Traditional Culture Encyclopedia - Tourist attractions - What key construction areas should be created to coordinate the promotion of the Great Wall and Grand Canal?

What key construction areas should be created to coordinate the promotion of the Great Wall and Grand Canal?

Build the Yellow River National Cultural Park construction area and coordinate the promotion of the Great Wall and Grand Canal.

The major strategic decisions proposed in the report of the 19th National Congress of the Communist Party of China, in order to implement the spirit of the General Secretary’s series of important instructions on the construction of national cultural parks, are based on the "Regulations of the General Office of the Central Committee of the Communist Party of China and the General Office of the State Council" In accordance with the requirements of the "Notice issued", the Ministry of Natural Resources, the Ministry of Culture and Tourism, the National Forestry and Grassland Administration, and the State Administration of Cultural Heritage jointly organized the preparation of the "Grand Canal National Cultural Park Construction and Protection Plan" (hereinafter referred to as the "Plan").

The "Plan" takes the protection, inheritance and utilization of the Grand Canal as the core, and strengthens the coordination of the overall style of the canal water town in accordance with the ideas of river as line, city as bead, bead as string and line as surface. Pay attention to handling the relationship between culture and ecology, and strive to create one river, two belts and ten districts.

Among them, one river, two belts and ten areas refer to the Grand Canal as the main line, the 10-50 meter range on both sides of Hedi Road and important nodes and important routes and waterways as the landscape belt, and the Grand Canal as the main line. The heritage points along the line are key areas and are divided into spatial carriers such as controlled protected areas, theme functional areas, cultural landscape roads, important nodes, and connected points on the line (belt) to form a line (belt). The "Plan" clarifies the key tasks for the construction of the Grand Canal National Cultural Park.

Requirements for the construction of the Yellow River National Cultural Park

1. Protect the heritage resources of the Grand Canal, including the Grand Canal’s material cultural heritage, intangible cultural heritage and major construction achievements related to the contemporary canal, etc. ;

2. Strengthen the ecological protection and restoration of the Grand Canal, and maintain the natural ecological environment along the Grand Canal;

3. Promote the excavation and analysis of the cultural heritage of the Grand Canal, including improving the Grand Canal The identification system of cultural heritage will deeply explore the historical and cultural connotation of the Grand Canal and promote the innovation and transformation of the Grand Canal culture;

4. Strengthen the inheritance and utilization of the Grand Canal heritage, promote the construction of the Grand Canal cultural tourism brand, and create A canal cultural tourism route with international influence;

5. Improve the management level of the Grand Canal National Cultural Park, strengthen the management and supervision of the Grand Canal National Cultural Park, and improve relevant regulations and policy systems.