Art Museum? Business?Hours?
- Gunniujiang is known as the "Little Jiuzhaigou" in southern Anhui. The entrance fee to beautiful scenery is low. Why is there still no one traveling there?
- Hanzhong Wulong Cave Tourist Guide Hanzhong Wulong Cave Scenic Area
- How long does it take from Chengdu to Jiuzhaigou by bus?
- On the characteristics and value of scenic spots combining religious culture with tourism (slightly short, short answer)
- Is the electronic contract for tour groups valid?
- Qingdao tour group, foreign tourist routes
- The name of the healing department landscape blogger
- How to get to Phoenix Mountain in Fushan?